| Sl No. | District
As per Census (2011)
|
Scheme SM Code | Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Type
Type of Scheme as per PHED-MIS
|
Name of JE entrusted | SLSSC Date
Date of SLSSC in which the Scheme has been Approved
|
FHTC Involved
Approved FHTC Count Modified after the appropriation in YDU considered under the Schemes for which Work Order has been Issued as per PHED-MIS
|
Estimated Cost | AAFS Cost
Approved Implementation as mentioned in AAFS considered under the Schemes for which Work Order has been Issued as per PHED-MIS
|
Date of First Work Order
Total No. of Work Orders Issued under the Scheme as per PHED-MIS
|
No. of Work Orders Issued
Total No. of Work Orders Issued under the Scheme as per PHED-MIS
|
Work Value
Total Cost for all the Issued Work Order under the Scheme as per PHED-MIS
|
Payment
Total Payment made for these Work Orders as per PHED-MIS
|
Payment % | Physical Progress % |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 223 | 3,63,885 | 89,667.02 | 89,667.02 | # | 2,593 | 76,220.55 | 51,254.23 | # | # | ||||||
| 1 | ALIPURDUAR | SM/07057 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jateswar Water Supply Scheme (Phase-1) | Retrofitting | RWS Falakata Block | 25/09/2020 | 2,066 | 99.09 | 99.09 | 01/04/2022 | 14 | 139.46 | 139.80 | 100.24 | 90 |
| 2 | ALIPURDUAR | SM/07058 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Bakla Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 1,036 | 82.69 | 82.69 | 31/08/2020 | 6 | 82.04 | 76.99 | 93.84 | 90 |
| 3 | ALIPURDUAR | SM/07059 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Chotosalkumar Piped Water Supply Scheme (Phase-1) | Retrofitting | RWS Falakata Block | 25/09/2020 | 967 | 97.58 | 97.58 | 03/09/2020 | 11 | 118.74 | 145.80 | 122.79 | 90 |
| 4 | ALIPURDUAR | SM/07060 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Patlakhawa Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,400 | 86.77 | 86.77 | 03/09/2021 | 9 | 65.01 | 171.88 | 264.39 | 90 |
| 5 | ALIPURDUAR | SM/07061 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Patlakhawa Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,581 | 93.85 | 93.85 | 03/09/2021 | 7 | 48.48 | 119.46 | 246.41 | 55 |
| 6 | ALIPURDUAR | SM/07062 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Uttar Kamakshyaguri Piped Water Supply Scheme (Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 2,826 | 87.86 | 87.86 | 06/09/2021 | 10 | 121.02 | 94.91 | 78.43 | 95 |
| 7 | ALIPURDUAR | SM/07063 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Salsalabari Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 1,709 | 91.90 | 91.90 | 13/09/2021 | 8 | 108.03 | 102.20 | 94.6 | 95 |
| 8 | ALIPURDUAR | SM/07064 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Hantupara Tea Garden Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,612 | 99.04 | 99.04 | 16/09/2020 | 9 | 70.44 | 178.48 | 253.38 | 90 |
| 9 | ALIPURDUAR | SM/07065 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Kaijali Basty Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 596 | 73.85 | 73.85 | 13/05/2022 | 7 | 60.19 | 34.11 | 56.67 | 90 |
| 10 | ALIPURDUAR | SM/07066 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 2,682 | 80.75 | 80.75 | 13/05/2022 | 8 | 90.59 | 78.08 | 86.19 | 90 |
| 11 | ALIPURDUAR | SM/07067 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Radharani T.G Water Supply Scheme (Phase-1) | Retrofitting | RWS Kalchini Block | 25/09/2020 | 345 | 98.86 | 98.86 | 03/09/2020 | 10 | 143.29 | 98.86 | 68.99 | 95 |
| 12 | ALIPURDUAR | SM/07068 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dimdima T.G Water Supply Scheme (Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,509 | 85.62 | 85.62 | 21/01/2023 | 8 | 88.75 | 78.16 | 88.07 | 90 |
| 13 | ALIPURDUAR | SM/07069 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dimdima T.G Water Supply Scheme (Phase-2) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,509 | 61.34 | 61.34 | 03/09/2020 | 5 | 58.30 | 61.33 | 105.2 | 90 |
| 14 | ALIPURDUAR | SM/07121 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Birpara (APD) Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 2,686 | 82.27 | 82.27 | 13/05/2022 | 7 | 83.23 | 79.34 | 95.33 | 90 |
| 15 | ALIPURDUAR | SM/07122 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-III, Phase-2) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,623 | 98.68 | 98.68 | 05/10/2021 | 5 | 118.71 | 98.68 | 83.13 | 95 |
| 16 | ALIPURDUAR | SM/07123 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-III, Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,051 | 98.96 | 98.96 | 13/09/2021 | 10 | 117.77 | 112.42 | 95.46 | 95 |
| 17 | ALIPURDUAR | SM/07124 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Purba Chenpani Piped Water Supply Scheme (Phase-2) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,477 | 55.28 | 55.28 | 15/12/2020 | 3 | 51.41 | 47.81 | 93 | 95 |
| 18 | ALIPURDUAR | SM/07125 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-II, Phase-2) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,051 | 90.17 | 90.17 | 05/10/2021 | 5 | 102.55 | 90.17 | 87.93 | 95 |
| 19 | ALIPURDUAR | SM/07126 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-II, Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,051 | 93.00 | 93.00 | 05/10/2021 | 6 | 153.73 | 171.91 | 111.83 | 95 |
| 20 | ALIPURDUAR | SM/07127 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-I, Phase-2) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,051 | 66.37 | 66.37 | 13/09/2021 | 8 | 95.80 | 71.36 | 74.49 | 95 |
| 21 | ALIPURDUAR | SM/07128 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Tapshikatha Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 895 | 62.07 | 62.07 | 03/09/2021 | 8 | 71.62 | 62.07 | 86.67 | 61 |
| 22 | ALIPURDUAR | SM/07129 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jagijhora Barabak Piped Water Supply Scheme | Retrofitting | RWS Falakata Block | 25/09/2020 | 1,328 | 72.16 | 72.16 | 15/12/2020 | 6 | 55.12 | 116.02 | 210.49 | 90 |
| 23 | ALIPURDUAR | SM/07130 | FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DHUMCHIPARA T.G. Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,568 | 94.15 | 94.15 | 16/09/2020 | 9 | 110.84 | 95.72 | 86.36 | 60 |
| 24 | ALIPURDUAR | SM/07131 | FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DHEKLAPARA T.G. Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 567 | 73.16 | 73.16 | 03/09/2020 | 7 | 73.19 | 107.51 | 146.89 | 10 |
| 25 | ALIPURDUAR | SM/07132 | FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DALMORE RAMJHORA T.G. Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,847 | 88.70 | 88.70 | 22/09/2022 | 6 | 25.76 | 18.55 | 72.01 | 50 |
| 26 | ALIPURDUAR | SM/07133 | FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DALMORE RAMJHORA T.G. Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,169 | 95.65 | 95.65 | 20/08/2020 | 9 | 60.38 | 148.59 | 246.09 | 88 |
| 27 | ALIPURDUAR | SM/07134 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Purba Chenpani Piped Water Supply Scheme (Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,477 | 89.44 | 89.44 | 10/08/2022 | 4 | 71.75 | 100.64 | 140.26 | 95 |
| 28 | ALIPURDUAR | SM/07135 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paschim Khairbari Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 822 | 87.03 | 87.03 | 14/10/2020 | 6 | 116.65 | 109.44 | 93.82 | 95 |
| 29 | ALIPURDUAR | SM/07136 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paschim Khairbari Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 822 | 80.05 | 80.05 | 15/12/2020 | 5 | 77.51 | 67.16 | 86.65 | 80 |
| 30 | ALIPURDUAR | SM/07137 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dalimpur Piped Water Supply Scheme (Phase-1) | Retrofitting | RWS Falakata Block | 25/09/2020 | 1,073 | 97.16 | 97.16 | 02/05/2022 | 10 | 132.87 | 153.05 | 115.19 | 90 |
| 31 | ALIPURDUAR | SM/07138 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 2,682 | 96.46 | 96.46 | 13/05/2022 | 8 | 83.55 | 154.63 | 185.07 | 90 |
| 32 | ALIPURDUAR | SM/07174 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Bakla Piped Water Supply Scheme (Phase-1) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 1,388 | 76.33 | 76.33 | 22/09/2020 | 6 | 86.03 | 108.45 | 126.06 | 90 |
| 33 | ALIPURDUAR | SM/07175 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Birpara (APD) Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 2,686 | 91.69 | 91.69 | 22/09/2020 | 10 | 133.39 | 94.13 | 70.57 | 90 |
| 34 | ALIPURDUAR | SM/07176 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Chotosalkumar Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Falakata Block | 25/09/2020 | 1,621 | 70.54 | 70.54 | 03/09/2020 | 14 | 91.85 | 56.80 | 61.84 | 90 |
| 35 | ALIPURDUAR | SM/07177 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Salsalabari Piped Water Supply Scheme (Phase-1) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 761 | 68.96 | 68.96 | 14/07/2021 | 8 | 53.29 | 132.18 | 248.04 | 95 |
| 36 | ALIPURDUAR | SM/07178 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Munshipara Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,419 | 98.08 | 98.08 | 14/10/2020 | 10 | 132.05 | 138.02 | 104.52 | 95 |
| 37 | ALIPURDUAR | SM/07179 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Munshipara Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,419 | 69.14 | 69.14 | 05/10/2021 | 7 | 64.09 | 42.69 | 66.61 | 95 |
| 38 | ALIPURDUAR | SM/07180 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Totopara Piped Water Supply Scheme | Retrofitting | RWS Madarihat - Birpara Block | 25/09/2020 | 624 | 64.83 | 64.83 | 21/05/2025 | 6 | 32.80 | 17.16 | 52.32 | 42 |
| 39 | ALIPURDUAR | SM/07181 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Kaijali Basty Piped Water Supply Scheme (Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 571 | 89.66 | 89.66 | 13/05/2022 | 6 | 112.91 | 91.47 | 81.01 | 90 |
| 40 | ALIPURDUAR | SM/07182 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Loknathpur and Amp Adj. Mouza Piped Water Supply Scheme (Phase-1) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 870 | 98.81 | 98.81 | 14/10/2020 | 5 | 52.70 | 160.38 | 304.33 | 90 |
| 41 | ALIPURDUAR | SM/07183 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Loknathpur and Amp Adj. Mouza Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 870 | 56.02 | 56.02 | 16/09/2020 | 3 | 46.92 | 53.47 | 113.96 | 90 |
| 42 | ALIPURDUAR | SM/07184 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jashodanga Piped Water Supply Scheme | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 901 | 82.41 | 82.41 | 16/10/2020 | 6 | 129.82 | 107.49 | 82.8 | 95 |
| 43 | ALIPURDUAR | SM/07185 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-1,Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,623 | 82.87 | 82.87 | 13/09/2021 | 10 | 96.58 | 146.19 | 151.37 | 95 |
| 44 | ALIPURDUAR | SM/07186 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Radharani T.G Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Kalchini Block | 25/09/2020 | 345 | 99.29 | 99.29 | 03/09/2020 | 14 | 114.78 | 81.62 | 71.11 | 95 |
| 45 | ALIPURDUAR | SM/07187 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Banchukamari Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 828 | 73.94 | 73.94 | 22/09/2020 | 9 | 78.74 | 137.85 | 175.07 | 72 |
| 46 | ALIPURDUAR | SM/07188 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Banchukamari Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 828 | 73.94 | 73.94 | 10/12/2021 | 4 | 50.08 | 54.01 | 107.85 | 78 |
| 47 | ALIPURDUAR | SM/07189 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Tapshikhata Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 895 | 97.67 | 97.67 | 03/09/2021 | 11 | 80.56 | 154.45 | 191.72 | 81 |
| 48 | ALIPURDUAR | SM/07190 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paitkapara T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,026 | 83.82 | 83.82 | 03/09/2020 | 8 | 86.50 | 135.42 | 156.55 | 95 |
| 49 | ALIPURDUAR | SM/07191 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dhaolajhora T.G Piped Water Supply Scheme | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 788 | 62.80 | 62.80 | 13/05/2022 | 3 | 54.13 | 63.81 | 117.88 | 80 |
| 50 | ALIPURDUAR | SM/07192 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Madhu T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,000 | 83.76 | 83.76 | 20/08/2020 | 7 | 93.96 | 167.52 | 178.29 | 100 |
| 51 | ALIPURDUAR | SM/07193 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jayanti Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 608 | 60.86 | 60.86 | 22/09/2020 | 6 | 41.40 | 71.17 | 171.91 | 95 |
| 52 | ALIPURDUAR | SM/07194 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dima T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,298 | 98.15 | 98.15 | 22/09/2020 | 7 | 68.98 | 192.92 | 279.68 | 100 |
| 53 | ALIPURDUAR | SM/07195 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jayanti T.G Piped Water Supply Scheme | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,222 | 98.84 | 98.84 | 01/10/2020 | 4 | 83.27 | 155.05 | 186.2 | 90 |
| 54 | ALIPURDUAR | SM/07196 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Rahimabad T.G Piped Water Supply Scheme | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 803 | 67.24 | 67.24 | 15/07/2021 | 4 | 41.82 | 100.83 | 241.1 | 90 |
| 55 | ALIPURDUAR | SM/07197 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Gargenda T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,121 | 84.07 | 84.07 | 16/09/2020 | 8 | 82.14 | 74.98 | 91.28 | 80 |
| 56 | ALIPURDUAR | SM/07198 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Mujnai T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 882 | 69.04 | 69.04 | 03/09/2021 | 8 | 54.27 | 70.69 | 130.26 | 90 |
| 57 | ALIPURDUAR | SM/07199 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Makrapara T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 688 | 61.63 | 61.63 | 03/09/2020 | 8 | 65.27 | 60.56 | 92.78 | 90 |
| 58 | ALIPURDUAR | SM/08080 | FHTC under Jaldhara/Jal Sapna including retrofitting of existing distribution system under the command area of Jaigaon & Falakata water supply scheme. | Retrofitting | RWS Kalchini Block | 04/12/2020 | 29,206 | 1,224.31 | 1,224.31 | 17/06/2021 | 74 | 1,376.58 | 1,160.54 | 84.31 | 86 |
| 59 | ALIPURDUAR | SM/08580 | Supply of potable drinking water to Mujnai Tea Garden in relation with Chaa Sundari Project. | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/01/2021 | 882 | 295.97 | 295.97 | 02/12/2024 | 12 | 199.67 | 210.11 | 105.23 | 90 |
| 60 | ALIPURDUAR | SM/08880 | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of UTTAR MADARIHAT Water Supply Scheme | Retrofitting | Alipurduar Sub Division | 19/08/2021 | 2,328 | 140.24 | 140.24 | 27/09/2021 | 9 | 195.48 | 140.24 | 71.74 | 90 |
| 61 | ALIPURDUAR | SM/08881 | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of UTTAR SISHUBARI Water Supply Scheme | Retrofitting | Birpara Sub Division | 19/08/2021 | 874 | 184.32 | 184.32 | 03/09/2021 | 7 | 200.37 | 131.69 | 65.72 | 90 |
| 62 | ALIPURDUAR | SM/08882 | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of CHANDIRJHAR Water Supply Scheme | Retrofitting | Alipurduar Sub Division | 19/08/2021 | 1,096 | 129.45 | 129.45 | 05/10/2021 | 7 | 148.65 | 128.72 | 86.59 | 90 |
| 63 | ALIPURDUAR | SM/08883 | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of SALKUMARHAT Water Supply Scheme | Retrofitting | Birpara Sub Division | 19/08/2021 | 1,393 | 87.85 | 87.85 | 03/09/2020 | 7 | 122.50 | 82.80 | 67.59 | 90 |
| 64 | ALIPURDUAR | SM/08884 | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of HASIMARA Water Supply Scheme | Retrofitting | RWS Kalchini Block | 19/08/2021 | 2,599 | 398.83 | 398.83 | 01/04/2022 | 17 | 455.04 | 387.18 | 85.09 | 81 |
| 65 | ALIPURDUAR | SM/09883 | AUGMENTATION OF BHOLARDABRI PIPE WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 6,045 | 451.23 | 451.23 | 14/11/2024 | 29 | 389.19 | 303.10 | 77.88 | 78 |
| 66 | ALIPURDUAR | SM/09884 | AUGMENTATION OF PUTIMARI PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 2,333 | 484.93 | 484.93 | 29/02/2024 | 24 | 510.31 | 463.25 | 90.78 | 85 |
| 67 | ALIPURDUAR | SM/09885 | AUGMENTATION OF BHUTNIRGHAT PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 22/11/2021 | 3,226 | 449.91 | 449.91 | 02/05/2022 | 19 | 475.74 | 443.61 | 93.25 | 90 |
| 68 | ALIPURDUAR | SM/09886 | REJUVENATION OF MADHYA PAROKATA PIPED WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 2,202 | 257.81 | 257.81 | 11/01/2022 | 8 | 334.80 | 244.39 | 73 | 95 |
| 69 | ALIPURDUAR | SM/09887 | REJUVENATION OF HASIMARA WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 22/11/2021 | 0 | 92.50 | 92.50 | 01/04/2022 | 20 | 120.16 | 52.60 | 43.77 | 98 |
| 70 | ALIPURDUAR | SM/09888 | REJUVINATION OF 'DHAOLAJHORA .T.G WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 43.87 | 43.87 | 13/05/2022 | 4 | 29.09 | 29.08 | 99.97 | 95 |
| 71 | ALIPURDUAR | SM/09890 | REJUVENATION OF 'BAKLA WATER SUPPLY SCHEME' | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 0 | 45.21 | 45.21 | 11/01/2022 | 3 | 31.19 | 20.92 | 67.07 | 98 |
| 72 | ALIPURDUAR | SM/09891 | REJUVENATION OF 'BANCHUKAMARI WATER SUPPLY SCHEME' | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 47.49 | 47.49 | 11/01/2022 | 5 | 56.50 | 21.62 | 38.27 | 82 |
| 73 | ALIPURDUAR | SM/09892 | REJUVINATION OF 'CHANDIRJHAR WATER SUPPLY SCHEME' | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 0 | 47.49 | 47.49 | 05/10/2021 | 9 | 54.25 | 32.83 | 60.52 | 98 |
| 74 | ALIPURDUAR | SM/09893 | REJUVENATION OF 'PURBA CHEPANI WATER SUPPLY SCHEME' | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 0 | 45.22 | 45.22 | 10/08/2022 | 4 | 34.22 | 30.26 | 88.43 | 90 |
| 75 | ALIPURDUAR | SM/09894 | REJUVENATION OF MUNSHIPARA WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 44.01 | 44.01 | 14/01/2022 | 5 | 37.81 | 27.25 | 72.07 | 85 |
| 76 | ALIPURDUAR | SM/09895 | Rejuvenation of Makrapara TG WSS. | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.22 | 45.22 | 31/01/2022 | 6 | 71.74 | 42.81 | 59.67 | 90 |
| 77 | ALIPURDUAR | SM/09896 | REJUVENATION OF DHUMCHIPARA. T.G. WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.23 | 45.23 | 26/06/2025 | 8 | 32.62 | 29.82 | 91.42 | 93 |
| 78 | ALIPURDUAR | SM/09897 | REJUVENATION OF BIRPARA(APD) WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.48 | 45.48 | 03/09/2021 | 6 | 38.90 | 37.82 | 97.22 | 98 |
| 79 | ALIPURDUAR | SM/09898 | REJUVENATION OF JAYANTI WATER SUPPLY SCHEME' | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 608 | 47.48 | 47.48 | 13/09/2021 | 12 | 43.36 | 38.71 | 89.28 | 95 |
| 80 | ALIPURDUAR | SM/09899 | REJUVINATION OF 'JASHODANGA WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 1, Northern Mechanical Division-II,PHE Dte. | 22/11/2021 | 0 | 45.28 | 45.28 | 31/01/2022 | 6 | 42.51 | 34.57 | 81.32 | 97 |
| 81 | ALIPURDUAR | SM/09900 | REJUVENATION OF 'PASCHIM KHAIRBARI WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.23 | 45.23 | 20/05/2022 | 1 | 2.87 | 2.87 | 100 | 50 |
| 82 | ALIPURDUAR | SM/09901 | REJUVENATION OF HANTUPARA TG WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 44.25 | 44.25 | 18/02/2022 | 6 | 42.11 | 31.47 | 74.73 | 90 |
| 83 | ALIPURDUAR | SM/09902 | REJUVINATION OF ' UTTAR MADARIHAT WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 47.49 | 47.49 | 19/05/2023 | 5 | 55.37 | 37.43 | 67.6 | 86 |
| 84 | ALIPURDUAR | SM/09903 | REJUVENATION OF 'CHOTO SALKUMAR WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 22/11/2021 | 0 | 45.22 | 45.22 | 05/10/2021 | 9 | 39.47 | 29.71 | 75.27 | 93 |
| 85 | ALIPURDUAR | SM/09904 | Rejuvenation Of Dima T.G. W.S.S | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 44.51 | 44.51 | 03/09/2020 | 7 | 33.44 | 13.51 | 40.4 | 70 |
| 86 | ALIPURDUAR | SM/09905 | REJUVENATION OF 'LOKNATHPUR WATER SUPPLY SCHEME' | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 0 | 45.51 | 45.51 | 13/12/2021 | 9 | 38.86 | 11.00 | 28.31 | 97 |
| 87 | ALIPURDUAR | SM/09906 | Rejuvenation of Gargenda Tea Garden Water Supply Scheme | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.22 | 45.22 | 23/02/2023 | 2 | 14.94 | 14.94 | 100 | 94 |
| 88 | ALIPURDUAR | SM/09907 | REJUVENATION OF SALSALABARI WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 0 | 44.74 | 44.74 | 16/03/2023 | 3 | 38.67 | 2.39 | 6.18 | 98 |
| 89 | ALIPURDUAR | SM/09908 | REJUVENATION OF 'TAPSHIKHATA WATER SUPPLY SCHEME' | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 46.31 | 46.31 | 11/01/2022 | 5 | 42.28 | 32.42 | 76.68 | 85 |
| 90 | ALIPURDUAR | SM/09909 | REJUVENATION OF MADHU TG WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.46 | 45.46 | 27/12/2021 | 6 | 46.31 | 35.45 | 76.55 | 72 |
| 91 | ALIPURDUAR | SM/09910 | REJUVENATION OF PAITKAPARA WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 47.45 | 47.45 | 01/04/2022 | 5 | 28.76 | 23.06 | 80.18 | 95 |
| 92 | ALIPURDUAR | SM/10038 | Dheklapara Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project. | New | Birpara Sub Division | 10/02/2021 | 567 | 247.03 | 247.03 | 02/12/2024 | 4 | 191.47 | 75.89 | 39.64 | 90 |
| 93 | ALIPURDUAR | SM/10039 | Torsha Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project. | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 10/02/2021 | 1,348 | 284.23 | 284.23 | 12/12/2022 | 10 | 308.42 | 266.23 | 86.32 | 90 |
| 94 | ALIPURDUAR | SM/10054 | Supply of Potable Drinking Water to Lankapara Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project. | New | Birpara Sub Division | 08/01/2021 | 2,682 | 332.16 | 332.16 | 12/08/2024 | 11 | 299.47 | 148.86 | 49.71 | 75 |
| 95 | ALIPURDUAR | SM/10154 | AUGMENTATION OF NARATHALI PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 3,764 | 632.84 | 632.84 | 30/03/2024 | 23 | 659.42 | 578.97 | 87.8 | 90 |
| 96 | ALIPURDUAR | SM/10155 | REJUVENATION OF TATPARA PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,040 | 140.66 | 140.66 | 08/06/2022 | 7 | 229.60 | 136.56 | 59.48 | 90 |
| 97 | ALIPURDUAR | SM/10156 | AUGMENTATION OF JATESWAR PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/12/2021 | 1,020 | 706.17 | 706.17 | 21/01/2023 | 24 | 728.68 | 504.48 | 69.23 | 68 |
| 98 | ALIPURDUAR | SM/10169 | AUGMENTATION OF JAGIJHORA BARABAK PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/12/2021 | 1,527 | 378.84 | 378.84 | 04/08/2025 | 17 | 260.61 | 149.63 | 57.42 | 90 |
| 99 | ALIPURDUAR | SM/10170 | REJUVENATION OF UTTAR KAMAKHYAGURI PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 2,836 | 509.72 | 509.72 | 20/06/2022 | 20 | 496.39 | 312.74 | 63 | 92 |
| 100 | ALIPURDUAR | SM/10171 | AUGMENTATION OF UTTAR MAJHER DABRI PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 3,164 | 750.42 | 750.42 | 08/06/2022 | 21 | 738.30 | 618.84 | 83.82 | 92 |
| 101 | ALIPURDUAR | SM/10172 | MATHURA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 2,579 | 810.28 | 810.28 | 14/11/2024 | 14 | 733.75 | 603.98 | 82.31 | 90 |
| 102 | ALIPURDUAR | SM/10173 | MADARIHAT TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 2,277 | 886.25 | 886.25 | 01/04/2022 | 22 | 1,213.86 | 844.20 | 69.55 | 88 |
| 103 | ALIPURDUAR | SM/10174 | DAKSHIN PAITKAPARA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,867 | 732.56 | 732.56 | 01/04/2022 | 15 | 773.76 | 650.15 | 84.02 | 90 |
| 104 | ALIPURDUAR | SM/10175 | SIDHABARI PIED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,605 | 360.32 | 360.32 | 01/04/2022 | 13 | 434.12 | 311.00 | 71.64 | 65 |
| 105 | ALIPURDUAR | SM/10176 | MECHPARA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,425 | 426.36 | 426.36 | 01/04/2022 | 13 | 458.37 | 312.49 | 68.17 | 75 |
| 106 | ALIPURDUAR | SM/10177 | JAYBIRPARA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,248 | 338.59 | 338.59 | 13/05/2022 | 9 | 366.73 | 240.46 | 65.57 | 70 |
| 107 | ALIPURDUAR | SM/10178 | GOPALPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,487 | 577.33 | 577.33 | 01/04/2022 | 19 | 764.05 | 533.58 | 69.84 | 85 |
| 108 | ALIPURDUAR | SM/10179 | CHUNIA JHORA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 647 | 364.15 | 364.15 | 01/04/2022 | 10 | 513.34 | 342.98 | 66.81 | 90 |
| 109 | ALIPURDUAR | SM/10180 | GANGUTIA TEA GARDEN AREA PIPED WATER SUPPLY SHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,250 | 376.91 | 376.91 | 01/04/2022 | 9 | 449.06 | 354.16 | 78.87 | 86 |
| 110 | ALIPURDUAR | SM/10316 | AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 27/01/2022 | 2,393 | 281.05 | 281.05 | 02/05/2022 | 18 | 206.91 | 73.92 | 35.73 | 85 |
| 111 | ALIPURDUAR | SM/10637 | Providing FHTC of existing LDS under command area UTTARLATABARI WSS at Kalchini Block. | Augmentation | Birpara Sub Division | 16/03/2022 | 3,877 | 252.10 | 252.10 | 11/05/2022 | 14 | 236.44 | 124.40 | 52.61 | 85 |
| 112 | ALIPURDUAR | SM/10667 | AUGMENTATION OF BAKLA WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 16/03/2022 | 40 | 186.88 | 186.88 | 21/05/2025 | 8 | 96.99 | 58.88 | 60.71 | 61 |
| 113 | ALIPURDUAR | SM/10668 | AUGMENTATION OF JASHODANGA WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 16/03/2022 | 20 | 69.44 | 69.44 | 06/04/2023 | 4 | 47.97 | 24.09 | 50.22 | 90 |
| 114 | ALIPURDUAR | SM/10669 | AUGMENTATION OF PURBA CHEPANI WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 50 | 161.24 | 161.24 | 14/11/2024 | 10 | 100.41 | 23.55 | 23.45 | 30 |
| 115 | ALIPURDUAR | SM/10670 | AUGMENTATION OF SALSALABARI WATER SUPPLY SCHEME. | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 16/03/2022 | 45 | 108.13 | 108.13 | 30/04/2025 | 7 | 78.22 | 34.26 | 43.8 | 60 |
| 116 | ALIPURDUAR | SM/10671 | AUGMENTATION OF BIRPARA (APD) WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 38 | 152.39 | 152.39 | 13/05/2022 | 7 | 88.52 | 22.83 | 25.79 | 88 |
| 117 | ALIPURDUAR | SM/10672 | AUGMENTATION OF PASCHIM KHAIRBARI WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 30 | 162.74 | 162.74 | 30/12/2024 | 6 | 45.51 | 1.19 | 2.61 | 75 |
| 118 | ALIPURDUAR | SM/10673 | AUGMENTATION OF LOKNATHPUR WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 16/03/2022 | 50 | 252.98 | 252.98 | 13/05/2022 | 8 | 137.93 | 28.92 | 20.97 | 85 |
| 119 | ALIPURDUAR | SM/10674 | AUGMENTATION OF BANCHUKAMARI WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 60 | 236.97 | 236.97 | 14/11/2024 | 6 | 205.24 | 45.27 | 22.06 | 70 |
| 120 | ALIPURDUAR | SM/10675 | AUGMENTATION OF MUNSHIPARA WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 50 | 178.64 | 178.64 | 16/03/2023 | 3 | 92.35 | 51.29 | 55.54 | 85 |
| 121 | ALIPURDUAR | SM/10676 | AUGMENTATION OF TAPASHIKHATA PIPED WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 40 | 252.39 | 252.39 | 14/11/2024 | 8 | 66.01 | 39.20 | 59.38 | 85 |
| 122 | ALIPURDUAR | SM/10677 | AUGMENTATION OF CHANDIRJHAR WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 2,678 | 192.09 | 192.09 | 13/05/2022 | 7 | 30.55 | 15.52 | 50.8 | 85 |
| 123 | ALIPURDUAR | SM/10678 | AUGMENTATION OF JOGENDRAPUR WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/03/2022 | 2,100 | 274.45 | 274.45 | 04/08/2025 | 6 | 194.88 | 73.02 | 37.47 | 90 |
| 124 | ALIPURDUAR | SM/10776 | IMPLEMENTATION OF STANDALONE WATER SUPPLY SYSTEM IN THE VILLAGES HAVING LESS THAN 100 HOUSEHOLD UNDER ALIPURDUAR DISTRICT PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division | 17/02/2022 | 0 | 167.97 | 167.97 | 31/05/2022 | 2 | 145.62 | 97.37 | 66.87 | 91 |
| 125 | ALIPURDUAR | SM/11401 | AUGMENTATION OF PATLAKHAWA WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 2,981 | 140.89 | 140.89 | 03/09/2021 | 10 | 160.88 | 133.68 | 83.09 | 75 |
| 126 | ALIPURDUAR | SM/11402 | AUGMENTATION OF JAYANTI PIPED WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 608 | 86.31 | 86.31 | 17/08/2022 | 10 | 96.31 | 66.62 | 69.17 | 90 |
| 127 | ALIPURDUAR | SM/11459 | AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 27/01/2022 | 7,440 | 1,873.61 | 1,873.61 | 14/11/2024 | 46 | 1,746.11 | 1,127.98 | 64.6 | 72 |
| 128 | ALIPURDUAR | SM/11482 | KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 1,493 | 395.23 | 395.23 | 15/07/2022 | 18 | 376.77 | 221.80 | 58.87 | 90 |
| 129 | ALIPURDUAR | SM/11483 | Bandpani Tea Garden Areas Piped Water Supply Scheme. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 1,272 | 528.37 | 528.37 | 21/01/2023 | 18 | 398.41 | 299.93 | 75.28 | 80 |
| 130 | ALIPURDUAR | SM/11484 | NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 1,520 | 455.23 | 455.23 | 14/11/2024 | 15 | 378.67 | 284.48 | 75.13 | 90 |
| 131 | ALIPURDUAR | SM/11485 | SANKOSH TG AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 1,567 | 389.92 | 389.92 | 15/07/2022 | 12 | 364.90 | 260.28 | 71.33 | 90 |
| 132 | ALIPURDUAR | SM/11696 | HOASINBAD TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 25/04/2022 | 990 | 411.35 | 411.35 | 12/06/2025 | 9 | 336.01 | 250.78 | 74.63 | 85 |
| 133 | ALIPURDUAR | SM/11709 | SHRINATHPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 25/04/2022 | 1,702 | 817.44 | 817.44 | 14/11/2024 | 26 | 749.60 | 676.53 | 90.25 | 95 |
| 134 | ALIPURDUAR | SM/11765 | AUGMENTATION OF TOTOPARA AREA PIPED WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block | 25/04/2022 | 110 | 154.07 | 154.07 | 04/04/2023 | 5 | 114.80 | 63.97 | 55.72 | 60 |
| 135 | ALIPURDUAR | SM/11766 | AUGMENTATION OF NEPANIA PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 25/04/2022 | 400 | 88.14 | 88.14 | 09/11/2023 | 4 | 105.05 | 47.46 | 45.18 | 75 |
| 136 | ALIPURDUAR | SM/11767 | AUGMENTATION OF LANKAPARA TG FOR LONKAPARA HAT AREA PIPED WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, PHE(Md. Mahfuz) Dte. | 25/04/2022 | 250 | 204.15 | 204.15 | 26/06/2025 | 14 | 136.76 | 88.32 | 64.58 | 80 |
| 137 | ALIPURDUAR | SM/11958 | AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 16/03/2022 | 493 | 562.16 | 562.16 | 04/04/2023 | 17 | 289.11 | 224.20 | 77.55 | 85 |
| 138 | ALIPURDUAR | SM/11959 | AUGMENTATION OF UTTAR SISUBARI WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 807 | 648.63 | 648.63 | 19/05/2023 | 10 | 384.18 | 71.05 | 18.49 | 65 |
| 139 | ALIPURDUAR | SM/11960 | AUGMENTATION OF DALMORE & RAMJHORA TEA GARDEN PIPED WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 1,031 | 512.91 | 512.91 | 29/07/2025 | 10 | 342.06 | 142.58 | 41.68 | 72 |
| 140 | ALIPURDUAR | SM/11970 | AUGMENTATION OF DAKSHIN SONAPUR WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 16/03/2022 | 7,780 | 1,275.43 | 1,275.43 | 21/06/2024 | 31 | 1,117.17 | 476.79 | 42.68 | 70 |
| 141 | ALIPURDUAR | SM/11985 | AUGMENTATION OF KUMARGRAM PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 7,273 | 2,156.38 | 2,156.38 | 21/12/2022 | 31 | 1,863.64 | 1,186.57 | 63.67 | 75 |
| 142 | ALIPURDUAR | SM/11991 | KARTIKA TEA GARDEN AREA PIPED WAATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 15/07/2022 | 1,128 | 432.05 | 432.05 | 18/08/2025 | 12 | 397.57 | 334.17 | 84.05 | 90 |
| 143 | ALIPURDUAR | SM/11992 | PHASKHAWA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division | 15/07/2022 | 705 | 269.79 | 269.79 | 21/11/2022 | 10 | 224.11 | 171.43 | 76.49 | 85 |
| 144 | ALIPURDUAR | SM/12113 | KOHINUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 15/07/2022 | 2,542 | 821.35 | 821.35 | 18/05/2023 | 18 | 633.42 | 386.88 | 61.08 | 81 |
| 145 | ALIPURDUAR | SM/12114 | RAYDAK TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 15/07/2022 | 1,999 | 588.27 | 588.27 | 18/04/2023 | 21 | 549.34 | 359.19 | 65.39 | 90 |
| 146 | ALIPURDUAR | SM/12361 | AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 16/03/2022 | 1,277 | 1,269.79 | 1,269.79 | 21/09/2023 | 27 | 359.35 | 197.05 | 54.84 | 35 |
| 147 | ALIPURDUAR | SM/12561 | AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 27/01/2022 | 7,617 | 1,852.66 | 1,852.66 | 14/11/2024 | 47 | 1,533.97 | 1,173.00 | 76.47 | 85 |
| 148 | ALIPURDUAR | SM/12753 | SISHA JUMRHA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/08/2022 | 2,683 | 797.79 | 797.79 | 17/06/2025 | 11 | 688.74 | 489.59 | 71.08 | 88 |
| 149 | ALIPURDUAR | SM/12754 | NAOTHOARTARI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 22/08/2022 | 694 | 415.72 | 415.72 | 12/06/2025 | 9 | 373.92 | 198.86 | 53.18 | 68 |
| 150 | ALIPURDUAR | SM/13239 | KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick),RWS Falakata Block | 09/09/2022 | 4,031 | 716.98 | 716.98 | 26/06/2024 | 15 | 640.05 | 556.42 | 86.93 | 88 |
| 151 | ALIPURDUAR | SM/13240 | PASCHIM CHENGMARI PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 929 | 741.26 | 741.26 | 25/08/2023 | 9 | 422.73 | 282.19 | 66.75 | 88 |
| 152 | ALIPURDUAR | SM/13241 | BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,437 | 780.16 | 780.16 | 19/05/2023 | 15 | 564.06 | 268.75 | 47.65 | 50 |
| 153 | ALIPURDUAR | SM/13242 | CHUOTA DALDALI PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,001 | 615.61 | 615.61 | 23/08/2023 | 15 | 448.91 | 162.47 | 36.19 | 55 |
| 154 | ALIPURDUAR | SM/13243 | PURBA KHALISHAMARI PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,919 | 963.61 | 963.61 | 14/11/2024 | 15 | 633.76 | 446.81 | 70.5 | 89 |
| 155 | ALIPURDUAR | SM/13244 | NIMTI DOMOHANI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 09/09/2022 | 1,482 | 710.27 | 710.27 | 30/05/2025 | 15 | 658.00 | 425.50 | 64.67 | 88 |
| 156 | ALIPURDUAR | SM/13245 | PASCHIM SATALI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 09/09/2022 | 2,797 | 969.65 | 969.65 | 07/09/2023 | 12 | 905.65 | 637.24 | 70.36 | 85 |
| 157 | ALIPURDUAR | SM/13246 | BARIGURI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 09/09/2022 | 7,373 | 895.77 | 895.77 | 16/05/2023 | 13 | 715.39 | 299.76 | 41.9 | 70 |
| 158 | ALIPURDUAR | SM/13247 | PRODHANPARA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 09/09/2022 | 1,353 | 638.14 | 638.14 | 17/06/2025 | 10 | 495.65 | 219.96 | 44.38 | 85 |
| 159 | ALIPURDUAR | SM/13248 | MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block | 09/09/2022 | 2,462 | 877.17 | 877.17 | 14/11/2024 | 15 | 758.43 | 532.96 | 70.27 | 82 |
| 160 | ALIPURDUAR | SM/13249 | BUXA FOREST (RAJA BHATKHAWA) PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 2,652 | 860.22 | 860.22 | 08/08/2024 | 21 | 761.94 | 281.77 | 36.98 | 20 |
| 161 | ALIPURDUAR | SM/13299 | KAYAKHATA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 09/09/2022 | 1,585 | 682.41 | 682.41 | 12/06/2025 | 15 | 484.71 | 331.03 | 68.29 | 75 |
| 162 | ALIPURDUAR | SM/13300 | BRAJERKUTHI PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,847 | 944.20 | 944.20 | 10/09/2024 | 19 | 714.99 | 572.37 | 80.05 | 90 |
| 163 | ALIPURDUAR | SM/13301 | PURBA CHIKLIGURI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 09/09/2022 | 1,869 | 875.66 | 875.66 | 10/09/2024 | 11 | 687.31 | 464.09 | 67.52 | 70 |
| 164 | ALIPURDUAR | SM/13302 | DAKSHIN BARAJHAR FOREST PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 09/09/2022 | 308 | 171.75 | 171.75 | 10/09/2024 | 7 | 157.18 | 97.16 | 61.81 | 85 |
| 165 | ALIPURDUAR | SM/13303 | TELIPARA PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,029 | 488.14 | 488.14 | 14/11/2024 | 13 | 327.58 | 196.80 | 60.08 | 90 |
| 166 | ALIPURDUAR | SM/13304 | MARAKHATA PIPED WATER SUPPLY SCHEME. | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 3,129 | 839.09 | 839.09 | 23/08/2023 | 15 | 527.34 | 374.45 | 71.01 | 86 |
| 167 | ALIPURDUAR | SM/13305 | DAKSHIN MAJIDKHANA PIPED WATER SUPPLY SCHEME. | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,402 | 760.21 | 760.21 | 17/06/2025 | 14 | 507.89 | 471.75 | 92.88 | 85 |
| 168 | ALIPURDUAR | SM/13306 | KALABERIA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 09/09/2022 | 1,065 | 461.28 | 461.28 | 14/11/2024 | 10 | 416.99 | 223.70 | 53.65 | 75 |
| 169 | ALIPURDUAR | SM/13448 | JAYANTI TEA GARDEN -II AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 563 | 305.16 | 305.16 | 06/06/2023 | 9 | 289.89 | 109.98 | 37.94 | 65 |
| 170 | ALIPURDUAR | SM/13449 | ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 09/09/2022 | 1,856 | 695.45 | 695.45 | 07/09/2023 | 16 | 637.13 | 507.01 | 79.58 | 88 |
| 171 | ALIPURDUAR | SM/14092 | ATIABARI TEA GARDEN PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/09/2022 | 1,884 | 895.42 | 895.42 | 14/11/2024 | 16 | 757.19 | 622.50 | 82.21 | 88 |
| 172 | ALIPURDUAR | SM/14093 | RAJABHAT TEA GARDEN PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/09/2022 | 1,074 | 528.73 | 528.73 | 14/11/2024 | 12 | 285.05 | 229.49 | 80.51 | 90 |
| 173 | ALIPURDUAR | SM/14096 | AUGMENTATION OF BHATIBARI PIPED WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 27/01/2022 | 8,070 | 2,031.40 | 2,031.40 | 14/11/2024 | 57 | 1,747.57 | 1,044.04 | 59.74 | 86 |
| 174 | ALIPURDUAR | SM/14209 | PARARPAR PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 26/09/2022 | 1,187 | 561.82 | 561.82 | 30/04/2025 | 16 | 544.20 | 259.93 | 47.76 | 70 |
| 175 | ALIPURDUAR | SM/14210 | FOSKADANGA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 26/09/2022 | 684 | 510.99 | 510.99 | 30/04/2025 | 10 | 434.79 | 268.41 | 61.73 | 65 |
| 176 | ALIPURDUAR | SM/14211 | BHATKHAWA TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 1,604 | 530.22 | 530.22 | 14/11/2024 | 14 | 465.37 | 186.91 | 40.16 | 78 |
| 177 | ALIPURDUAR | SM/14212 | BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 26/09/2022 | 2,321 | 570.23 | 570.23 | 06/10/2023 | 12 | 522.43 | 395.15 | 75.64 | 90 |
| 178 | ALIPURDUAR | SM/14213 | RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 26/09/2022 | 2,268 | 740.97 | 740.97 | 28/03/2024 | 13 | 562.70 | 164.10 | 29.16 | 50 |
| 179 | ALIPURDUAR | SM/14214 | BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 26/09/2022 | 1,579 | 527.26 | 527.26 | 02/07/2024 | 11 | 648.60 | 442.23 | 68.18 | 90 |
| 180 | ALIPURDUAR | SM/14215 | NIMTIJHORA TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 26/09/2022 | 1,002 | 336.47 | 336.47 | 31/03/2023 | 7 | 213.79 | 214.05 | 100.12 | 90 |
| 181 | ALIPURDUAR | SM/14216 | GAROCHIRA BANDAPANI PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 130 | 129.41 | 129.41 | 19/01/2023 | 6 | 134.64 | 86.64 | 64.35 | 93 |
| 182 | ALIPURDUAR | SM/14217 | DAKSHIN RANGALIBAZNA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 794 | 409.38 | 409.38 | 03/10/2023 | 11 | 395.31 | 192.27 | 48.64 | 60 |
| 183 | ALIPURDUAR | SM/14218 | NURPUR PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 423 | 451.36 | 451.36 | 16/08/2023 | 12 | 323.39 | 208.76 | 64.55 | 93 |
| 184 | ALIPURDUAR | SM/14219 | TURTURI PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 1,003 | 948.08 | 948.08 | 17/06/2025 | 19 | 559.37 | 436.64 | 78.06 | 75 |
| 185 | ALIPURDUAR | SM/14220 | TORSHA FOREST PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 26/09/2022 | 201 | 142.14 | 142.14 | 24/08/2023 | 6 | 121.50 | 95.99 | 79 | 90 |
| 186 | ALIPURDUAR | SM/14221 | BALLALGURI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block | 26/09/2022 | 609 | 413.54 | 413.54 | 07/09/2023 | 9 | 307.45 | 202.01 | 65.7 | 85 |
| 187 | ALIPURDUAR | SM/14222 | UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 729 | 429.71 | 429.71 | 03/10/2023 | 8 | 392.73 | 230.18 | 58.61 | 70 |
| 188 | ALIPURDUAR | SM/14223 | PAKRIGURI PIPED WAYER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 603 | 509.75 | 509.75 | 23/08/2023 | 18 | 313.18 | 165.83 | 52.95 | 55 |
| 189 | ALIPURDUAR | SM/14233 | AUGMENTATION OF BIRPARA WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 18,867 | 2,288.93 | 2,288.93 | 16/04/2025 | 48 | 2,120.28 | 983.90 | 46.4 | 65 |
| 190 | ALIPURDUAR | SM/15206 | MAIRADANGA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/11/2022 | 3,541 | 963.71 | 963.71 | 16/05/2023 | 13 | 865.91 | 472.76 | 54.6 | 70 |
| 191 | ALIPURDUAR | SM/15207 | PASCHIM DEOGAON PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/11/2022 | 2,097 | 802.95 | 802.95 | 20/07/2023 | 13 | 741.62 | 301.89 | 40.71 | 65 |
| 192 | ALIPURDUAR | SM/15208 | DHANIRAMPUR PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/11/2022 | 1,552 | 670.33 | 670.33 | 04/08/2025 | 11 | 617.48 | 509.63 | 82.53 | 78 |
| 193 | ALIPURDUAR | SM/15209 | AUGMENTATION OF HANTUPARA TG PIPED WATER SUPPLY SCHEME. | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/11/2022 | 0 | 112.19 | 112.19 | 26/06/2025 | 5 | 32.45 | 42.47 | 130.88 | 80 |
| 194 | ALIPURDUAR | SM/15210 | AUGMENTATION OF DHUMCHIPARA TG PIPED WATER SUPPLY SCHEME. | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/11/2022 | 0 | 111.32 | 111.32 | 16/01/2024 | 7 | 109.66 | 40.11 | 36.58 | 60 |
| 195 | ALIPURDUAR | SM/15482 | KALCHINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 27/01/2022 | 5,753 | 1,380.67 | 1,380.67 | 14/11/2024 | 23 | 1,194.38 | 432.23 | 36.19 | 50 |
| 196 | ALIPURDUAR | SM/15517 | MADHYA KAMAKHYAGURI PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,645 | 1,067.02 | 1,067.02 | 14/11/2024 | 18 | 752.80 | 601.53 | 79.91 | 83 |
| 197 | ALIPURDUAR | SM/15534 | CHALNIPAK PIPED WATER SUPPLY SCHEME. | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block | 26/09/2022 | 1,648 | 1,024.40 | 1,024.40 | 30/04/2025 | 17 | 667.84 | 470.06 | 70.39 | 80 |
| 198 | ALIPURDUAR | SM/15758 | NARASINGPUR PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/11/2022 | 2,461 | 842.46 | 842.46 | 20/07/2023 | 12 | 804.79 | 685.15 | 85.13 | 70 |
| 199 | ALIPURDUAR | SM/15914 | UTTAR BARAJHAR FOREST PIPE WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 30/09/2022 | 567 | 358.24 | 358.24 | 24/04/2023 | 7 | 247.06 | 45.73 | 18.51 | 6 |
| 200 | ALIPURDUAR | SM/16114 | UMACHARANPUR PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/11/2022 | 3,053 | 950.07 | 950.07 | 19/09/2025 | 13 | 907.02 | 388.99 | 42.89 | 50 |
| 201 | ALIPURDUAR | SM/16115 | REJUVENATION OF SIDHABARI PIPED WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division | 16/11/2022 | 0 | 240.25 | 240.25 | 12/06/2025 | 3 | 92.60 | 61.62 | 66.54 | 50 |
| 202 | ALIPURDUAR | SM/16506 | 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 28/12/2022 | 1,752 | 990.41 | 990.41 | 08/08/2024 | 26 | 454.62 | 185.56 | 40.82 | 3 |
| 203 | ALIPURDUAR | SM/16507 | BUXA PIPE WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 28/12/2022 | 219 | 219.61 | 219.61 | 26/06/2025 | 8 | 104.12 | 16.34 | 15.69 | 2 |
| 204 | ALIPURDUAR | SM/16537 | PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 2,273 | 1,261.38 | 1,261.38 | 14/11/2024 | 20 | 862.72 | 594.95 | 68.96 | 75 |
| 205 | ALIPURDUAR | SM/16538 | UTTAR MAJID KHANA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 09/09/2022 | 1,888 | 1,074.69 | 1,074.69 | 14/11/2024 | 15 | 607.94 | 443.78 | 73 | 70 |
| 206 | ALIPURDUAR | SM/16539 | UTTAR MANDABARI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 09/09/2022 | 2,329 | 1,121.63 | 1,121.63 | 17/06/2025 | 16 | 975.16 | 676.44 | 69.37 | 75 |
| 207 | ALIPURDUAR | SM/16817 | UTTAR DEOGAON PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 1,601 | 808.50 | 808.50 | 20/07/2023 | 13 | 794.24 | 478.67 | 60.27 | 65 |
| 208 | ALIPURDUAR | SM/16818 | MALSAGAON PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 1,481 | 777.46 | 777.46 | 04/08/2025 | 9 | 699.95 | 590.00 | 84.29 | 70 |
| 209 | ALIPURDUAR | SM/16819 | LACHHIMANDABRI PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 1,272 | 658.29 | 658.29 | 03/08/2023 | 11 | 619.34 | 356.45 | 57.55 | 60 |
| 210 | ALIPURDUAR | SM/16820 | BENGKANDI PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 2,074 | 964.09 | 964.09 | 28/07/2023 | 12 | 932.54 | 563.39 | 60.41 | 60 |
| 211 | ALIPURDUAR | SM/16821 | DALMONI TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 442 | 405.28 | 405.28 | 31/03/2023 | 9 | 285.59 | 37.03 | 12.97 | 25 |
| 212 | ALIPURDUAR | SM/16822 | TASTI TEA GARDEN PIPED WATER SUPPLY SCHEME. | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 1,184 | 569.65 | 569.65 | 19/05/2023 | 13 | 424.79 | 158.73 | 37.37 | 60 |
| 213 | ALIPURDUAR | SM/16823 | DALGAON TEA GARDEN PIPED WATER SUPPLY SCHEME. | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 1,298 | 739.67 | 739.67 | 14/11/2024 | 13 | 539.59 | 284.30 | 52.69 | 75 |
| 214 | ALIPURDUAR | SM/16824 | AUGMENTATION OF GARGENDA TG PIPED WATER SUPPLY SCHEME. | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 28/12/2022 | 0 | 273.66 | 273.66 | 26/06/2025 | 13 | 203.57 | 116.15 | 57.06 | 72 |
| 215 | ALIPURDUAR | SM/18150 | Malangi Tea Garden Area Piped Water Supply Scheme | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 10/03/2023 | 2,115 | 561.45 | 561.45 | 04/05/2023 | 12 | 426.93 | 102.53 | 24.02 | 50 |
| 216 | ALIPURDUAR | SM/18151 | Khagenhat Piped Water Supply Scheme | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 10/03/2023 | 2,057 | 822.98 | 822.98 | 14/11/2024 | 13 | 735.75 | 298.23 | 40.53 | 60 |
| 217 | ALIPURDUAR | SM/18152 | Chengmari Piped Water Supply Scheme | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 10/03/2023 | 1,699 | 772.15 | 772.15 | 04/05/2023 | 11 | 615.87 | 414.19 | 67.25 | 65 |
| 218 | ALIPURDUAR | SM/18153 | Dhantali Piped Water Supply Scheme | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 10/03/2023 | 206 | 285.56 | 285.56 | 04/05/2023 | 6 | 248.07 | 147.02 | 59.27 | 70 |
| 219 | ALIPURDUAR | SM/18154 | Uttar Dhalkar Piped Water Supply Scheme | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 10/03/2023 | 594 | 404.14 | 404.14 | 04/05/2023 | 6 | 286.86 | 184.16 | 64.2 | 70 |
| 220 | ALIPURDUAR | SM/18156 | Bhutri Forest Piped Water Supply Scheme | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 10/03/2023 | 48 | 59.54 | 59.54 | 18/04/2023 | 4 | 45.63 | 20.00 | 43.83 | 95 |
| 221 | ALIPURDUAR | SM/18157 | Purbba Majherdabri Tea Garden Area Piped Water Supply Scheme | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 10/03/2023 | 1,538 | 360.16 | 360.16 | 22/05/2023 | 5 | 239.83 | 180.69 | 75.34 | 70 |
| 222 | ALIPURDUAR | SM/18158 | Parpatla Khawa Piped Water Supply Scheme | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 10/03/2023 | 189 | 187.87 | 187.87 | 04/05/2023 | 6 | 179.68 | 90.33 | 50.27 | 68 |
| 223 | ALIPURDUAR | SM/18254 | AUGMENTATION OF DALIMPUR PWSS | Augmentation | 27/01/2022 | 4,067 | 1,020.25 | 1,020.25 | 12/07/2023 | 20 | 976.36 | 557.21 | 57.07 | 70 | |
| Total | 3,63,885 | 89,667.07 | 89,667.07 | # | 2,593 | 76,220.55 | 51,254.23 | # | # | ||||||