Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 393.69 53.88 13.69  
1 ALIPURDUAR Madarihat Northern Mechanical Division II UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14222 New Supply, delivery, installation, commissioning and trial run of electro-mechanical components along with Cu wound line voltage corrector for UTTAR RANGALIBAZNA water supply scheme, TW no I and II under Jal Jeevan Mission under NMD-II, PHE Dte. Alipurduar. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000685/2023-2024 2139/NMD-II 27/07/2023 30 DILIP MAHATO 18.33 0.00 0 0
2 ALIPURDUAR Madarihat Alipurduar Division UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14222 New Providing FHTC from existing distribution system as per specification for Uttar Rangalibazna PWSS under Alipurduar Division, PHE Dte. Birpara A.E Birpara Sub Division ORD/000304/2023-2024 2135/ALD 03/10/2023 30 MANI PRADHAN 1.08 0.00 0 0
3 ALIPURDUAR Madarihat Northern Mechanical Division II UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14222 New NEW CONNECTION SETRVICE FOR UTTAR RANGALIBAZNA PWSS P/H NO I APPLICATION NO 4003065172 BILL/01793/2023-2024 BP-2023-24-362 27/09/2023 WBSEDCL 7.70 0.00 0 0
4 ALIPURDUAR Madarihat Northern Mechanical Division II UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14222 New NEW CONNECTION SERVICE FOR UTTAR RANGALIBAZNA PWSS P/H NO II BILL/01796/2023-2024 BP-2023-24-363 27/09/2023 WBSEDCL 5.74 0.00 0 0
5 ALIPURDUAR Madarihat Alipurduar Division UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14222 New Material Requisition To Resource Division RTOR000055/2023-2024 2701/ALD 12/12/2023 Resource Division 84.45 0.00 0 0
6 ALIPURDUAR Madarihat Alipurduar Division UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14222 New Material Requisition To Resource Division RTOR000090/2023-2024 114/ALD 10/01/2024 Resource Division 4.49 0.00 0 0
7 ALIPURDUAR Madarihat Alipurduar Division UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14222 New Cons. of Rig bored TW(2nos) by ODEX-165 method of drilling at HW and 2nd site, cons of 100 cum OHR at HW including soil testing, cons. of P/H and B/W at HW,2nd site, Laying of rising main, distribution line and providing FHTC as per Departmental Design & drawing , providing FHTC and others allied works for Uttar Rangalibazna PWSS under Birpara Sub-Division, Alipurduar Division, PHE DTE. Birpara A.E Birpara Sub Division ORD/000546/2022-2023 3570/ALD 27/03/2023 180 SAMIRON PODDER 271.90 53.88 19.82 11
Total 393.70 53.88 13.69