Sl No. | District
As per Census (2011)
|
Scheme SM Code | Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Type
Type of Scheme as per PHED-MIS
|
Name of JE entrusted | SLSSC Date
Date of SLSSC in which the Scheme has been Approved
|
FHTC Involved
Approved FHTC Count Modified after the appropriation in YDU considered under the Schemes for which Work Order has been Issued as per PHED-MIS
|
Estimated Cost | AAFS Cost
Approved Implementation as mentioned in AAFS considered under the Schemes for which Work Order has been Issued as per PHED-MIS
|
Date of First Work Order
Total No. of Work Orders Issued under the Scheme as per PHED-MIS
|
No. of Work Orders Issued
Total No. of Work Orders Issued under the Scheme as per PHED-MIS
|
Work Value
Total Cost for all the Issued Work Order under the Scheme as per PHED-MIS
|
Payment
Total Payment made for these Work Orders as per PHED-MIS
|
Payment % | Physical Progress % |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
223 | 3,62,098 | 89,667.02 | 89,667.02 | # | 2,468 | 74,712.81 | 26,930.06 | # | # | ||||||
1 | ALIPURDUAR | SM/07057 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jateswar Water Supply Scheme (Phase-1) | Retrofitting | RWS Falakata Block | 25/09/2020 | 2,066 | 99.09 | 99.09 | 01/04/2022 | 14 | 139.46 | 47.96 | 34.39 | 90 |
2 | ALIPURDUAR | SM/07058 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Bakla Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 1,036 | 82.69 | 82.69 | 31/08/2020 | 6 | 82.04 | 60.39 | 73.61 | 90 |
3 | ALIPURDUAR | SM/07059 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Chotosalkumar Piped Water Supply Scheme (Phase-1) | Retrofitting | RWS Falakata Block | 25/09/2020 | 967 | 97.58 | 97.58 | 03/09/2020 | 11 | 118.74 | 84.64 | 71.28 | 90 |
4 | ALIPURDUAR | SM/07060 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Patlakhawa Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,400 | 86.77 | 86.77 | 03/09/2021 | 9 | 65.01 | 85.11 | 130.92 | 90 |
5 | ALIPURDUAR | SM/07061 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Patlakhawa Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,581 | 93.85 | 93.85 | 03/09/2021 | 7 | 48.48 | 92.42 | 190.64 | 55 |
6 | ALIPURDUAR | SM/07062 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Uttar Kamakshyaguri Piped Water Supply Scheme (Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 2,826 | 87.86 | 87.86 | 06/09/2021 | 10 | 121.02 | 82.08 | 67.82 | 95 |
7 | ALIPURDUAR | SM/07063 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Salsalabari Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 1,709 | 91.90 | 91.90 | 13/09/2021 | 8 | 108.03 | 67.88 | 62.83 | 95 |
8 | ALIPURDUAR | SM/07064 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Hantupara Tea Garden Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,612 | 99.04 | 99.04 | 11/06/2018 | 9 | 80.48 | 72.96 | 90.66 | 90 |
9 | ALIPURDUAR | SM/07065 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Kaijali Basty Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 596 | 73.85 | 73.85 | 13/05/2022 | 7 | 60.19 | 24.29 | 40.36 | 90 |
10 | ALIPURDUAR | SM/07066 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 2,682 | 80.75 | 80.75 | 13/05/2022 | 10 | 116.37 | 73.05 | 62.77 | 90 |
11 | ALIPURDUAR | SM/07067 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Radharani T.G Water Supply Scheme (Phase-1) | Retrofitting | RWS Kalchini Block | 25/09/2020 | 345 | 98.86 | 98.86 | 03/09/2020 | 10 | 143.29 | 88.90 | 62.04 | 95 |
12 | ALIPURDUAR | SM/07068 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dimdima T.G Water Supply Scheme (Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,509 | 85.62 | 85.62 | 21/01/2023 | 8 | 88.75 | 52.04 | 58.64 | 90 |
13 | ALIPURDUAR | SM/07069 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dimdima T.G Water Supply Scheme (Phase-2) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,509 | 61.34 | 61.34 | 03/09/2020 | 5 | 58.30 | 54.89 | 94.15 | 90 |
14 | ALIPURDUAR | SM/07121 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Birpara (APD) Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 2,686 | 82.27 | 82.27 | 13/05/2022 | 7 | 83.23 | 72.24 | 86.8 | 90 |
15 | ALIPURDUAR | SM/07122 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-III, Phase-2) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,623 | 98.68 | 98.68 | 05/10/2021 | 5 | 118.71 | 97.80 | 82.39 | 95 |
16 | ALIPURDUAR | SM/07123 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-III, Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,051 | 98.96 | 98.96 | 13/09/2021 | 10 | 117.77 | 55.91 | 47.47 | 95 |
17 | ALIPURDUAR | SM/07124 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Purba Chenpani Piped Water Supply Scheme (Phase-2) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,477 | 55.28 | 55.28 | 15/12/2020 | 3 | 51.41 | 27.64 | 53.76 | 95 |
18 | ALIPURDUAR | SM/07125 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-II, Phase-2) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,051 | 90.17 | 90.17 | 05/10/2021 | 5 | 102.55 | 39.37 | 38.39 | 95 |
19 | ALIPURDUAR | SM/07126 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-II, Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,051 | 93.00 | 93.00 | 05/10/2021 | 6 | 153.73 | 88.77 | 57.74 | 95 |
20 | ALIPURDUAR | SM/07127 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-I, Phase-2) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,051 | 66.37 | 66.37 | 13/09/2021 | 8 | 95.80 | 8.20 | 8.56 | 95 |
21 | ALIPURDUAR | SM/07128 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Tapshikatha Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 895 | 62.07 | 62.07 | 03/09/2021 | 8 | 71.62 | 43.61 | 60.89 | 61 |
22 | ALIPURDUAR | SM/07129 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jagijhora Barabak Piped Water Supply Scheme | Retrofitting | RWS Falakata Block | 25/09/2020 | 1,328 | 72.16 | 72.16 | 15/12/2020 | 6 | 55.12 | 55.12 | 100 | 90 |
23 | ALIPURDUAR | SM/07130 | FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DHUMCHIPARA T.G. Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,568 | 94.15 | 94.15 | 16/09/2020 | 10 | 120.32 | 65.85 | 54.73 | 60 |
24 | ALIPURDUAR | SM/07131 | FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DHEKLAPARA T.G. Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 567 | 73.16 | 73.16 | 03/09/2020 | 7 | 73.19 | 46.65 | 63.74 | 10 |
25 | ALIPURDUAR | SM/07132 | FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DALMORE RAMJHORA T.G. Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,847 | 88.70 | 88.70 | 03/11/2017 | 8 | 43.19 | 6.16 | 14.26 | 50 |
26 | ALIPURDUAR | SM/07133 | FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DALMORE RAMJHORA T.G. Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,169 | 95.65 | 95.65 | 03/11/2017 | 11 | 82.40 | 86.06 | 104.44 | 88 |
27 | ALIPURDUAR | SM/07134 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Purba Chenpani Piped Water Supply Scheme (Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,477 | 89.44 | 89.44 | 10/08/2022 | 4 | 71.75 | 33.48 | 46.66 | 95 |
28 | ALIPURDUAR | SM/07135 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paschim Khairbari Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 822 | 87.03 | 87.03 | 14/10/2020 | 6 | 116.65 | 70.35 | 60.31 | 95 |
29 | ALIPURDUAR | SM/07136 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paschim Khairbari Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 822 | 80.05 | 80.05 | 15/12/2020 | 5 | 77.51 | 57.13 | 73.71 | 80 |
30 | ALIPURDUAR | SM/07137 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dalimpur Piped Water Supply Scheme (Phase-1) | Retrofitting | RWS Falakata Block | 25/09/2020 | 1,073 | 97.16 | 97.16 | 02/05/2022 | 10 | 132.87 | 83.16 | 62.59 | 90 |
31 | ALIPURDUAR | SM/07138 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 2,682 | 96.46 | 96.46 | 13/05/2022 | 8 | 83.55 | 72.58 | 86.87 | 90 |
32 | ALIPURDUAR | SM/07174 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Bakla Piped Water Supply Scheme (Phase-1) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 1,388 | 76.33 | 76.33 | 22/09/2020 | 6 | 86.03 | 51.46 | 59.82 | 90 |
33 | ALIPURDUAR | SM/07175 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Birpara (APD) Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 2,686 | 91.69 | 91.69 | 22/09/2020 | 10 | 133.39 | 69.21 | 51.89 | 90 |
34 | ALIPURDUAR | SM/07176 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Chotosalkumar Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Falakata Block | 25/09/2020 | 1,621 | 70.54 | 70.54 | 03/09/2020 | 14 | 91.85 | 25.63 | 27.9 | 90 |
35 | ALIPURDUAR | SM/07177 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Salsalabari Piped Water Supply Scheme (Phase-1) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 761 | 68.96 | 68.96 | 14/07/2021 | 8 | 53.29 | 66.65 | 125.07 | 95 |
36 | ALIPURDUAR | SM/07178 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Munshipara Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,419 | 98.08 | 98.08 | 14/10/2020 | 10 | 132.05 | 86.20 | 65.28 | 95 |
37 | ALIPURDUAR | SM/07179 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Munshipara Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,419 | 69.14 | 69.14 | 05/10/2021 | 7 | 64.09 | 40.46 | 63.13 | 95 |
38 | ALIPURDUAR | SM/07180 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Totopara Piped Water Supply Scheme | Retrofitting | RWS Madarihat - Birpara Block | 25/09/2020 | 624 | 64.83 | 64.83 | 29/12/2021 | 5 | 9.52 | 11.34 | 119.12 | 42 |
39 | ALIPURDUAR | SM/07181 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Kaijali Basty Piped Water Supply Scheme (Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 571 | 89.66 | 89.66 | 13/05/2022 | 6 | 112.91 | 66.50 | 58.9 | 90 |
40 | ALIPURDUAR | SM/07182 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Loknathpur and Amp Adj. Mouza Piped Water Supply Scheme (Phase-1) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 870 | 98.81 | 98.81 | 14/10/2020 | 5 | 52.70 | 95.63 | 181.46 | 90 |
41 | ALIPURDUAR | SM/07183 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Loknathpur and Amp Adj. Mouza Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 870 | 56.02 | 56.02 | 16/09/2020 | 3 | 46.92 | 23.12 | 49.28 | 90 |
42 | ALIPURDUAR | SM/07184 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jashodanga Piped Water Supply Scheme | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 901 | 82.41 | 82.41 | 26/02/2019 | 8 | 134.82 | 64.27 | 47.67 | 95 |
43 | ALIPURDUAR | SM/07185 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-1,Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,623 | 82.87 | 82.87 | 13/09/2021 | 11 | 102.17 | 81.60 | 79.87 | 95 |
44 | ALIPURDUAR | SM/07186 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Radharani T.G Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Kalchini Block | 25/09/2020 | 345 | 99.29 | 99.29 | 03/09/2020 | 14 | 114.78 | 79.17 | 68.98 | 95 |
45 | ALIPURDUAR | SM/07187 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Banchukamari Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 828 | 73.94 | 73.94 | 22/09/2020 | 9 | 78.74 | 56.02 | 71.15 | 72 |
46 | ALIPURDUAR | SM/07188 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Banchukamari Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 828 | 73.94 | 73.94 | 10/12/2021 | 4 | 50.08 | 51.99 | 103.81 | 78 |
47 | ALIPURDUAR | SM/07189 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Tapshikhata Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 895 | 97.67 | 97.67 | 03/09/2021 | 11 | 80.56 | 91.00 | 112.96 | 81 |
48 | ALIPURDUAR | SM/07190 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paitkapara T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,026 | 83.82 | 83.82 | 03/09/2020 | 8 | 86.50 | 55.17 | 63.78 | 95 |
49 | ALIPURDUAR | SM/07191 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dhaolajhora T.G Piped Water Supply Scheme | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 788 | 62.80 | 62.80 | 13/05/2022 | 3 | 54.13 | 30.70 | 56.72 | 80 |
50 | ALIPURDUAR | SM/07192 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Madhu T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,000 | 83.76 | 83.76 | 20/08/2020 | 8 | 95.75 | 80.74 | 84.32 | 100 |
51 | ALIPURDUAR | SM/07193 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jayanti Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 608 | 60.86 | 60.86 | 22/09/2020 | 6 | 41.40 | 11.21 | 27.08 | 95 |
52 | ALIPURDUAR | SM/07194 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dima T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,298 | 98.15 | 98.15 | 22/09/2020 | 7 | 68.98 | 90.29 | 130.89 | 100 |
53 | ALIPURDUAR | SM/07195 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jayanti T.G Piped Water Supply Scheme | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,222 | 98.84 | 98.84 | 01/10/2020 | 4 | 83.27 | 92.99 | 111.67 | 90 |
54 | ALIPURDUAR | SM/07196 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Rahimabad T.G Piped Water Supply Scheme | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 803 | 67.24 | 67.24 | 15/07/2021 | 4 | 41.82 | 44.74 | 106.98 | 90 |
55 | ALIPURDUAR | SM/07197 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Gargenda T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,121 | 84.07 | 84.07 | 16/09/2020 | 7 | 74.85 | 49.59 | 66.25 | 80 |
56 | ALIPURDUAR | SM/07198 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Mujnai T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 882 | 69.04 | 69.04 | 03/09/2021 | 8 | 54.27 | 26.44 | 48.72 | 90 |
57 | ALIPURDUAR | SM/07199 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Makrapara T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 688 | 61.63 | 61.63 | 03/09/2020 | 8 | 65.27 | 44.37 | 67.98 | 90 |
58 | ALIPURDUAR | SM/08080 | FHTC under Jaldhara/Jal Sapna including retrofitting of existing distribution system under the command area of Jaigaon & Falakata water supply scheme. | Retrofitting | RWS Kalchini Block | 04/12/2020 | 29,206 | 1,224.31 | 1,224.31 | 17/06/2021 | 75 | 1,382.81 | 818.08 | 59.16 | 86 |
59 | ALIPURDUAR | SM/08580 | Supply of potable drinking water to Mujnai Tea Garden in relation with Chaa Sundari Project. | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/01/2021 | 882 | 295.97 | 295.97 | 02/12/2024 | 14 | 262.86 | 136.61 | 51.97 | 90 |
60 | ALIPURDUAR | SM/08880 | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of UTTAR MADARIHAT Water Supply Scheme | Retrofitting | Alipurduar Sub Division | 19/08/2021 | 2,328 | 140.24 | 140.24 | 27/09/2021 | 9 | 195.48 | 124.41 | 63.64 | 90 |
61 | ALIPURDUAR | SM/08881 | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of UTTAR SISHUBARI Water Supply Scheme | Retrofitting | Birpara Sub Division | 19/08/2021 | 874 | 184.32 | 184.32 | 03/09/2021 | 7 | 192.37 | 74.86 | 38.91 | 90 |
62 | ALIPURDUAR | SM/08882 | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of CHANDIRJHAR Water Supply Scheme | Retrofitting | Alipurduar Sub Division | 19/08/2021 | 1,096 | 129.45 | 129.45 | 05/10/2021 | 7 | 148.65 | 107.13 | 72.07 | 90 |
63 | ALIPURDUAR | SM/08883 | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of SALKUMARHAT Water Supply Scheme | Retrofitting | Birpara Sub Division | 19/08/2021 | 1,393 | 87.85 | 87.85 | 03/09/2020 | 7 | 122.50 | 82.80 | 67.59 | 90 |
64 | ALIPURDUAR | SM/08884 | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of HASIMARA Water Supply Scheme | Retrofitting | RWS Kalchini Block | 19/08/2021 | 2,599 | 398.83 | 398.83 | 01/04/2022 | 17 | 455.04 | 333.29 | 73.24 | 81 |
65 | ALIPURDUAR | SM/09883 | AUGMENTATION OF BHOLARDABRI PIPE WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 6,045 | 451.23 | 451.23 | 14/11/2024 | 28 | 386.18 | 268.58 | 69.55 | 78 |
66 | ALIPURDUAR | SM/09884 | AUGMENTATION OF PUTIMARI PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 2,333 | 484.93 | 484.93 | 29/02/2024 | 24 | 510.31 | 391.71 | 76.76 | 85 |
67 | ALIPURDUAR | SM/09885 | AUGMENTATION OF BHUTNIRGHAT PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 22/11/2021 | 3,226 | 449.91 | 449.91 | 02/05/2022 | 19 | 475.74 | 376.12 | 79.06 | 90 |
68 | ALIPURDUAR | SM/09886 | REJUVENATION OF MADHYA PAROKATA PIPED WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 2,202 | 257.81 | 257.81 | 11/01/2022 | 8 | 334.80 | 190.95 | 57.03 | 95 |
69 | ALIPURDUAR | SM/09887 | REJUVENATION OF HASIMARA WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 22/11/2021 | 0 | 92.50 | 92.50 | 01/04/2022 | 20 | 120.53 | 26.03 | 21.6 | 98 |
70 | ALIPURDUAR | SM/09888 | REJUVINATION OF 'DHAOLAJHORA .T.G WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 43.87 | 43.87 | 13/05/2022 | 4 | 29.09 | 18.89 | 64.94 | 95 |
71 | ALIPURDUAR | SM/09890 | REJUVENATION OF 'BAKLA WATER SUPPLY SCHEME' | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 0 | 45.21 | 45.21 | 11/01/2022 | 3 | 37.61 | 20.92 | 55.62 | 98 |
72 | ALIPURDUAR | SM/09891 | REJUVENATION OF 'BANCHUKAMARI WATER SUPPLY SCHEME' | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 47.49 | 47.49 | 11/01/2022 | 6 | 58.88 | 17.67 | 30.01 | 82 |
73 | ALIPURDUAR | SM/09892 | REJUVINATION OF 'CHANDIRJHAR WATER SUPPLY SCHEME' | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 0 | 47.49 | 47.49 | 05/10/2021 | 9 | 54.25 | 31.93 | 58.86 | 98 |
74 | ALIPURDUAR | SM/09893 | REJUVENATION OF 'PURBA CHEPANI WATER SUPPLY SCHEME' | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 0 | 45.22 | 45.22 | 10/08/2022 | 4 | 34.22 | 30.26 | 88.43 | 90 |
75 | ALIPURDUAR | SM/09894 | REJUVENATION OF MUNSHIPARA WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 44.01 | 44.01 | 14/01/2022 | 5 | 37.81 | 15.12 | 39.99 | 85 |
76 | ALIPURDUAR | SM/09895 | Rejuvenation of Makrapara TG WSS. | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.22 | 45.22 | 31/01/2022 | 6 | 64.99 | 35.52 | 54.65 | 90 |
77 | ALIPURDUAR | SM/09896 | REJUVENATION OF DHUMCHIPARA. T.G. WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.23 | 45.23 | 31/01/2022 | 6 | 30.53 | 15.77 | 51.65 | 93 |
78 | ALIPURDUAR | SM/09897 | REJUVENATION OF BIRPARA(APD) WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.48 | 45.48 | 03/09/2021 | 6 | 38.90 | 37.82 | 97.22 | 98 |
79 | ALIPURDUAR | SM/09898 | REJUVENATION OF JAYANTI WATER SUPPLY SCHEME' | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 608 | 47.48 | 47.48 | 13/09/2021 | 12 | 56.27 | 34.71 | 61.68 | 95 |
80 | ALIPURDUAR | SM/09899 | REJUVINATION OF 'JASHODANGA WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 1, Northern Mechanical Division-II,PHE Dte. | 22/11/2021 | 0 | 45.28 | 45.28 | 31/01/2022 | 6 | 42.51 | 34.57 | 81.32 | 97 |
81 | ALIPURDUAR | SM/09900 | REJUVENATION OF 'PASCHIM KHAIRBARI WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.23 | 45.23 | 20/05/2022 | 1 | 2.87 | 2.87 | 100 | 50 |
82 | ALIPURDUAR | SM/09901 | REJUVENATION OF HANTUPARA TG WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 44.25 | 44.25 | 18/02/2022 | 6 | 42.11 | 31.47 | 74.73 | 90 |
83 | ALIPURDUAR | SM/09902 | REJUVINATION OF ' UTTAR MADARIHAT WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 47.49 | 47.49 | 19/05/2023 | 5 | 45.81 | 8.37 | 18.27 | 86 |
84 | ALIPURDUAR | SM/09903 | REJUVENATION OF 'CHOTO SALKUMAR WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 22/11/2021 | 0 | 45.22 | 45.22 | 05/10/2021 | 10 | 39.54 | 28.18 | 71.27 | 93 |
85 | ALIPURDUAR | SM/09904 | Rejuvenation Of Dima T.G. W.S.S | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 44.51 | 44.51 | 03/09/2020 | 5 | 31.66 | 13.51 | 42.67 | 70 |
86 | ALIPURDUAR | SM/09905 | REJUVENATION OF 'LOKNATHPUR WATER SUPPLY SCHEME' | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 0 | 45.51 | 45.51 | 13/12/2021 | 9 | 38.86 | 4.19 | 10.78 | 97 |
87 | ALIPURDUAR | SM/09906 | Rejuvenation of Gargenda Tea Garden Water Supply Scheme | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.22 | 45.22 | 23/02/2023 | 2 | 14.94 | 14.67 | 98.19 | 94 |
88 | ALIPURDUAR | SM/09907 | REJUVENATION OF SALSALABARI WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 0 | 44.74 | 44.74 | 16/03/2023 | 2 | 27.38 | 2.39 | 8.73 | 98 |
89 | ALIPURDUAR | SM/09908 | REJUVENATION OF 'TAPSHIKHATA WATER SUPPLY SCHEME' | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 46.31 | 46.31 | 11/01/2022 | 6 | 53.03 | 21.68 | 40.88 | 85 |
90 | ALIPURDUAR | SM/09909 | REJUVENATION OF MADHU TG WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.46 | 45.46 | 27/12/2021 | 6 | 46.31 | 34.65 | 74.82 | 72 |
91 | ALIPURDUAR | SM/09910 | REJUVENATION OF PAITKAPARA WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 47.45 | 47.45 | 01/04/2022 | 5 | 28.76 | 18.03 | 62.69 | 95 |
92 | ALIPURDUAR | SM/10038 | Dheklapara Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project. | New | Birpara Sub Division | 10/02/2021 | 567 | 247.03 | 247.03 | 02/12/2024 | 5 | 205.70 | 68.46 | 33.28 | 90 |
93 | ALIPURDUAR | SM/10039 | Torsha Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project. | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 10/02/2021 | 1,348 | 284.23 | 284.23 | 12/12/2022 | 10 | 308.42 | 225.00 | 72.95 | 90 |
94 | ALIPURDUAR | SM/10054 | Supply of Potable Drinking Water to Lankapara Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project. | New | Birpara Sub Division | 08/01/2021 | 2,682 | 332.16 | 332.16 | 12/08/2024 | 11 | 322.24 | 12.88 | 4 | 75 |
95 | ALIPURDUAR | SM/10154 | AUGMENTATION OF NARATHALI PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 3,764 | 632.84 | 632.84 | 30/03/2024 | 23 | 590.56 | 452.82 | 76.68 | 90 |
96 | ALIPURDUAR | SM/10155 | REJUVENATION OF TATPARA PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,040 | 140.66 | 140.66 | 08/06/2022 | 7 | 200.29 | 107.25 | 53.55 | 90 |
97 | ALIPURDUAR | SM/10156 | AUGMENTATION OF JATESWAR PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/12/2021 | 1,020 | 706.17 | 706.17 | 21/01/2023 | 25 | 719.85 | 380.80 | 52.9 | 68 |
98 | ALIPURDUAR | SM/10169 | AUGMENTATION OF JAGIJHORA BARABAK PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/12/2021 | 1,527 | 378.84 | 378.84 | 15/09/2023 | 17 | 254.37 | 65.42 | 25.72 | 90 |
99 | ALIPURDUAR | SM/10170 | REJUVENATION OF UTTAR KAMAKHYAGURI PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 2,836 | 509.72 | 509.72 | 20/06/2022 | 20 | 537.17 | 265.90 | 49.5 | 92 |
100 | ALIPURDUAR | SM/10171 | AUGMENTATION OF UTTAR MAJHER DABRI PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 3,164 | 750.42 | 750.42 | 08/06/2022 | 22 | 746.15 | 542.67 | 72.73 | 92 |
101 | ALIPURDUAR | SM/10172 | MATHURA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 2,579 | 810.28 | 810.28 | 14/11/2024 | 14 | 733.75 | 403.59 | 55 | 90 |
102 | ALIPURDUAR | SM/10173 | MADARIHAT TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 2,277 | 886.25 | 886.25 | 01/04/2022 | 22 | 1,213.86 | 473.04 | 38.97 | 88 |
103 | ALIPURDUAR | SM/10174 | DAKSHIN PAITKAPARA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,867 | 732.56 | 732.56 | 29/02/2024 | 16 | 780.70 | 433.35 | 55.51 | 90 |
104 | ALIPURDUAR | SM/10175 | SIDHABARI PIED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,605 | 360.32 | 360.32 | 01/04/2022 | 13 | 434.27 | 215.15 | 49.54 | 65 |
105 | ALIPURDUAR | SM/10176 | MECHPARA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,425 | 426.36 | 426.36 | 01/04/2022 | 14 | 480.33 | 48.71 | 10.14 | 75 |
106 | ALIPURDUAR | SM/10177 | JAYBIRPARA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,248 | 338.59 | 338.59 | 13/05/2022 | 9 | 366.73 | 114.19 | 31.14 | 70 |
107 | ALIPURDUAR | SM/10178 | GOPALPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,487 | 577.33 | 577.33 | 01/04/2022 | 20 | 774.80 | 446.63 | 57.64 | 85 |
108 | ALIPURDUAR | SM/10179 | CHUNIA JHORA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 647 | 364.15 | 364.15 | 01/04/2022 | 10 | 463.75 | 191.13 | 41.21 | 90 |
109 | ALIPURDUAR | SM/10180 | GANGUTIA TEA GARDEN AREA PIPED WATER SUPPLY SHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,250 | 376.91 | 376.91 | 01/04/2022 | 9 | 449.47 | 163.06 | 36.28 | 86 |
110 | ALIPURDUAR | SM/10316 | AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 27/01/2022 | 2,393 | 281.05 | 281.05 | 02/05/2022 | 15 | 143.64 | 40.20 | 27.99 | 85 |
111 | ALIPURDUAR | SM/10637 | Providing FHTC of existing LDS under command area UTTARLATABARI WSS at Kalchini Block. | Augmentation | Birpara Sub Division | 16/03/2022 | 3,877 | 252.10 | 252.10 | 11/05/2022 | 15 | 246.05 | 124.40 | 50.56 | 85 |
112 | ALIPURDUAR | SM/10667 | AUGMENTATION OF BAKLA WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 16/03/2022 | 40 | 186.88 | 186.88 | 23/08/2023 | 5 | 88.15 | 16.71 | 18.96 | 61 |
113 | ALIPURDUAR | SM/10668 | AUGMENTATION OF JASHODANGA WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 16/03/2022 | 20 | 69.44 | 69.44 | 06/04/2023 | 4 | 47.97 | 0.36 | 0.75 | 90 |
114 | ALIPURDUAR | SM/10669 | AUGMENTATION OF PURBA CHEPANI WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 50 | 161.24 | 161.24 | 14/11/2024 | 9 | 49.89 | 11.06 | 22.17 | 30 |
115 | ALIPURDUAR | SM/10670 | AUGMENTATION OF SALSALABARI WATER SUPPLY SCHEME. | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 16/03/2022 | 45 | 108.13 | 108.13 | 19/09/2022 | 5 | 62.83 | 29.60 | 47.11 | 60 |
116 | ALIPURDUAR | SM/10671 | AUGMENTATION OF BIRPARA (APD) WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 38 | 152.39 | 152.39 | 13/05/2022 | 8 | 91.80 | 18.79 | 20.47 | 88 |
117 | ALIPURDUAR | SM/10672 | AUGMENTATION OF PASCHIM KHAIRBARI WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 30 | 162.74 | 162.74 | 30/12/2024 | 6 | 45.51 | 0.00 | 0 | 75 |
118 | ALIPURDUAR | SM/10673 | AUGMENTATION OF LOKNATHPUR WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 16/03/2022 | 50 | 252.98 | 252.98 | 13/05/2022 | 8 | 137.93 | 16.34 | 11.85 | 85 |
119 | ALIPURDUAR | SM/10674 | AUGMENTATION OF BANCHUKAMARI WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 60 | 236.97 | 236.97 | 14/11/2024 | 5 | 136.83 | 4.13 | 3.02 | 70 |
120 | ALIPURDUAR | SM/10675 | AUGMENTATION OF MUNSHIPARA WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 50 | 178.64 | 178.64 | 16/03/2023 | 3 | 92.35 | 51.29 | 55.54 | 85 |
121 | ALIPURDUAR | SM/10676 | AUGMENTATION OF TAPASHIKHATA PIPED WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 40 | 252.39 | 252.39 | 14/11/2024 | 8 | 66.01 | 5.02 | 7.6 | 85 |
122 | ALIPURDUAR | SM/10677 | AUGMENTATION OF CHANDIRJHAR WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 2,678 | 192.09 | 192.09 | 13/05/2022 | 7 | 39.36 | 8.65 | 21.98 | 85 |
123 | ALIPURDUAR | SM/10678 | AUGMENTATION OF JOGENDRAPUR WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/03/2022 | 2,100 | 274.45 | 274.45 | 05/08/2022 | 6 | 201.82 | 26.54 | 13.15 | 90 |
124 | ALIPURDUAR | SM/10776 | IMPLEMENTATION OF STANDALONE WATER SUPPLY SYSTEM IN THE VILLAGES HAVING LESS THAN 100 HOUSEHOLD UNDER ALIPURDUAR DISTRICT PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division | 17/02/2022 | 0 | 167.97 | 167.97 | 31/05/2022 | 2 | 161.36 | 97.37 | 60.34 | 91 |
125 | ALIPURDUAR | SM/11401 | AUGMENTATION OF PATLAKHAWA WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 2,981 | 140.89 | 140.89 | 03/09/2021 | 10 | 160.88 | 126.06 | 78.36 | 75 |
126 | ALIPURDUAR | SM/11402 | AUGMENTATION OF JAYANTI PIPED WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 608 | 86.31 | 86.31 | 17/08/2022 | 10 | 96.31 | 55.06 | 57.17 | 90 |
127 | ALIPURDUAR | SM/11459 | AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 27/01/2022 | 7,440 | 1,873.61 | 1,873.61 | 14/11/2024 | 45 | 1,706.39 | 792.63 | 46.45 | 72 |
128 | ALIPURDUAR | SM/11482 | KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 1,493 | 395.23 | 395.23 | 15/07/2022 | 18 | 376.77 | 159.81 | 42.42 | 90 |
129 | ALIPURDUAR | SM/11483 | Bandpani Tea Garden Areas Piped Water Supply Scheme. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 1,272 | 528.37 | 528.37 | 21/01/2023 | 18 | 398.41 | 207.20 | 52.01 | 80 |
130 | ALIPURDUAR | SM/11484 | NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 1,520 | 455.23 | 455.23 | 14/11/2024 | 16 | 375.78 | 200.01 | 53.23 | 90 |
131 | ALIPURDUAR | SM/11485 | SANKOSH TG AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 1,567 | 389.92 | 389.92 | 15/07/2022 | 13 | 371.66 | 180.58 | 48.59 | 85 |
132 | ALIPURDUAR | SM/11696 | HOASINBAD TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 25/04/2022 | 990 | 411.35 | 411.35 | 19/09/2022 | 8 | 309.97 | 171.53 | 55.34 | 85 |
133 | ALIPURDUAR | SM/11709 | SHRINATHPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 25/04/2022 | 1,702 | 817.44 | 817.44 | 14/11/2024 | 26 | 769.79 | 507.22 | 65.89 | 95 |
134 | ALIPURDUAR | SM/11765 | AUGMENTATION OF TOTOPARA AREA PIPED WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block | 25/04/2022 | 110 | 154.07 | 154.07 | 04/04/2023 | 6 | 141.84 | 51.71 | 36.46 | 60 |
135 | ALIPURDUAR | SM/11766 | AUGMENTATION OF NEPANIA PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 25/04/2022 | 400 | 88.14 | 88.14 | 09/11/2023 | 4 | 105.05 | 30.66 | 29.19 | 75 |
136 | ALIPURDUAR | SM/11767 | AUGMENTATION OF LANKAPARA TG FOR LONKAPARA HAT AREA PIPED WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 25/04/2022 | 250 | 204.15 | 204.15 | 05/01/2021 | 13 | 153.38 | 46.70 | 30.45 | 80 |
137 | ALIPURDUAR | SM/11958 | AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 16/03/2022 | 493 | 562.16 | 562.16 | 04/04/2023 | 15 | 269.39 | 64.48 | 23.94 | 85 |
138 | ALIPURDUAR | SM/11959 | AUGMENTATION OF UTTAR SISUBARI WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 807 | 648.63 | 648.63 | 19/05/2023 | 9 | 379.65 | 21.15 | 5.57 | 65 |
139 | ALIPURDUAR | SM/11960 | AUGMENTATION OF DALMORE & RAMJHORA TEA GARDEN PIPED WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 1,031 | 512.91 | 512.91 | 06/06/2023 | 9 | 328.92 | 87.05 | 26.47 | 72 |
140 | ALIPURDUAR | SM/11970 | AUGMENTATION OF DAKSHIN SONAPUR WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 16/03/2022 | 7,780 | 1,275.43 | 1,275.43 | 21/06/2024 | 28 | 972.91 | 297.51 | 30.58 | 70 |
141 | ALIPURDUAR | SM/11985 | AUGMENTATION OF KUMARGRAM PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 7,273 | 2,156.38 | 2,156.38 | 21/12/2022 | 33 | 1,872.33 | 690.62 | 36.89 | 75 |
142 | ALIPURDUAR | SM/11991 | KARTIKA TEA GARDEN AREA PIPED WAATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 15/07/2022 | 1,128 | 432.05 | 432.05 | 25/08/2023 | 11 | 396.17 | 245.76 | 62.03 | 90 |
143 | ALIPURDUAR | SM/11992 | PHASKHAWA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division | 15/07/2022 | 705 | 269.79 | 269.79 | 25/08/2023 | 11 | 229.75 | 83.55 | 36.37 | 85 |
144 | ALIPURDUAR | SM/12113 | KOHINUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 15/07/2022 | 2,542 | 821.35 | 821.35 | 18/05/2023 | 19 | 630.18 | 293.15 | 46.52 | 81 |
145 | ALIPURDUAR | SM/12114 | RAYDAK TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 15/07/2022 | 1,999 | 588.27 | 588.27 | 18/04/2023 | 21 | 549.34 | 175.36 | 31.92 | 90 |
146 | ALIPURDUAR | SM/12361 | AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 16/03/2022 | 1,277 | 1,269.79 | 1,269.79 | 21/09/2023 | 17 | 337.07 | 49.85 | 14.79 | 35 |
147 | ALIPURDUAR | SM/12561 | AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 27/01/2022 | 7,617 | 1,852.66 | 1,852.66 | 14/11/2024 | 47 | 1,511.61 | 961.92 | 63.64 | 85 |
148 | ALIPURDUAR | SM/12753 | SISHA JUMRHA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/08/2022 | 2,683 | 797.79 | 797.79 | 12/03/2024 | 8 | 665.41 | 206.58 | 31.05 | 88 |
149 | ALIPURDUAR | SM/12754 | NAOTHOARTARI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 22/08/2022 | 295 | 415.72 | 415.72 | 14/03/2024 | 8 | 334.07 | 71.59 | 21.43 | 68 |
150 | ALIPURDUAR | SM/13239 | KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick),RWS Falakata Block | 09/09/2022 | 4,031 | 716.98 | 716.98 | 18/05/2023 | 16 | 653.09 | 357.99 | 54.81 | 88 |
151 | ALIPURDUAR | SM/13240 | PASCHIM CHENGMARI PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 929 | 741.26 | 741.26 | 25/08/2023 | 8 | 427.15 | 39.24 | 9.19 | 88 |
152 | ALIPURDUAR | SM/13241 | BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,437 | 780.16 | 780.16 | 19/05/2023 | 12 | 530.81 | 96.15 | 18.11 | 50 |
153 | ALIPURDUAR | SM/13242 | CHUOTA DALDALI PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,001 | 615.61 | 615.61 | 23/08/2023 | 13 | 368.63 | 2.41 | 0.65 | 55 |
154 | ALIPURDUAR | SM/13243 | PURBA KHALISHAMARI PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,919 | 963.61 | 963.61 | 14/11/2024 | 14 | 621.79 | 309.08 | 49.71 | 89 |
155 | ALIPURDUAR | SM/13244 | NIMTI DOMOHANI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 09/09/2022 | 1,482 | 710.27 | 710.27 | 12/07/2024 | 10 | 602.12 | 162.30 | 26.95 | 88 |
156 | ALIPURDUAR | SM/13245 | PASCHIM SATALI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 09/09/2022 | 2,797 | 969.65 | 969.65 | 07/09/2023 | 10 | 889.92 | 597.02 | 67.09 | 85 |
157 | ALIPURDUAR | SM/13246 | BARIGURI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 09/09/2022 | 6,943 | 895.77 | 895.77 | 16/05/2023 | 11 | 698.17 | 44.17 | 6.33 | 70 |
158 | ALIPURDUAR | SM/13247 | PRODHANPARA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 09/09/2022 | 1,353 | 638.14 | 638.14 | 07/03/2025 | 8 | 479.21 | 12.64 | 2.64 | 85 |
159 | ALIPURDUAR | SM/13248 | MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block | 09/09/2022 | 2,462 | 877.17 | 877.17 | 14/11/2024 | 13 | 761.05 | 125.78 | 16.53 | 82 |
160 | ALIPURDUAR | SM/13249 | BUXA FOREST (RAJA BHATKHAWA) PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 2,652 | 860.22 | 860.22 | 08/08/2024 | 19 | 746.21 | 0.00 | 0 | 20 |
161 | ALIPURDUAR | SM/13299 | KAYAKHATA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 09/09/2022 | 1,585 | 682.41 | 682.41 | 28/08/2023 | 11 | 435.04 | 136.19 | 31.31 | 75 |
162 | ALIPURDUAR | SM/13300 | BRAJERKUTHI PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,847 | 944.20 | 944.20 | 10/09/2024 | 17 | 695.17 | 372.41 | 53.57 | 90 |
163 | ALIPURDUAR | SM/13301 | PURBA CHIKLIGURI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 09/09/2022 | 1,869 | 875.66 | 875.66 | 10/09/2024 | 13 | 716.23 | 247.90 | 34.61 | 70 |
164 | ALIPURDUAR | SM/13302 | DAKSHIN BARAJHAR FOREST PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 09/09/2022 | 308 | 171.75 | 171.75 | 10/09/2024 | 5 | 139.95 | 55.78 | 39.86 | 85 |
165 | ALIPURDUAR | SM/13303 | TELIPARA PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,029 | 488.14 | 488.14 | 14/11/2024 | 14 | 378.80 | 94.05 | 24.83 | 90 |
166 | ALIPURDUAR | SM/13304 | MARAKHATA PIPED WATER SUPPLY SCHEME. | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 3,129 | 839.09 | 839.09 | 23/08/2023 | 13 | 511.62 | 113.90 | 22.26 | 86 |
167 | ALIPURDUAR | SM/13305 | DAKSHIN MAJIDKHANA PIPED WATER SUPPLY SCHEME. | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,402 | 760.21 | 760.21 | 19/05/2023 | 13 | 570.74 | 292.51 | 51.25 | 85 |
168 | ALIPURDUAR | SM/13306 | KALABERIA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 09/09/2022 | 1,065 | 461.28 | 461.28 | 14/11/2024 | 8 | 331.51 | 89.29 | 26.93 | 75 |
169 | ALIPURDUAR | SM/13448 | JAYANTI TEA GARDEN -II AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 563 | 305.16 | 305.16 | 06/06/2023 | 7 | 274.16 | 49.62 | 18.1 | 65 |
170 | ALIPURDUAR | SM/13449 | ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 09/09/2022 | 1,856 | 695.45 | 695.45 | 07/09/2023 | 14 | 621.44 | 286.06 | 46.03 | 88 |
171 | ALIPURDUAR | SM/14092 | ATIABARI TEA GARDEN PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/09/2022 | 1,884 | 895.42 | 895.42 | 14/11/2024 | 14 | 757.21 | 223.97 | 29.58 | 88 |
172 | ALIPURDUAR | SM/14093 | RAJABHAT TEA GARDEN PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/09/2022 | 1,074 | 528.73 | 528.73 | 14/11/2024 | 9 | 279.30 | 112.70 | 40.35 | 90 |
173 | ALIPURDUAR | SM/14096 | AUGMENTATION OF BHATIBARI PIPED WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 27/01/2022 | 8,070 | 2,031.40 | 2,031.40 | 14/11/2024 | 62 | 1,846.98 | 745.48 | 40.36 | 86 |
174 | ALIPURDUAR | SM/14209 | PARARPAR PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 26/09/2022 | 1,187 | 561.82 | 561.82 | 21/03/2025 | 11 | 431.87 | 87.73 | 20.31 | 70 |
175 | ALIPURDUAR | SM/14210 | FOSKADANGA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 26/09/2022 | 684 | 510.99 | 510.99 | 07/09/2023 | 9 | 390.21 | 101.04 | 25.89 | 65 |
176 | ALIPURDUAR | SM/14211 | BHATKHAWA TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 1,604 | 530.22 | 530.22 | 14/11/2024 | 10 | 426.92 | 129.45 | 30.32 | 78 |
177 | ALIPURDUAR | SM/14212 | BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 26/09/2022 | 2,321 | 570.23 | 570.23 | 06/10/2023 | 10 | 526.60 | 152.95 | 29.04 | 90 |
178 | ALIPURDUAR | SM/14213 | RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 26/09/2022 | 2,268 | 740.97 | 740.97 | 28/03/2024 | 13 | 584.61 | 12.08 | 2.07 | 50 |
179 | ALIPURDUAR | SM/14214 | BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 26/09/2022 | 1,579 | 527.26 | 527.26 | 09/04/2025 | 11 | 450.71 | 96.11 | 21.32 | 90 |
180 | ALIPURDUAR | SM/14215 | NIMTIJHORA TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 26/09/2022 | 1,002 | 336.47 | 336.47 | 07/09/2023 | 9 | 248.09 | 79.30 | 31.96 | 90 |
181 | ALIPURDUAR | SM/14216 | GAROCHIRA BANDAPANI PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 130 | 129.41 | 129.41 | 19/01/2023 | 4 | 117.28 | 37.08 | 31.62 | 93 |
182 | ALIPURDUAR | SM/14217 | DAKSHIN RANGALIBAZNA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 794 | 409.38 | 409.38 | 03/10/2023 | 9 | 377.94 | 100.57 | 26.61 | 60 |
183 | ALIPURDUAR | SM/14218 | NURPUR PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 423 | 451.36 | 451.36 | 16/08/2023 | 11 | 308.26 | 141.67 | 45.96 | 93 |
184 | ALIPURDUAR | SM/14219 | TURTURI PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 1,003 | 948.08 | 948.08 | 23/08/2023 | 18 | 562.61 | 243.79 | 43.33 | 75 |
185 | ALIPURDUAR | SM/14220 | TORSHA FOREST PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 26/09/2022 | 201 | 142.14 | 142.14 | 24/08/2023 | 5 | 109.60 | 85.89 | 78.37 | 90 |
186 | ALIPURDUAR | SM/14221 | BALLALGURI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block | 26/09/2022 | 609 | 413.54 | 413.54 | 07/09/2023 | 7 | 290.09 | 131.77 | 45.42 | 75 |
187 | ALIPURDUAR | SM/14222 | UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 729 | 429.71 | 429.71 | 03/10/2023 | 7 | 393.70 | 13.44 | 3.41 | 70 |
188 | ALIPURDUAR | SM/14223 | PAKRIGURI PIPED WAYER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 603 | 509.75 | 509.75 | 23/08/2023 | 16 | 319.58 | 3.62 | 1.13 | 55 |
189 | ALIPURDUAR | SM/14233 | AUGMENTATION OF BIRPARA WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 18,867 | 2,288.93 | 2,288.93 | 16/04/2025 | 48 | 2,130.92 | 325.53 | 15.28 | 65 |
190 | ALIPURDUAR | SM/15206 | MAIRADANGA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/11/2022 | 2,583 | 963.71 | 963.71 | 16/05/2023 | 8 | 797.33 | 90.14 | 11.31 | 70 |
191 | ALIPURDUAR | SM/15207 | PASCHIM DEOGAON PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/11/2022 | 2,097 | 802.95 | 802.95 | 20/07/2023 | 10 | 720.97 | 107.91 | 14.97 | 65 |
192 | ALIPURDUAR | SM/15208 | DHANIRAMPUR PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/11/2022 | 1,552 | 670.33 | 670.33 | 14/03/2024 | 7 | 566.55 | 213.40 | 37.67 | 78 |
193 | ALIPURDUAR | SM/15209 | AUGMENTATION OF HANTUPARA TG PIPED WATER SUPPLY SCHEME. | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/11/2022 | 0 | 112.19 | 112.19 | 18/02/2025 | 4 | 45.99 | 9.52 | 20.7 | 80 |
194 | ALIPURDUAR | SM/15210 | AUGMENTATION OF DHUMCHIPARA TG PIPED WATER SUPPLY SCHEME. | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/11/2022 | 0 | 111.32 | 111.32 | 16/01/2024 | 7 | 109.88 | 11.80 | 10.74 | 60 |
195 | ALIPURDUAR | SM/15482 | KALCHINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 27/01/2022 | 5,753 | 1,380.67 | 1,380.67 | 14/11/2024 | 28 | 1,233.12 | 112.24 | 9.1 | 50 |
196 | ALIPURDUAR | SM/15517 | MADHYA KAMAKHYAGURI PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,645 | 1,067.02 | 1,067.02 | 14/11/2024 | 14 | 735.67 | 412.23 | 56.03 | 83 |
197 | ALIPURDUAR | SM/15534 | CHALNIPAK PIPED WATER SUPPLY SCHEME. | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block | 26/09/2022 | 1,648 | 1,024.40 | 1,024.40 | 23/08/2023 | 14 | 670.56 | 315.71 | 47.08 | 80 |
198 | ALIPURDUAR | SM/15758 | NARASINGPUR PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/11/2022 | 2,461 | 842.46 | 842.46 | 20/07/2023 | 9 | 784.14 | 252.96 | 32.26 | 70 |
199 | ALIPURDUAR | SM/15914 | UTTAR BARAJHAR FOREST PIPE WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 30/09/2022 | 567 | 358.24 | 358.24 | 24/04/2023 | 6 | 235.16 | 15.00 | 6.38 | 6 |
200 | ALIPURDUAR | SM/16114 | UMACHARANPUR PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/11/2022 | 3,053 | 950.07 | 950.07 | 12/07/2024 | 9 | 806.11 | 0.00 | 0 | 50 |
201 | ALIPURDUAR | SM/16115 | REJUVENATION OF SIDHABARI PIPED WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division | 16/11/2022 | 0 | 240.25 | 240.25 | 31/01/2023 | 2 | 84.07 | 0.00 | 0 | 50 |
202 | ALIPURDUAR | SM/16506 | 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 28/12/2022 | 1,752 | 990.41 | 990.41 | 08/08/2024 | 25 | 486.22 | 12.04 | 2.48 | 3 |
203 | ALIPURDUAR | SM/16507 | BUXA PIPE WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 28/12/2022 | 219 | 219.61 | 219.61 | 17/02/2025 | 5 | 83.18 | 0.00 | 0 | 2 |
204 | ALIPURDUAR | SM/16537 | PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 2,273 | 1,261.38 | 1,261.38 | 14/11/2024 | 18 | 836.41 | 235.43 | 28.15 | 75 |
205 | ALIPURDUAR | SM/16538 | UTTAR MAJID KHANA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 09/09/2022 | 1,888 | 1,074.69 | 1,074.69 | 14/11/2024 | 13 | 608.07 | 308.99 | 50.81 | 70 |
206 | ALIPURDUAR | SM/16539 | UTTAR MANDABARI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 09/09/2022 | 2,329 | 1,121.63 | 1,121.63 | 28/07/2023 | 13 | 953.26 | 124.10 | 13.02 | 75 |
207 | ALIPURDUAR | SM/16817 | UTTAR DEOGAON PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 1,601 | 808.50 | 808.50 | 20/07/2023 | 11 | 778.91 | 42.10 | 5.4 | 65 |
208 | ALIPURDUAR | SM/16818 | MALSAGAON PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 1,481 | 777.46 | 777.46 | 07/09/2023 | 7 | 641.46 | 203.60 | 31.74 | 70 |
209 | ALIPURDUAR | SM/16819 | LACHHIMANDABRI PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 1,272 | 658.29 | 658.29 | 03/08/2023 | 9 | 610.49 | 9.01 | 1.48 | 60 |
210 | ALIPURDUAR | SM/16820 | BENGKANDI PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 2,074 | 964.09 | 964.09 | 28/07/2023 | 9 | 911.89 | 10.83 | 1.19 | 60 |
211 | ALIPURDUAR | SM/16821 | DALMONI TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 442 | 405.28 | 405.28 | 31/03/2023 | 7 | 270.26 | 5.16 | 1.91 | 25 |
212 | ALIPURDUAR | SM/16822 | TASTI TEA GARDEN PIPED WATER SUPPLY SCHEME. | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 1,184 | 569.65 | 569.65 | 19/05/2023 | 10 | 403.93 | 27.39 | 6.78 | 60 |
213 | ALIPURDUAR | SM/16823 | DALGAON TEA GARDEN PIPED WATER SUPPLY SCHEME. | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 1,298 | 739.67 | 739.67 | 14/11/2024 | 10 | 518.60 | 67.84 | 13.08 | 75 |
214 | ALIPURDUAR | SM/16824 | AUGMENTATION OF GARGENDA TG PIPED WATER SUPPLY SCHEME. | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 28/12/2022 | 0 | 273.66 | 273.66 | 06/08/2024 | 11 | 216.77 | 21.60 | 9.96 | 72 |
215 | ALIPURDUAR | SM/18150 | Malangi Tea Garden Area Piped Water Supply Scheme | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 10/03/2023 | 2,115 | 561.45 | 561.45 | 04/05/2023 | 11 | 422.39 | 4.50 | 1.07 | 50 |
216 | ALIPURDUAR | SM/18151 | Khagenhat Piped Water Supply Scheme | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 10/03/2023 | 2,057 | 822.98 | 822.98 | 14/11/2024 | 11 | 652.50 | 11.50 | 1.76 | 60 |
217 | ALIPURDUAR | SM/18152 | Chengmari Piped Water Supply Scheme | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 10/03/2023 | 1,699 | 772.15 | 772.15 | 04/05/2023 | 12 | 591.89 | 215.30 | 36.38 | 65 |
218 | ALIPURDUAR | SM/18153 | Dhantali Piped Water Supply Scheme | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 10/03/2023 | 206 | 285.56 | 285.56 | 04/05/2023 | 6 | 248.07 | 7.16 | 2.89 | 70 |
219 | ALIPURDUAR | SM/18154 | Uttar Dhalkar Piped Water Supply Scheme | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 10/03/2023 | 594 | 404.14 | 404.14 | 04/05/2023 | 6 | 286.86 | 4.55 | 1.59 | 70 |
220 | ALIPURDUAR | SM/18156 | Bhutri Forest Piped Water Supply Scheme | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 10/03/2023 | 48 | 59.54 | 59.54 | 18/04/2023 | 3 | 18.24 | 4.10 | 22.48 | 95 |
221 | ALIPURDUAR | SM/18157 | Purbba Majherdabri Tea Garden Area Piped Water Supply Scheme | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 10/03/2023 | 1,538 | 360.16 | 360.16 | 22/05/2023 | 6 | 261.10 | 40.64 | 15.56 | 70 |
222 | ALIPURDUAR | SM/18158 | Parpatla Khawa Piped Water Supply Scheme | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 10/03/2023 | 189 | 187.87 | 187.87 | 04/05/2023 | 4 | 154.75 | 6.82 | 4.41 | 68 |
223 | ALIPURDUAR | SM/18254 | AUGMENTATION OF DALIMPUR PWSS | Augmentation | 27/01/2022 | 4,067 | 1,020.25 | 1,020.25 | 12/07/2023 | 21 | 990.51 | 92.64 | 9.35 | 70 | |
Total | 3,62,098 | 89,667.07 | 89,667.07 | # | 2,468 | 74,712.81 | 26,930.06 | # | # |