1 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Laying Distribution pipe with DI and UPVC pipe of Baniadabri and Samuktala Bazar Area under SAMUKTALA WSS under Alipurduar Division, PHE Dte.
|
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000278/2022-2023 |
1664/ALD |
19/09/2022 |
180 |
DILIP MAHATO |
100.58 |
92.15 |
91.62 |
46 |
2 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Laying Distribution pipe with DI and UPVC pipe of SAMUKTALA ZONE-II WSS under Alipurduar Division, PHE Dte. (Part-A)
|
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000276/2022-2023 |
1662/ALD |
19/09/2022 |
180 |
M/S SSB CONSTRUCTION CO. |
100.42 |
92.48 |
92.09 |
48 |
3 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Laying Distribution pipe with DI and UPVC pipe of Baniadabri and Garokhota Area under SAMUKTALA WSS under Alipurduar Division, PHE Dte.
|
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000279/2022-2023 |
1665/ALD |
19/09/2022 |
180 |
GOUTAM KUMAR DAS |
101.20 |
95.10 |
93.97 |
47 |
4 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Laying distribution system with new UPVC pipeline, providing FHTC and other allied works for Samuktala Zone-II PWSS under Alipurduar Division, PHE Dte. |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000355/2022-2023 |
2500/ALD |
13/12/2022 |
120 |
TAPASH KUMAR BHOWMICK |
88.46 |
80.56 |
91.07 |
50 |
5 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Soil investigation work at 3 different places of Samuktala within Alipurduar District under Alipurduar Division PHE Dte.
|
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000266/2022-2023 |
1657/ALD |
19/09/2022 |
30 |
ASIS ENTERPRISE |
3.65 |
3.65 |
100 |
50 |
6 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Laying distribution system with new UPVC/DI pipeline along with rising and delivery line connection, providing FHTC and other allied works for Samuktala Zone-III PWSS under Alipurduar Division, PHE Dte. |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000394/2022-2023 |
2659/ALD |
22/12/2022 |
120 |
ESCON INDIA |
90.53 |
50.31 |
55.57 |
50 |
7 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Construction of Boundary wall at 3rd TW site of Samuktalata PWSS under Alipurduar Division, PHE Dte.
|
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000267/2022-2023 |
1666/ALD |
19/09/2022 |
30 |
PRITAM DAS |
4.74 |
4.74 |
100 |
47 |
8 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Laying Distribution pipe with DI and UPVC pipe of SAMUKTALA ZONE-II WSS under Alipurduar Division, PHE Dte. (Part-B)
|
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000277/2022-2023 |
1663/ALD |
19/09/2022 |
180 |
MATARA CONSTRUCTION CO |
101.06 |
92.43 |
91.46 |
50 |
9 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
5 nos Tube well boring by ODEX - 165 Method of drilling for the works of augmentation of SAMUKTALA PWSS under Alipurduar Division ,PHE Dte |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000342/2022-2023 |
2221/ALD |
21/11/2022 |
30 |
S.G. CONSTRUCTION |
32.14 |
25.17 |
78.31 |
50 |
10 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Laying distribution pipeline with UPVC pipe of Samuktala Zone-III Water Supply Scheme under Alipurduar Division, PHE Dte.
|
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000280/2022-2023 |
1660/ALD |
19/09/2022 |
60 |
LONGLAST PIPES (INDIA)PVT.LTD. |
97.26 |
95.08 |
97.76 |
50 |
11 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Laying of UPVC pipeline for filling of Gap in distribution system Samuktala Zone-I PWSS under Alipurduar Division, PHE Dte. |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000489/2022-2023 |
3321/ALD |
13/03/2023 |
60 |
CHANDAN KIRTONIA |
5.37 |
5.37 |
100 |
0 |
12 |
ALIPURDUAR |
|
Northern Mechanical Division II |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
NEW SERVICE CONNECTION CHARGE FOR SAMUKTALA ZONE -III P/H NO.II |
|
|
BILL/00786/2023-2024 |
BP-2023-24-220 |
13/07/2023 |
|
WBSEDCL |
1.54 |
0.00 |
0 |
0 |
13 |
ALIPURDUAR |
|
Northern Mechanical Division II |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
New Service Connection Charge For Samuktala Z-I P/H NO-II |
|
|
BILL/00901/2023-2024 |
BP-2023-24-221 |
13/07/2023 |
|
WBSEDCL |
1.54 |
0.00 |
0 |
0 |
14 |
ALIPURDUAR |
|
Northern Mechanical Division II |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
NEW SEVICE CONNECTION CHARGES FOR SAMUKTALA PWSS ZONE-IIP/H NO.I |
|
|
BILL/00741/2023-2024 |
BP-2023-24-218 |
13/07/2023 |
|
WBSEDCL |
1.54 |
0.00 |
0 |
0 |
15 |
ALIPURDUAR |
|
Northern Mechanical Division II |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
NEW SERVICE CONNECTION CHARGE FOR SAMUKTALA ZONE -III P/H NO.I |
|
|
BILL/00785/2023-2024 |
BP-2023-24-219 |
13/07/2023 |
|
WBSEDCL |
1.54 |
0.00 |
0 |
0 |
16 |
ALIPURDUAR |
|
Northern Mechanical Division II |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
New Service Connection Charge For Samuktala Z-I P/H No.I |
|
|
BILL/00902/2023-2024 |
BP-2023-24-222 |
13/07/2023 |
|
WBSEDCL |
1.54 |
0.00 |
0 |
0 |
17 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Construction of Pump House at 2nd TW site of Samuktalata PWSS under Alipurduar Division, PHE Dte. |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000293/2022-2023 |
1670/ALD |
19/09/2022 |
60 |
M/S SADHAN SAHA & CO. |
4.76 |
4.60 |
96.64 |
100 |
18 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Construction of Pump House at 3rd TW site of Samuktalata PWSS under Alipurduar Division, PHE Dte.
|
Alipurduar Sadar Sub Division |
|
ORD/000270/2022-2023 |
1671/ALD |
19/09/2022 |
60 |
SWADESH DEV |
4.75 |
4.65 |
97.89 |
100 |
19 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Construction of Boundary wall at 4th TW site of Samuktalata PWSS under Alipurduar Division, PHE Dte.
|
Alipurduar Sadar Sub Division |
|
ORD/000273/2022-2023 |
1667/ALD |
19/09/2022 |
45 |
DHANENDRA SARKAR |
4.77 |
4.74 |
99.37 |
100 |
20 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Construction of Pump House at 4th TW site of Samuktalata PWSS under Alipurduar Division, PHE Dte.
|
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000271/2022-2023 |
1672/ALD |
19/09/2022 |
60 |
PROJIT HALDER |
4.77 |
0.00 |
0 |
0 |
21 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Cons. Of pathway, surface drain and chatal, Installation of Paver block, land development along with the other allied works at Samuktala Zone-II H/W, 2nd site and 3rd Tube well Site under Alipurduar Division, PHE Dte. |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000333/2023-2024 |
2519/ALD |
24/11/2023 |
60 |
CREATIVE UN EMPLOYED ENGINEERSCO OPER SOCYLIMITED |
23.26 |
0.00 |
0 |
0 |
22 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Construction of Pump House at 1st TW site of Samuktalata PWSS under Alipurduar Division, PHE Dte.
|
Alipurduar Sadar Sub Division |
|
ORD/000269/2022-2023 |
1669/ALD |
19/09/2022 |
60 |
KOUSHIK BHOWMICK |
4.77 |
3.88 |
81.34 |
95 |
23 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Construction of 350cum OHR for SAMUKTALA ZONE-II Water Supply Scheme under Alipurduar Division, PHE Dte.
|
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000275/2022-2023 |
1661/ALD |
19/09/2022 |
180 |
MATARA CONSTRUCTION CO |
71.41 |
0.00 |
0 |
100 |
24 |
ALIPURDUAR |
|
Northern Mechanical Division II |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Augmentation of SAMUKTALA water supply scheme, TW no I AND II OF ZONE-I , TW no I AND II OF ZONE-II , TW no I AND II OF ZONE-III under Jal Jeevan Mission under NMD-II, PHE Dte.APD. |
Assistant Engineer,Alipurduar Mechanical Sub-Division,P |
Junior Engineer 2,Alipurduar Mechanical sub-division,PH |
ORD/000002/2023-2024 |
759/NMD-II |
04/04/2023 |
30 |
AHALYA ENGINEERING WORKS |
63.40 |
54.42 |
85.84 |
40 |
25 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Construction of 400cum OHR for SAMUKTALA ZONE-I Water Supply Scheme under Alipurduar Division, PHE Dte.
|
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000274/2022-2023 |
1659/ALD |
19/09/2022 |
180 |
DILIP MAHATO |
77.32 |
72.80 |
94.15 |
100 |
26 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Construction of Pump House at 5th TW site of Samuktalata PWSS under Alipurduar Division, PHE Dte.
|
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000272/2022-2023 |
1673/ALD |
19/09/2022 |
60 |
CHITTA RANJAN DEY |
4.75 |
0.00 |
0 |
100 |
27 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Laying distribution system with new UPVC pipeline, providing FHTC and other allied works for Samuktala Zone-III PWSS under Alipurduar Division, PHE Dte. |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000356/2022-2023 |
2501/ALD |
13/12/2022 |
120 |
MADHAB SAHA |
93.21 |
61.95 |
66.46 |
49 |
28 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Supply of CIPE Special & CI Jeffy Coupling for Augmentation of Samuktala Water Supply Scheme under Alipurduar Division P.H.E. Dte. (SM/12561) |
Alipurduar Sadar Sub Division |
Birpara Sub Division,RWS Alipurduar - II Block |
ORD/000467/2023-2024 |
673/ALD |
06/03/2024 |
30 |
BHAGWATI BHUJEL |
11.36 |
0.00 |
0 |
15 |
29 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Land development works at headwork site and laying of new UPVC/DI pipeline for filling gap in distribution system Samuktala Zone-III PWSS under Alipurduar Division, PHE Dte. |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000488/2022-2023 |
3320/ALD |
13/03/2023 |
60 |
BHAGWATI BHUJEL |
9.19 |
0.00 |
0 |
100 |
30 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Construction of boundary wall (remaining portion) at Headwork site under Samuktala Zone-III PWSS under Alipurduar Division, PHE Dte. |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000289/2023-2024 |
1903/ALD |
07/09/2023 |
360 |
SWAPAN MALAKAR |
6.00 |
0.00 |
0 |
100 |
31 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Construction of Boundary wall at 5th TW site of Samuktalata PWSS under Alipurduar Division, PHE Dte.
|
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000268/2022-2023 |
1668/ALD |
19/09/2022 |
270 |
ROY & PANDIT CONSTRUCTIONS |
4.76 |
4.13 |
86.76 |
100 |
32 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Repairing of HW Site Boundary Wall (15M) Samuktala WSS under Alipurduar Division, PHE Dte. |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000556/2022-2023 |
3501/ALD |
23/03/2023 |
120 |
PROGRESSIVE UNEMPLOYED CO-OPERATIVE LABOUR CONTRACT & CONSTRUCTION SOCIETY LTD. |
2.14 |
0.00 |
0 |
100 |
33 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Tube well boring by ODEX-165 Method of drilling, Construction of Pump House, Boundary wall at proposed 6th site of SAMUKTALA PWSS under Alipurduar Division, PHE Dte. |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000324/2023-2024 |
2421/ALD |
09/11/2023 |
360 |
DULAL DAS |
17.57 |
0.00 |
0 |
100 |
34 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Construction of pathway, surface drain and chatal, installation of paver block, land development along with the others allied works at Samuktala Zone-I head work site PWSS under Alipurduar Division, PHE Dte. |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000197/2023-2024 |
1495/ALD |
16/08/2023 |
60 |
DIPAK DAS |
13.04 |
0.00 |
0 |
25 |
35 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Laying of rising main and delivery line connection, construction of boundary wall at headwork site of Samuktala Zone-I PWSS under Alipurduar Division, PHE Dte.
|
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000340/2023-2024 |
2541/ALD |
28/11/2023 |
360 |
DIPAK DAS |
28.74 |
0.00 |
0 |
100 |
36 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Fabrication,Erection of Signage (127 nos) of Pump house/OHR site democration with in Alipurduar-I Block for Different PWSS of JJM Project Under Alipurduar Division P.H.E.Dte. |
HQ-A.E |
RWS Kumargram Block |
ORD/000356/2024-2025 |
3443/ALD |
27/09/2024 |
15 |
M/S SARKAR & CO |
13.95 |
0.00 |
0 |
100 |
37 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Laying of new UPVC/DI pipeline for interconnection in the distribution system and bridge/culvert crossing in connection with the FHTC, fixing of FHTC by means of PCC concrete block fixing of FHTC by mean of PCC concrete block at Samuktalata Zone-III PWSS under Alipurduar Division, PHE Dte. (SM/12561) |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000380/2024-2025 |
3774/ALD |
13/11/2024 |
90 |
DAS CONSTRUCTION |
60.38 |
0.00 |
0 |
0 |
38 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
RESTORATION OF PIPELINE DAMAGED DUE TO CONSTRUCTION ACTIVITY WBSRDA |
|
|
BILL/00501/2024-2025 |
321/24-25/PFMS |
14/11/2024 |
|
EXECUTIVE ENGINEER WBSRDA |
64.01 |
0.00 |
0 |
0 |
39 |
ALIPURDUAR |
|
Northern Mechanical Division II |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
New Service Connection Charges for Samuktala Zone-II PH NO-II |
|
|
BILL/01265/2024-2025 |
BP-386/24-25 |
05/10/2024 |
|
WBSEDCL |
11.40 |
0.00 |
0 |
null |
40 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Laying of new UPVC/DI pipeline for interconnection in the distribution system and bridge/culvert crossing in connection with the FHTC, fixing of FHTC by means of PCC concrete block fixing of FHTC by mean of PCC concrete block at Samuktalata Zone-II PWSS under Alipurduar Division, PHE Dte. (SM/12561) |
Alipurduar Sadar Sub Division |
Alipurduar Sub Division,RWS Alipurduar - II Block |
ORD/000352/2024-2025 |
3422/ALD |
26/09/2024 |
120 |
KAMALESH ROY |
75.37 |
0.00 |
0 |
0 |
41 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Balance work of the boundary wall and laying of delivery line connection, land development works, surface drain & pathway at 5th site at Samuktala Zone-II in connection with Samuktala PWSS under Alipurduar Division, PHE Dte. |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000451/2024-2025 |
5064/ALD |
18/02/2025 |
60 |
DULAL DAS |
9.08 |
0.00 |
0 |
0 |
42 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Laying distribution system with new UPVC/DI pipeline along with rising and delivery line connection, providing FHTC and others allied works for Samuktala Zone-II PWSS under Alipurduar Division, PHE Dte. |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000393/2022-2023 |
2658/ALD |
22/12/2022 |
900 |
HARIDAS GHOSH |
88.71 |
79.04 |
89.1 |
48 |
43 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Construction of excess work of Boundary wall & 3m Span open Foundation Culvert with Boulder Protection works and other alied works at 2nd Site of Samuktala PWSS Zone-I PWSS Alipurduar Sadar Sub-Division, under Alipurduar Division PHE DTE. (SM/12561) |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000228/2024-2025 |
2281/ALD |
05/08/2024 |
240 |
PRITAM DAS |
12.58 |
0.00 |
0 |
100 |
44 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Supplying and Laying of Water supply line (using HDD/micro tunneling machine) for supply of drinking water in different areas of Alipurduar district under Alipurduar Division PHE Dte. |
HQ-A.E |
RWS Kumargram Block |
ORD/000464/2024-2025 |
5287/ALD |
07/03/2025 |
120 |
APEX ENGINEERING |
74.36 |
0.00 |
0 |
0 |
45 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Interconnection of distribution system by laying of DI and HDPE pipes along with bridge/culvert crossing and other allied works at Shrinathpur TG Adjacent to Samuktala PWSS (Zone-I) under Alipurduar Division, PHE Dte. |
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000462/2024-2025 |
5288/ALD |
07/03/2025 |
60 |
DEBAJYOTI SUTRADHAR |
18.28 |
0.00 |
0 |
0 |
46 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Construction of 100cum. OHR for SAMUKTALA ZONE-III Water Supply Scheme under Alipurduar Division, PHE Dte.
|
Alipurduar Sadar Sub Division |
RWS Alipurduar - II Block |
ORD/000265/2022-2023 |
1658/ALD |
19/09/2022 |
900 |
ALIPURDUAR CO-OPERATIVE LABOUR CONTRUCT & CONSTRUCTION SOCIETY LTD. |
43.90 |
21.25 |
48.41 |
100 |
47 |
ALIPURDUAR |
|
Alipurduar Division |
AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 |
Augmentation |
Reparing of Pump House no 2 at HW site of SAMUKTALA PWSS Under Alipurduar Division PHE DTE.(2nd call) |
|
|
ORD/000611/2024-2025 |
5601/ALD |
27/03/2025 |
60 |
ALIPURDUAR CO-OPERATIVE LABOUR CONTRUCT & CONSTRUCTION SOCIETY LTD. |
0.96 |
0.00 |
0 |
0 |