Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 529.98 298.15 56.26  
1 ALIPURDUAR Alipurduar - II Alipurduar Division TURTURI PIPED WATER SUPPLY SCHEME. , SM/14219 New Cons. of Pump House & Tube well Boring by ODEX-165 Method drilling at HW Site & 2nd Site, laying distribution system with UPVC pipeline including rising main & delivery connection, Cons. of 150cum OHR as per departmental Design & drawing along with soil investigation works, providing FHTC including cons. of platform and others allied works for TURTURI PWSS Under Alipurduar Division, PHE DTE Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000551/2022-2023 3574/ALD 27/03/2023 180 TAPASH KUMAR BHOWMICK 399.05 279.13 69.95 61
2 ALIPURDUAR Alipurduar - II Northern Mechanical Division II TURTURI PIPED WATER SUPPLY SCHEME. , SM/14219 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Turturi water supply scheme, TW no I and II under Jal Jeevan Mission under NMD-II, PHE Dte.APD Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000785/2023-2024 2339/NMD-II 01/08/2023 30 M/S J.K ENGINEERING CO. 18.77 5.15 27.44 80
3 ALIPURDUAR Alipurduar - II Alipurduar Division TURTURI PIPED WATER SUPPLY SCHEME. , SM/14219 New Providing balance FHTC for TURTURI PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000217/2023-2024 1571/ALD 23/08/2023 45 TAPASH KUMAR BHOWMICK 6.81 0.00 0 0
4 ALIPURDUAR Alipurduar - II Alipurduar Division TURTURI PIPED WATER SUPPLY SCHEME. , SM/14219 New Tube well boring by ODEX-165 Method of drilling, Construction of Pump House, Boundary wall at proposed 3rd site of Turturi under Alipurduar Division, PHE Dte Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000323/2023-2024 2420/ALD 09/11/2023 120 TAPASH KUMAR BHOWMICK 17.40 5.90 33.91 70
5 ALIPURDUAR Alipurduar - II Alipurduar Division TURTURI PIPED WATER SUPPLY SCHEME. , SM/14219 New Laying of HDPE/DI Pipeline, horizontal boring by HDD method, bridge and culvert crossing, providing FHTC, specials repair with trial run of pipeline and allied works at Chuniajhora PWSS under Alipurduar Division, PHE Dte.(SM/14219 & SM/10179) Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000460/2023-2024 672/ALD 06/03/2024 240 ASHOK SAPKOTA 19.39 0.00 0 100
6 ALIPURDUAR Alipurduar - II Alipurduar Division TURTURI PIPED WATER SUPPLY SCHEME. , SM/14219 New Supply of CIDF & CISS Pipes and specials for Turturi Water Supply Scheme under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000219/2023-2024 1579/ALD 24/08/2023 30 TAPASH KUMAR BHOWMICK 11.27 5.63 49.96 85
7 ALIPURDUAR Alipurduar - II Alipurduar Division TURTURI PIPED WATER SUPPLY SCHEME. , SM/14219 New Continuation for the work of Collection of house hold details at prescribed format through mobile app/Hard Copy including Geo-reference as directed by the E.I.C. and submission the same (soft copy) to P.H.E. Dte. Part-B Alipurduar Sadar Sub Division Birpara Sub Division ORD/000255/2023-2024 1107/ALD 28/07/2023 120 TAPASH KUMAR BHOWMICK 4.67 2.34 50.11 100
8 ALIPURDUAR Alipurduar - II Alipurduar Division TURTURI PIPED WATER SUPPLY SCHEME. , SM/14219 New Material Requisition To Resource Division RTOR000038/2022-2023 3046/ALD 08/02/2023 Resource Division 25.40 0.00 0 0
9 ALIPURDUAR Alipurduar - II Alipurduar Division TURTURI PIPED WATER SUPPLY SCHEME. , SM/14219 New Material Requisition To Resource Division RTOR000049/2023-2024 2397/ALD 08/11/2023 Resource Division 6.18 0.00 0 0
10 ALIPURDUAR Alipurduar - II Alipurduar Division TURTURI PIPED WATER SUPPLY SCHEME. , SM/14219 New Material Requisition To Resource Division RTOR000015/2024-2025 3949/ALD 26/11/2024 Resource Division 6.18 0.00 0 0
11 ALIPURDUAR Alipurduar - II Northern Mechanical Division II TURTURI PIPED WATER SUPPLY SCHEME. , SM/14219 New NEW SEVICE CONNECTION CHARGES FOR TURTURI PWSS P/H NO.I BILL/00739/2023-2024 BP-2023-24-282 18/08/2023 WBSEDCL 1.48 0.00 0 0
12 ALIPURDUAR Alipurduar - II Northern Mechanical Division II TURTURI PIPED WATER SUPPLY SCHEME. , SM/14219 New NEW SEVICE CONNECTION CHARGES FOR TURTURI PWSS P/H NO.II BILL/00740/2023-2024 BP-2023-24-273 18/08/2023 WBSEDCL 1.48 0.00 0 0
13 ALIPURDUAR Alipurduar - II Northern Mechanical Division II TURTURI PIPED WATER SUPPLY SCHEME. , SM/14219 New ADDITIONAL QUOTATION FOR TURTURI PH NO-II BILL/02959/2023-2024 BP-02/24-25 08/04/2024 WBSEDCL 7.36 0.00 0 null
14 ALIPURDUAR Alipurduar - II Northern Mechanical Division II TURTURI PIPED WATER SUPPLY SCHEME. , SM/14219 New ADDITIONAL QUOTATION FOR INFRASTRUCTURE DEVELOPMENT FOR TURTURI P/H NO-I BILL/00047/2024-2025 BP-03/24-25 08/04/2024 WBSEDCL 4.54 0.00 0 null
Total 529.98 298.15 56.26