Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 454.59 250.77 55.16  
1 ALIPURDUAR Kalchini Northern Mechanical Division II BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14214 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Beech TG water supply scheme, TW no I and II under Jal Jeevan Mission under NMD-II, PHE Dte.APD Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000754/2023-2024 2336/NMD-II 01/08/2023 30 KARMAKAR CONSTRUCTION 21.39 10.05 46.98 85
2 ALIPURDUAR Kalchini Alipurduar Division BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14214 New Hiring of Diesel Vehicle Maxi Cab(At least 7 seater ) for Assistant Engineer, Head Quarter, Alipurduar Division, P.H.E. Dte.(from 01.01.2024 to 31.12.2024) HQ-A.E Alipurduar Sub Division ORD/000462/2023-2024 161/ALD 11/01/2024 365 DIPAK DAS 4.80 2.25 46.88 0
3 ALIPURDUAR Kalchini Alipurduar Division BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14214 New Balance portion of boundary wall and pump house and land development of HW site, 1st site and construction of culvert and platform for BEECH TG PWSS under Kalchini Block, Alipurduar Division, PHE Dte. HQ-A.E RWS Kalchini Block ORD/000491/2023-2024 747/ALD 12/03/2024 180 MAHENDRA CHHETRI 29.65 14.47 48.8 90
4 ALIPURDUAR Kalchini Alipurduar Division BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14214 New Tube well Boring by ODEX-165 Method of drilling at HW, FIRST TUBE WELL site including laying distribution system with new HDPE pipeline , Constructions of 150 Cum OHR as per Departmental Design & drawing , TWO nos. pump house & boundary wall, providing FHTC, Soil Investigation work and others allied works for BEECH TEA GARDEN AREA PWSS Under Alipurduar Division PHE DTE. (2nd call) HQ-A.E RWS Kalchini Block ORD/000511/2022-2023 3398/ALD 16/03/2023 540 MAHENDRA CHHETRI 309.23 215.84 69.8 91
5 ALIPURDUAR Kalchini Alipurduar Division BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14214 New Providing balance FHTC from existing distribution system as per specification for BEECH TG PWSS under Alipurduar Division, PHE Dte. HQ-A.E RWS Kalchini Block ORD/000316/2023-2024 2184/ALD 06/10/2023 300 D. K. & SONS 16.37 8.16 49.85 100
6 ALIPURDUAR Kalchini Alipurduar Division BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14214 New Supply of DIDF pipes and specials and Sluice Valve for Beech TG Water Supply Scheme (SM/14214) under Alipurduar Division P.H.E. Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000204/2024-2025 1953/ALD 02/07/2024 30 KAMALA VALVES AND ENGINEERING PRIVATE LIMITED 15.43 0.00 0 85
7 ALIPURDUAR Kalchini Alipurduar Division BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14214 New Material Requisition To Resource Division RTOR000014/2023-2024 220/ALD 03/05/2023 Resource Division 36.92 0.00 0 0
8 ALIPURDUAR Kalchini Alipurduar Division BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14214 New Material Requisition To Resource Division RTOR000076/2023-2024 100/ALD 10/01/2024 Resource Division 9.73 0.00 0 0
9 ALIPURDUAR Kalchini Northern Mechanical Division II BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14214 New NEW SERVICE CONNECTION FOR BEECH TG PWSS P/H NO II,HASIMARA APPLICATION NO 4003208193 BILL/01823/2023-2024 BP-2023-24-324 27/09/2023 WBSEDCL 5.67 0.00 0 0
10 ALIPURDUAR Kalchini Northern Mechanical Division II BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14214 New NEW SERVICE CONNECTION FOR BEECH TG PWSS P/H NO I,HASIMARA APPLICATION NO 4003208190 BILL/01814/2023-2024 BP-2023-24-323 27/09/2023 WBSEDCL 5.40 0.00 0 0
Total 454.59 250.77 55.16