Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 787.88 270.74 34.36  
1 ALIPURDUAR Kumargram Alipurduar Division PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. , SM/16537 New Constructions of pump house & Tube well Boring by ODEX-165 Method of drilling at HW site & 2nd site , laying of distribution system with UPVC pipeline including rising main & delivery connection, Constructions of 250 Cum OHR as per Departmental Design & drawing along with the Soil investigation works , providing FHTC and others allied works for Purba Narathali PWSS Under Alipurduar Division PHE DTE. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000550/2022-2023 3573ALD 27/03/2023 360 MADHAB SAHA 373.15 257.55 69.02 80
2 ALIPURDUAR Kumargram Northern Mechanical Division II PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. , SM/16537 New Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Purba Narthali Water Supply Scheme TW No.- I and,II under NMD-II,PHE.Dte,APD. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/001046/2023-2024 2693/NMD-II 14/09/2023 684 P K ENGINEERING 21.75 0.00 0 70
3 ALIPURDUAR Kumargram Alipurduar Division PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. , SM/16537 New Laying of rising main line with HDPE PN10, horizontal boring by HDD method , bridge and culvert crossing, construction of pathway, surface drain and chatal, installation of paver block, land development along with the other allied works at PURBA NARATHALI HW site PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000371/2023-2024 87/ALD 10/01/2024 90 MADHAB SAHA 34.86 8.07 23.15 45
4 ALIPURDUAR Kumargram Alipurduar Division PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. , SM/16537 New Supply of DI specials and CI Jeffy coupling for Purba Narathali Water Supply Scheme(SM/16537) of Kumargram Block under Alipurduar Division P.H.E. Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000514/2023-2024 833/ALD 14/03/2024 30 DILIP MAHATO 13.51 0.00 0 0
5 ALIPURDUAR Kumargram Alipurduar Division PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. , SM/16537 New Laying of new UPVC/DI pipeline for interconnection in the distribution system, fixing of FHTC by means of PCC Concrete Block and others allied works in connection with the Purba Narathali (SM/16537) PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000348/2024-2025 3418/ALD 26/09/2024 60 MADHAB SAHA 57.80 0.00 0 0
6 ALIPURDUAR Kumargram Alipurduar Division PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. , SM/16537 New Land Development, repairing of Pump house, construction of Pathway and protection work of 3rd TW site of Narathali PWSS under Alipurduar Divn, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000334/2023-2024 2520/ALD 24/11/2023 60 SREE MAA CONSTRUCTION 6.99 2.46 35.19 100
7 ALIPURDUAR Kumargram Alipurduar Division PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. , SM/16537 New Repairing of HW site boundary wall (40M), construction of pathway, surface drain, chatal and other misc works related to Narathali PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000338/2023-2024 2524/ALD 24/11/2023 60 TAPAN CHANDA 5.33 2.66 49.91 100
8 ALIPURDUAR Kumargram Alipurduar Division PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. , SM/16537 New Material Requisition To Resource Division RTOR000102/2023-2024 26/ALD 10/01/2024 Resource Division 10.95 0.00 0 0
9 ALIPURDUAR Kumargram Alipurduar Division PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. , SM/16537 New Material Requisition To Resource Division RTOR000005/2023-2024 186/ALD 28/04/2023 Resource Division 246.11 0.00 0 0
10 ALIPURDUAR Kumargram Northern Mechanical Division II PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. , SM/16537 New QUOTATION FOR NEW SERVICE CONNECTION AT PURBA NARTHALI PWSS PH NO-I BILL/00035/2023-2024 BP-2023-24-49 12/05/2023 WBSEDCL 1.21 0.00 0 0
11 ALIPURDUAR Kumargram Northern Mechanical Division II PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. , SM/16537 New QUOTATION FOR NEW SERVICE CONNECTION AT PURBA NARTHALI PWSS PH NO-II BILL/00036/2023-2024 BP-2023-24-48 12/05/2023 WBSEDCL 1.21 0.00 0 0
12 ALIPURDUAR Kumargram Northern Mechanical Division II PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. , SM/16537 New ADDITIONAL QUOTATION FOR PURBA NARARTHALI PH NO-I BILL/00043/2024-2025 BP-04/24-25 08/04/2024 WBSEDCL 2.27 0.00 0 null
13 ALIPURDUAR Kumargram Northern Mechanical Division II PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. , SM/16537 New ADDITIONAL QUOTATION FOR PURBA NARARTHALI PH NO-2 BILL/00045/2024-2025 BP-05/24-25 08/04/2024 WBSEDCL 12.74 0.00 0 null
Total 787.88 270.75 34.36