1 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 |
New |
Tube well Boring by ODEX-165 Method of drilling at HW, FIRST TUBE WELL AND SECOND TUBE WELL site including laying distribution system with new HDPE pipeline (Part-B) CONSTRUCTION OF THREE (3) NOS PUMP HOUSES ,providing FHTC and others allied works for PASCHIM SATALI PWSS Under Alipurduar Division PHE DTE. |
HQ-A.E |
RWS Kalchini Block |
ORD/000432/2022-2023 |
2859/ALD |
17/01/2023 |
180 |
MAHENDRA CHHETRI |
267.57 |
227.68 |
85.09 |
36 |
2 |
ALIPURDUAR |
Kalchini |
Northern Mechanical Division II |
PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 |
New |
New Service connection charge for Paschim Satali PWSS P/H No-I. |
|
|
BILL/00558/2023-2024 |
BP-2023-24-188 |
22/06/2023 |
|
WBSEDCL |
1.36 |
0.00 |
0 |
0 |
3 |
ALIPURDUAR |
Kalchini |
Northern Mechanical Division II |
PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 |
New |
New Service connection charge for Paschim Satali PWSS P/H No-II |
|
|
BILL/00559/2023-2024 |
BP-2023-24-187 |
22/06/2023 |
|
WBSEDCL |
1.36 |
0.00 |
0 |
0 |
4 |
ALIPURDUAR |
Kalchini |
Northern Mechanical Division II |
PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 |
New |
New Service connection charge for Paschim Satali PWSS P/H No-III |
|
|
BILL/00560/2023-2024 |
BP-2023-24-186 |
22/06/2023 |
|
WBSEDCL |
1.36 |
0.00 |
0 |
0 |
5 |
ALIPURDUAR |
Kalchini |
Northern Mechanical Division II |
PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 |
New |
Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Paschim Satali water supply scheme, TW no I, II and III under Jal Jeevan Mission under NMD-II, PHE Dte.APD |
Assistant Engineer,Alipurduar Mechanical Sub-Division,P |
Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, |
ORD/000026/2023-2024 |
944/NMD-II |
11/05/2023 |
30 |
M/S BHOWMIK & CO. |
27.59 |
0.00 |
0 |
55 |
6 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 |
New |
Providing FHTC from existing distribution system as per specification for Paschim Satali PWSS under Alipurduar Division, PHE Dte.
|
HQ-A.E |
RWS Kalchini Block |
ORD/000261/2023-2024 |
1879/ALD |
07/09/2023 |
270 |
SATYABRATA BHATTACHERJEE |
7.02 |
0.00 |
0 |
1 |
7 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 |
New |
Supply of CIDF/CIPE pipes and specials & Sluice Valve for Paschim Satali Water Supply Scheme under Alipurduar Division P.H.E. Dte. |
Alipurduar Sadar Sub Division |
Birpara Sub Division |
ORD/000479/2023-2024 |
697/ALD |
07/03/2024 |
90 |
SSPR VALVE MANUFACTURING PVT LTD |
18.08 |
0.00 |
0 |
80 |
8 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 |
New |
Constructions of 300 Cum OHR as per Departmental Design & drawing including laying distribution system with new HDPE pipeline (Part-A), RISING MAIN, CONSTRUCTION OF THREE(3) NOS OF BOUNDARY WALL, PATHWAY including soil test, providing FHTC and others allied works for PASCHIM SATALI PWSS Under Alipurduar Division PHE DTE |
HQ-A.E |
RWS Kalchini Block |
ORD/000433/2022-2023 |
2860/ALD |
17/01/2023 |
180 |
DILIP MAHATO |
497.97 |
365.27 |
73.35 |
74 |
9 |
ALIPURDUAR |
Kalchini |
Northern Mechanical Division II |
PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 |
New |
Solarization of grid connected pumping installation at Different PWSS at Kalchini Block in the dist.of Alipurduar under JJM programme under Northern Mechanical Division-II, PHE Dte. |
Assistant Engineer,Alipurduar Mechanical Sub-Division,P |
|
ORD/001209/2024-2025 |
823/NMD-II |
06/03/2025 |
30 |
THE BUSINESS ENGINEERS INDIA |
28.94 |
0.00 |
0 |
0 |
10 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 |
New |
Balance portion of boundary wall and Gap joint of new HDPE/DI pipeline, and land development of HW Site,1st and 2nd site of Paschim Satali PWSS (Part) Kalchini Block Alipurduar Division, PHE Dte. |
HQ-A.E |
RWS Kalchini Block |
ORD/000474/2023-2024 |
692/ALD |
07/03/2024 |
90 |
DILIP MAHATO |
61.82 |
0.00 |
0 |
45 |