Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 884.13 615.8 69.65  
1 ALIPURDUAR Kalchini Alipurduar Division PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 New Tube well Boring by ODEX-165 Method of drilling at HW, FIRST TUBE WELL AND SECOND TUBE WELL site including laying distribution system with new HDPE pipeline (Part-B) CONSTRUCTION OF THREE (3) NOS PUMP HOUSES ,providing FHTC and others allied works for PASCHIM SATALI PWSS Under Alipurduar Division PHE DTE. HQ-A.E ORD/000432/2022-2023 2859/ALD 17/01/2023 180 MAHENDRA CHHETRI 267.57 227.68 85.09 36
2 ALIPURDUAR Kalchini Alipurduar Division PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 New Constructions of 300 Cum OHR as per Departmental Design & drawing including laying distribution system with new HDPE pipeline (Part-A), RISING MAIN, CONSTRUCTION OF THREE(3) NOS OF BOUNDARY WALL, PATHWAY including soil test, providing FHTC and others allied works for PASCHIM SATALI PWSS Under Alipurduar Division PHE DTE HQ-A.E RWS Kalchini Block ORD/000433/2022-2023 2860/ALD 17/01/2023 180 DILIP MAHATO 497.97 365.27 73.35 74
3 ALIPURDUAR Kalchini Northern Mechanical Division II PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Paschim Satali water supply scheme, TW no I, II and III under Jal Jeevan Mission under NMD-II, PHE Dte.APD Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000026/2023-2024 944/NMD-II 11/05/2023 30 M/S BHOWMIK & CO. 27.59 13.52 49 55
4 ALIPURDUAR Kalchini Alipurduar Division PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 New Providing FHTC from existing distribution system as per specification for Paschim Satali PWSS under Alipurduar Division, PHE Dte. HQ-A.E RWS Kalchini Block ORD/000261/2023-2024 1879/ALD 07/09/2023 270 SATYABRATA BHATTACHERJEE 7.02 0.00 0 1
5 ALIPURDUAR Kalchini Alipurduar Division PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 New Balance portion of boundary wall and Gap joint of new HDPE/DI pipeline, and land development of HW Site,1st and 2nd site of Paschim Satali PWSS (Part) Kalchini Block Alipurduar Division, PHE Dte. HQ-A.E RWS Kalchini Block ORD/000474/2023-2024 692/ALD 07/03/2024 90 DILIP MAHATO 61.82 0.00 0 45
6 ALIPURDUAR Kalchini Alipurduar Division PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 New Supply of CIDF/CIPE pipes and specials & Sluice Valve for Paschim Satali Water Supply Scheme under Alipurduar Division P.H.E. Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000479/2023-2024 697/ALD 07/03/2024 90 SSPR VALVE MANUFACTURING PVT LTD 18.08 9.33 51.6 80
7 ALIPURDUAR Kalchini Northern Mechanical Division II PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 New New Service connection charge for Paschim Satali PWSS P/H No-I. BILL/00558/2023-2024 BP-2023-24-188 22/06/2023 WBSEDCL 1.36 0.00 0 0
8 ALIPURDUAR Kalchini Northern Mechanical Division II PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 New New Service connection charge for Paschim Satali PWSS P/H No-II BILL/00559/2023-2024 BP-2023-24-187 22/06/2023 WBSEDCL 1.36 0.00 0 0
9 ALIPURDUAR Kalchini Northern Mechanical Division II PASCHIM SATALI PIPED WATER SUPPLY SCHEME , SM/13245 New New Service connection charge for Paschim Satali PWSS P/H No-III BILL/00560/2023-2024 BP-2023-24-186 22/06/2023 WBSEDCL 1.36 0.00 0 0
Total 884.13 615.79 69.65