Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 553.17 19.01 3.44  
1 ALIPURDUAR Kalchini Alipurduar Division RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14213 New Providing FHTC from existing distribution system as per specification for Rangamati TG PWSS under Alipurduar Division, PHE Dte. HQ-A.E RWS Kalchini Block ORD/000262/2023-2024 1880/ALD 07/09/2023 30 ASHOK PRADHAN 9.49 0.00 0 0
2 ALIPURDUAR Kalchini Alipurduar Division RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14213 New Material Requisition To Resource Division RTOR000080/2023-2024 104/ALD 10/01/2024 Resource Division 9.73 0.00 0 0
3 ALIPURDUAR Kalchini Northern Mechanical Division II RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14213 New New Service connection for Rangamati TG PWSS, Zone-I, P/H-I BILL/02404/2023-2024 BP-2023-24-526 11/01/2024 WBSEDCL 6.39 0.00 0 0
4 ALIPURDUAR Kalchini Northern Mechanical Division II RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14213 New New Service Connection for Rangamati TG PWSS, Zone-I, P/H-II BILL/02405/2023-2024 BP-2023-24-525 11/01/2024 WBSEDCL 5.22 0.00 0 0
5 ALIPURDUAR Kalchini Northern Mechanical Division II RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14213 New New Service Connection for Rangamati PWSS, Zone-II, P/H no.-I BILL/02406/2023-2024 BP-2023-24-524 11/01/2024 WBSEDCL 5.58 0.00 0 0
6 ALIPURDUAR Kalchini Northern Mechanical Division II RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14213 New New Service Connection for Rangamati TG PWSS, Zone-II, P/H no.-II BILL/02407/2023-2024 BP-2023-24-527 11/01/2024 WBSEDCL 6.97 0.00 0 0
7 ALIPURDUAR Kalchini Northern Mechanical Division II RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14213 New New Service Connection for Rangamati TG PWSS, Zone-II, P/H no.-II BILL/02407/2023-2024 BP-2023-24-527 11/01/2024 WBSEDCL 6.97 0.00 0 0
8 ALIPURDUAR Kalchini Alipurduar Division RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14213 New Hydro-Geologica! investigation aboutWater evaluation, availability and quality parameterfor both ground and surface sources at Lankapara and Gentral Dooars Tea Estate within Alipuduar district. BILL/00683/2023-2024 429/23-24/PFMS 28/03/2024 IIT CONSULTATIVE PRACTICE 2.36 0.00 0 0
9 ALIPURDUAR Kalchini Alipurduar Division RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14213 New Supply of DIDF pipes and specials and Sluice Valve for Rangamati TG Water Supply Scheme (SM/14213) of Kalchini Block under Alipurduar Division P.H.E. Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000520/2023-2024 839/ALD 14/03/2024 90 SSPR VALVE MANUFACTURING PVT LTD 16.24 3.69 22.72 15
10 ALIPURDUAR Kalchini Northern Mechanical Division II RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14213 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Rangamati TG water supply scheme, TW no I and II of Zone-I and TW no I and II of Zone-II under Jal Jeevan Mission under NMD-II, PHE Dte.APD Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/001137/2023-2024 2933/NMD-II 07/11/2023 30 S.P ENTERPRISE (SLG) 44.02 15.32 34.8 40
11 ALIPURDUAR Kalchini Alipurduar Division RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14213 New Constructions of 2(TWO) NOS 150 Cum OHR as per Departmental Design & drawing including laying distribution system with new HDPE pipeline, RISING MAIN, Construction of BOUNDARY WALL, 4(FOUR) NOS ODEX-165 TUBE WELL, 4(FOUR) NOS PUMP HOUSE, Soil Investigation work, providing FHTC and others allied works for RANGAMATI TEA GAEDEN PWSS(ZONE-I+ZONE-II), Alipurduar Division, PHE DTE. HQ-A.E RWS Kalchini Block ORD/000182/2023-2024 1171/ALD 03/08/2023 180 M/S RADHASWAMI ENTERPRISE 440.20 0.00 0 35
Total 553.16 19.01 3.44