Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 373.05 77.23 20.7  
1 ALIPURDUAR Madarihat Alipurduar Division DAKSHIN RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14217 New Material Requisition To Resource Division RTOR000045/2022-2023 3487ALD 23/03/2023 Resource Division 4.89 0.00 0 0
2 ALIPURDUAR Madarihat Alipurduar Division DAKSHIN RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14217 New Cons. of Rig bored TW(2nos) by ODEX-165 method of drilling at HW and 2nd site, cons of 100 cum OHR at HW including soil testing, cons. of P/H and B/W at HW,2nd site, Laying of rising main, distribution line and providing FHTC as per Departmental Design & drawing for Dakshin Rangalibazna PWSS under Birpara Sub-Division, Alipurduar Division, PHE DTE. Birpara A.E Birpara Sub Division ORD/000509/2022-2023 3396/ALD 16/03/2023 180 S.G. CONSTRUCTION 247.26 77.23 31.23 32
3 ALIPURDUAR Madarihat Northern Mechanical Division II DAKSHIN RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14217 New Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Dakhshin Rangalibazna Water Supply Scheme TW No.-I and II under NMD-II,PHE.Dte,Apd. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000886/2023-2024 2464/NMD-II 11/08/2023 30 S.D CONCERN WORKSHOP 20.48 0.00 0 0
4 ALIPURDUAR Madarihat Alipurduar Division DAKSHIN RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14217 New Providing FHTC from existing distribution system as per specification for Dakshin Rangalibazna PWSS under Alipurduar Division, PHE Dte. Birpara A.E Birpara Sub Division ORD/000303/2023-2024 2134/ALD 03/10/2023 30 MANI PRADHAN 3.25 0.00 0 0
5 ALIPURDUAR Madarihat Northern Mechanical Division II DAKSHIN RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14217 New NEW CONNECTION SERVICE FOR DAKSHIN RANGALIBAZNA PWSS P/H NO I APPLICATION NO 4003065178 BILL/01798/2023-2024 BP-2023-24-382 27/09/2023 WBSEDCL 11.71 0.00 0 0
6 ALIPURDUAR Madarihat Northern Mechanical Division II DAKSHIN RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14217 New NEW CONNECTION SERVICE FOR DAKSHIN RANGALIBAZNA PWSS P/H NO II APPLICATION NO 4003065179 BILL/01802/2023-2024 BP-2023-24-381 27/09/2023 WBSEDCL 11.63 0.00 0 0
7 ALIPURDUAR Madarihat Alipurduar Division DAKSHIN RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14217 New Material Requisition To Resource Division RTOR000056/2023-2024 2702 12/12/2023 Resource Division 68.94 0.00 0 0
8 ALIPURDUAR Madarihat Alipurduar Division DAKSHIN RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14217 New Material Requisition To Resource Division RTOR000088/2023-2024 112/ALD 10/01/2024 Resource Division 4.89 0.00 0 0
Total 373.05 77.23 20.7