1 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Construction of 200cum OHR as per departmental design and drawing, providing FHTC for 28 and 29 mile Busty PWSS under Alipurduar Division, PHE Dte. |
HQ-A.E |
Alipurduar Sub Division |
ORD/000002/2023-2024 |
05/ALD |
04/04/2023 |
180 |
A B TECHNO ENTERPRISE |
91.25 |
0.00 |
0 |
0 |
2 |
ALIPURDUAR |
Kalchini |
Northern Mechanical Division II |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Rejuvention of 28 AND 29 MILE BASTI Water Supply Scheme TW No.- I and II under NMD-II,PHE.Dte,Apd. |
Assistant Engineer,Alipurduar Mechanical Sub-Division,P |
Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, |
ORD/000939/2023-2024 |
2543/NMD-II |
16/08/2023 |
30 |
DILIP MAHATO |
22.96 |
0.00 |
0 |
0 |
3 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Providing balance FHTC from existing distribution system as per specification for 28 and 29 MILE BASTY PWSS under Alipurduar Division, PHE Dte. |
HQ-A.E |
|
ORD/000294/2023-2024 |
2103/ALD |
29/09/2023 |
60 |
EVEREST INFRATECH INC |
47.79 |
0.00 |
0 |
0 |
4 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Material Requisition To Resource Division |
|
|
RTOR000073/2023-2024 |
98/ALD |
10/01/2024 |
|
Resource Division |
10.79 |
0.00 |
0 |
0 |
5 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Arrangement for online application in Paribesh Portal for getting Forest permission at 7nos BOPs under Alipurduar Division P.H.E Dte. |
HQ-A.E |
Alipurduar Sub Division |
ORD/000458/2023-2024 |
496/ALD |
16/02/2024 |
30 |
HILL GROUND CONSULTANCY |
1.83 |
0.00 |
0 |
100 |
6 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Laying distribution system with new UPVC pipeline, Construction of 2 Nos Pump House ,Pipe Support Structure, Land Development, Boundary Wall, Path way, Providing FHTC, and other allied works for Gram Busty Area Under 28 & 29 Mile Basty (Zone-IV) PIPED WATER SUPPLY SCHEME under Alipurduar Division, PHE Dte. |
HQ-A.E |
Alipurduar Sub Division |
ORD/000357/2023-2024 |
2608/ALD |
04/12/2023 |
270 |
HITANGSHU CHOUDHURY |
70.82 |
0.00 |
0 |
45 |
7 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Conceptualization, design and implementing mass awareness generation through Wall writing at 113 nos. villages (Block - Falakata, Kalchini, Madarihat) by dissemination of awareness generation IEC messages FHTC, Provision on legal provision damage or illegal connection of PWSS; safe handling & storage of safe water Quality issues, water conservation and WASH related issues as per guideline of JJM at Alipurduar district under Alipurduar Division, PHE Dte, Govt. of West Bengal.(SM/16506) |
Birpara A.E |
JUNIOR ENGINEER |
ORD/000495/2023-2024 |
751/ALD |
12/03/2024 |
130 |
LIMRA SOCIAL WELFARE SOCIETY |
27.08 |
0.00 |
0 |
100 |
8 |
ALIPURDUAR |
Kalchini |
Northern Mechanical Division II |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
New Service Connection Charges For Rejuvination of 28 & 29 Mile Basti PWSS PH NO-1 |
|
|
BILL/00524/2024-2025 |
BP-119/24-25 |
24/05/2024 |
|
WBSEDCL |
3.90 |
0.00 |
0 |
null |
9 |
ALIPURDUAR |
Kalchini |
Northern Mechanical Division II |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
New Service Connection Charges for REJUVINATION OF 28 & 29 Mile Basti PH NO-2 |
|
|
BILL/00523/2024-2025 |
BP-120/24-25 |
24/05/2024 |
|
WBSEDCL |
8.22 |
0.00 |
0 |
null |
10 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Construction of 2nos Tw boring by ODEX-165 method of drilling including distribution system with new UPVC pipeline, 2 nos Pump house, Boundary wall, pathway, providing FHTC and other allied works for 28 and 29 mile busty PWSS under Alipurduar Division, PHE Dte. |
HQ-A.E |
Alipurduar Sub Division |
ORD/000558/2022-2023 |
3502/ALD |
23/03/2023 |
600 |
HITANGSHU CHOUDHURY |
76.18 |
12.04 |
15.8 |
75 |
11 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
payment against proposal No : FP/WB/Others/443310/2023for boundary demarcation and construction of boundary pillar for diversion of forest land of area 0.0464 ha for 28 and 29 mile basty PWSS ( Z-IV) Garam basty under JJM at garam basty forest Village under BTR ( West) Division under WDPO Range . |
|
|
BILL/00182/2024-2025 |
144/24-25/PFMS |
08/08/2024 |
|
EXECUTIVE ENGINEER, ALIPURDUAR DIVISION |
0.94 |
0.00 |
0 |
null |
12 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Payment for NPV for diversion of forest land of 0.0464 ha area against proposal No : FP/WB/Others/443310/2023 for water supply scheme 28 and 29 Mile Basty PWSS ( Z-VI) Garam Basty under JJM Garam Basty Forest Village under BTR(West ) Division under WDPO Range under DPO_9 Compartment |
|
|
BILL/00183/2024-2025 |
145/24-25/PFMS |
08/08/2024 |
|
EXECUTIVE ENGINEER, ALIPURDUAR DIVISION |
5.18 |
0.00 |
0 |
null |
13 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
payment for NPV Demand Note against In-principal (Stage-l) approval of Central Government under Section 2
(1) (ii) of the Van (Sanrakshan Evam Samvardhan) Adhiniyam-1980 for non-forestry use of 0.1458
ha. of forest land in favour of West Bengal Public Health Engineering Directorate for Gravity Based
Water Supply Scheme (GBWSS) under Jal Jeevan Mission (JJM) 28 & 29 Mile Basty PWSS under
Buxa Tiger Reserve (East) Forest Division. (Proposal No. FPWBIOTHERSI442029/2023). |
|
|
BILL/00188/2024-2025 |
147/24-25/PFMS |
08/08/2024 |
|
EXECUTIVE ENGINEER, ALIPURDUAR DIVISION |
15.59 |
0.00 |
0 |
null |
14 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Cost of raising and maintenance of the Compensatory Afforestation demand note against In-principal (Stage-l) approval of Central Government under Section 2 (1) (ü) of the Van (Sanrakshan Evam Samvardhan) Adhiniyam-1980 for
Directorate
non-forestry use of 0.1458 ha. of forest land in favour of West Bengal Public Health Engineering for Gravity Based Water Supply Scheme (GBWSS) under Jal Jeevan Mission (JJM) 28 & 29 Mile Basty PWSS under Buxa Tiger Reserve (East) Forest Division. (Proposal No. FPWBIOTHERS/442029/2023 |
|
|
BILL/00189/2024-2025 |
148/24-25/PFMS |
08/08/2024 |
|
EXECUTIVE ENGINEER, ALIPURDUAR DIVISION |
2.13 |
0.00 |
0 |
null |
15 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Cost of raising and maintenance of the compensatory afforestation ( 100 trees plantation and mtc for 10 years ) against proposed diversion of forest land for 28 and 29 mile basty PWSS (Z-IV) Garam Basty under JJM against Proposal No : FP/WB/Others/443310/2023 |
|
|
BILL/00184/2024-2025 |
146/24-25/PFMS |
08/08/2024 |
|
EXECUTIVE ENGINEER, ALIPURDUAR DIVISION |
2.13 |
0.00 |
0 |
null |
16 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Payment against proposal no . FP/ WB/ Others/ 442029/2023- for erection of Boundary pillar at diverted site against In - principal ( stage - I ) approval of water supply scheme for Buxa Forest PWSS uder Jal Jeevan Mission at 28 & 29 Mile Basty , Buxa tiger Reserve ( East) Division - reg |
|
|
BILL/00339/2024-2025 |
null |
18/09/2024 |
|
EXECUTIVE ENGINEER, ALIPURDUAR DIVISION |
0.21 |
0.00 |
0 |
null |
17 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Hiring of additional Diesel Vehicle Maxi Cab (At least 7 seater) for Assistant Engineer, Head Quarter, Alipurduar Division, P.H.E. Dte. |
HQ-A.E |
RWS Kumargram Block |
ORD/000391/2024-2025 |
3883/ALD |
22/11/2024 |
365 |
SOUVIK ROY PALADHI |
4.80 |
0.00 |
0 |
0 |
18 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Material Requisition To Resource Division |
|
|
RTOR000035/2024-2025 |
4251/ALD |
13/12/2024 |
|
Resource Division |
31.69 |
0.00 |
0 |
0 |
19 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Payment against proposal no . FP/ WB/ Others/ 442029/2023- for erection of Boundary pillar at diverted site against In - principal ( stage - I ) approval of water supply scheme for Buxa Forest PWSS uder Jal Jeevan Mission at 28 & 29 Mile Basty , Buxa tiger Reserve ( East) Division - reg |
|
|
BILL/00506/2024-2025 |
329/24-25/PFMS |
19/12/2024 |
|
EXECUTIVE ENGINEER, ALIPURDUAR DIVISION |
0.31 |
0.00 |
0 |
0 |
20 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Cons. of 100 cum OHR,BOUNDARY WALL, PUMP HOUSE, TUBE, RISING MAIN FOR Mouza-MUJNAI TEA GARDEN(JL NO.39,RL Plot No.121,129 &155) 410 unit CHA SUNDARI WATER SUPPLY SCHEME UNDER ALIPURDUAR DIVISION, PHE DTE. of North Bengal Circle-I, PHE Dte. |
Birpara A.E |
Alipurduar Sub Division,Birpara Sub Division |
ORD/000455/2023-2024 |
436/ALD |
07/02/2024 |
360 |
MITHUN DAS |
108.05 |
0.00 |
0 |
80 |
21 |
ALIPURDUAR |
Kalchini |
Northern Mechanical Division II |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Solarization of grid connected pumping installation at Different PWSS at Kalchini Block in the dist.of Alipurduar under JJM programme under Northern Mechanical Division-II, PHE Dte. |
Assistant Engineer,Alipurduar Mechanical Sub-Division,P |
|
ORD/001209/2024-2025 |
823/NMD-II |
06/03/2025 |
30 |
THE BUSINESS ENGINEERS INDIA |
28.94 |
0.00 |
0 |
0 |
22 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Supplying and Laying of Water supply line (using HDD/micro tunneling machine) for supply of drinking water in different areas of Alipurduar district under Alipurduar Division PHE Dte. |
HQ-A.E |
RWS Kumargram Block |
ORD/000464/2024-2025 |
5287/ALD |
07/03/2025 |
120 |
APEX ENGINEERING |
74.36 |
0.00 |
0 |
0 |
23 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Hiring of Diesel Vehicle Maxi Cab (At least 7 seater ) for Executive Engineer, Alipurduar Division, P.H.E. Dte.(from 01.01.2024 to 31.12.2024) |
Alipurduar Sadar Sub Division,HQ-A.E |
Birpara Sub Division |
ORD/000461/2023-2024 |
160/ALD |
11/01/2024 |
365 |
APSARI BHOWMICK |
4.80 |
0.00 |
0 |
0 |
24 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Continuation of work of Hiring of Diesel Vehicle Maxi Cab(At least 7 seater ) for Assistant Engineer, Head Quarter, Alipurduar Division, P.H.E. Dte.(from 01.01.2025 to 31.03.2025) |
HQ-A.E |
RWS Kumargram Block |
ORD/000458/2024-2025 |
4553/ALD |
30/12/2024 |
90 |
DIPAK DAS |
1.20 |
0.00 |
0 |
0 |
25 |
ALIPURDUAR |
Kalchini |
Alipurduar Division |
28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 |
New |
Continuation of work of Hiring of Diesel Vehicle Maxi Cab (At least 7 seater ) for Executive Engineer, Alipurduar Division, P.H.E. Dte.(from 01.01.2025 to 31.03.2025) |
HQ-A.E |
RWS Kumargram Block |
ORD/000457/2024-2025 |
4552/ALD |
30/12/2024 |
90 |
APSARI BHOWMICK |
1.20 |
0.00 |
0 |
0 |