Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
19 504.96 35.07 6.95  
1 ALIPURDUAR Kalchini Alipurduar Division 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New Construction of 200cum OHR as per departmental design and drawing, providing FHTC for 28 and 29 mile Busty PWSS under Alipurduar Division, PHE Dte. HQ-A.E Alipurduar Sub Division ORD/000002/2023-2024 05/ALD 04/04/2023 180 A B TECHNO ENTERPRISE 91.25 0.00 0 0
2 ALIPURDUAR Kalchini Alipurduar Division 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New Construction of 2nos Tw boring by ODEX-165 method of drilling including distribution system with new UPVC pipeline, 2 nos Pump house, Boundary wall, pathway, providing FHTC and other allied works for 28 and 29 mile busty PWSS under Alipurduar Division, PHE Dte. HQ-A.E Alipurduar Sub Division ORD/000558/2022-2023 3502/ALD 23/03/2023 480 HITANGSHU CHOUDHURY 76.18 14.62 19.19 75
3 ALIPURDUAR Kalchini Northern Mechanical Division II 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Rejuvention of 28 AND 29 MILE BASTI Water Supply Scheme TW No.- I and II under NMD-II,PHE.Dte,Apd. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000939/2023-2024 2543/NMD-II 16/08/2023 30 DILIP MAHATO 22.96 0.00 0 0
4 ALIPURDUAR Kalchini Alipurduar Division 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New Providing balance FHTC from existing distribution system as per specification for 28 and 29 MILE BASTY PWSS under Alipurduar Division, PHE Dte. HQ-A.E ORD/000294/2023-2024 2103/ALD 29/09/2023 60 EVEREST INFRATECH INC 47.79 0.00 0 0
5 ALIPURDUAR Kalchini Alipurduar Division 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New Laying distribution system with new UPVC pipeline, Construction of 2 Nos Pump House ,Pipe Support Structure, Land Development, Boundary Wall, Path way, Providing FHTC, and other allied works for Gram Busty Area Under 28 & 29 Mile Basty (Zone-IV) PIPED WATER SUPPLY SCHEME under Alipurduar Division, PHE Dte. HQ-A.E Alipurduar Sub Division ORD/000357/2023-2024 2608/ALD 04/12/2023 270 HITANGSHU CHOUDHURY 70.82 7.12 10.05 45
6 ALIPURDUAR Kalchini Alipurduar Division 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New Cons. of 100 cum OHR,BOUNDARY WALL, PUMP HOUSE, TUBE, RISING MAIN FOR Mouza-MUJNAI TEA GARDEN(JL NO.39,RL Plot No.121,129 &155) 410 unit CHA SUNDARI WATER SUPPLY SCHEME UNDER ALIPURDUAR DIVISION, PHE DTE. of North Bengal Circle-I, PHE Dte. Birpara A.E Alipurduar Sub Division,Birpara Sub Division ORD/000455/2023-2024 436/ALD 07/02/2024 300 MITHUN DAS 108.05 0.00 0 62
7 ALIPURDUAR Kalchini Alipurduar Division 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New Hiring of Diesel Vehicle Maxi Cab (At least 7 seater ) for Executive Engineer, Alipurduar Division, P.H.E. Dte.(from 01.01.2024 to 31.12.2024) HQ-A.E ORD/000461/2023-2024 160/ALD 11/01/2024 365 APSARI BHOWMICK 4.80 0.00 0 0
8 ALIPURDUAR Kalchini Alipurduar Division 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New Arrangement for online application in Paribesh Portal for getting Forest permission at 7nos BOPs under Alipurduar Division P.H.E Dte. HQ-A.E Alipurduar Sub Division ORD/000458/2023-2024 496/ALD 16/02/2024 30 HILL GROUND CONSULTANCY 1.83 0.00 0 100
9 ALIPURDUAR Kalchini Alipurduar Division 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New Hiring of additional Diesel Vehicle Maxi Cab (At least 7 seater) for Assistant Engineer, Head Quarter, Alipurduar Division, P.H.E. Dte. HQ-A.E RWS Kumargram Block ORD/000391/2024-2025 3883/ALD 22/11/2024 365 SOUVIK ROY PALADHI 4.80 0.00 0 0
10 ALIPURDUAR Kalchini Alipurduar Division 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New Conceptualization, design and implementing mass awareness generation through Wall writing at 113 nos. villages (Block - Falakata, Kalchini, Madarihat) by dissemination of awareness generation IEC messages FHTC, Provision on legal provision damage or illegal connection of PWSS; safe handling & storage of safe water Quality issues, water conservation and WASH related issues as per guideline of JJM at Alipurduar district under Alipurduar Division, PHE Dte, Govt. of West Bengal.(SM/16506) Birpara A.E JUNIOR ENGINEER ORD/000495/2023-2024 751/ALD 12/03/2024 130 LIMRA SOCIAL WELFARE SOCIETY 27.08 13.33 49.22 100
11 ALIPURDUAR Kalchini Alipurduar Division 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New Material Requisition To Resource Division RTOR000073/2023-2024 98/ALD 10/01/2024 Resource Division 10.79 0.00 0 0
12 ALIPURDUAR Kalchini Northern Mechanical Division II 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New New Service Connection Charges for REJUVINATION OF 28 & 29 Mile Basti PH NO-2 BILL/00523/2024-2025 BP-120/24-25 24/05/2024 WBSEDCL 8.22 0.00 0 null
13 ALIPURDUAR Kalchini Northern Mechanical Division II 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New New Service Connection Charges For Rejuvination of 28 & 29 Mile Basti PWSS PH NO-1 BILL/00524/2024-2025 BP-119/24-25 24/05/2024 WBSEDCL 3.90 0.00 0 null
14 ALIPURDUAR Kalchini Alipurduar Division 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New payment against proposal No : FP/WB/Others/443310/2023for boundary demarcation and construction of boundary pillar for diversion of forest land of area 0.0464 ha for 28 and 29 mile basty PWSS ( Z-IV) Garam basty under JJM at garam basty forest Village under BTR ( West) Division under WDPO Range . BILL/00182/2024-2025 144/24-25/PFMS 08/08/2024 EXECUTIVE ENGINEER, ALIPURDUAR DIVISION 0.94 0.00 0 null
15 ALIPURDUAR Kalchini Alipurduar Division 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New Payment for NPV for diversion of forest land of 0.0464 ha area against proposal No : FP/WB/Others/443310/2023 for water supply scheme 28 and 29 Mile Basty PWSS ( Z-VI) Garam Basty under JJM Garam Basty Forest Village under BTR(West ) Division under WDPO Range under DPO_9 Compartment BILL/00183/2024-2025 145/24-25/PFMS 08/08/2024 EXECUTIVE ENGINEER, ALIPURDUAR DIVISION 5.18 0.00 0 null
16 ALIPURDUAR Kalchini Alipurduar Division 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New Cost of raising and maintenance of the Compensatory Afforestation demand note against In-principal (Stage-l) approval of Central Government under Section 2 (1) (ü) of the Van (Sanrakshan Evam Samvardhan) Adhiniyam-1980 for Directorate non-forestry use of 0.1458 ha. of forest land in favour of West Bengal Public Health Engineering for Gravity Based Water Supply Scheme (GBWSS) under Jal Jeevan Mission (JJM) 28 & 29 Mile Basty PWSS under Buxa Tiger Reserve (East) Forest Division. (Proposal No. FPWBIOTHERS/442029/2023 BILL/00189/2024-2025 148/24-25/PFMS 08/08/2024 EXECUTIVE ENGINEER, ALIPURDUAR DIVISION 2.13 0.00 0 null
17 ALIPURDUAR Kalchini Alipurduar Division 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New Payment against proposal no . FP/ WB/ Others/ 442029/2023- for erection of Boundary pillar at diverted site against In - principal ( stage - I ) approval of water supply scheme for Buxa Forest PWSS uder Jal Jeevan Mission at 28 & 29 Mile Basty , Buxa tiger Reserve ( East) Division - reg BILL/00339/2024-2025 null 18/09/2024 EXECUTIVE ENGINEER, ALIPURDUAR DIVISION 0.52 0.00 0 null
18 ALIPURDUAR Kalchini Alipurduar Division 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New Cost of raising and maintenance of the compensatory afforestation ( 100 trees plantation and mtc for 10 years ) against proposed diversion of forest land for 28 and 29 mile basty PWSS (Z-IV) Garam Basty under JJM against Proposal No : FP/WB/Others/443310/2023 BILL/00184/2024-2025 146/24-25/PFMS 08/08/2024 EXECUTIVE ENGINEER, ALIPURDUAR DIVISION 2.13 0.00 0 null
19 ALIPURDUAR Kalchini Alipurduar Division 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME , SM/16506 New payment for NPV Demand Note against In-principal (Stage-l) approval of Central Government under Section 2 (1) (ii) of the Van (Sanrakshan Evam Samvardhan) Adhiniyam-1980 for non-forestry use of 0.1458 ha. of forest land in favour of West Bengal Public Health Engineering Directorate for Gravity Based Water Supply Scheme (GBWSS) under Jal Jeevan Mission (JJM) 28 & 29 Mile Basty PWSS under Buxa Tiger Reserve (East) Forest Division. (Proposal No. FPWBIOTHERSI442029/2023). BILL/00188/2024-2025 147/24-25/PFMS 08/08/2024 EXECUTIVE ENGINEER, ALIPURDUAR DIVISION 15.59 0.00 0 null
Total 504.97 35.06 6.94