Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 171.59 48.37 28.19  
1 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME , SM/10316 Augmentation Quotation for new service connection at Salkumarhat TW No-III, Application No- 4002994687 BILL/00001/2022-2023 null 21/11/2022 WBSEDCL 1.42 0.00 0 0
2 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME , SM/10316 Augmentation Quotation for new service connection at SALKUMAR HAT, P/H no. III, Application no. 4002994687 VCH/001470/2022-2023 BP-93/22-23 22/11/2022 WBSEDCL 1.42 0.00 0 0
3 ALIPURDUAR Alipurduar Division AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME , SM/10316 Augmentation Construction of Pump House, Boundary Wall, Tube well Boring by Reverse Rotary Method of drilling including Rising Main at 4th site for SALKUMARHAT PWSS Under Alipurduar Division PHE DTE Alipurduar Sadar Sub Division Birpara Sub Division ORD/000067/2022-2023 339/ALD 02/05/2022 90 SHYAMAL ROY 24.17 9.70 40.13 10
4 ALIPURDUAR Alipurduar Division AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME , SM/10316 Augmentation Extension and replacement of damaged pipeline and providing FHTC at surrounding area of Salkumarhat PWSS, Alipurduar-I Block under Alipurduar Division, PHE Dte. Alipurduar RWS Birpara Sub Division ORD/000479/2021-2022 2898/ALD 08/03/2022 60 DILIP MAHATO 48.52 0.00 0 54
5 ALIPURDUAR Alipurduar Division AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME , SM/10316 Augmentation Repairing & renovation of Pump House, Pathway, Boundary wall (2nd site) & laying DI Pipe line at Salkumarhat WSS under Alipurduar Division PHE Dte. Birpara A.E Birpara Sub Division ORD/000099/2021-2022 898/ALD 03/09/2021 45 TAPASH DAS 4.82 0.00 0 62
6 ALIPURDUAR Alipurduar Division AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME , SM/10316 Augmentation Laying Distribution line of UPVC & Di Pipe , with providing FHTC Connection for the Salkumarhat Water Supply Scheme Under Alipurduar Division PHE DTE (PART-A) Alipurduar RWS Birpara Sub Division ORD/000131/2021-2022 1242/ALD 27/09/2021 60 KAMALESH ROY 25.25 4.65 18.42 9
7 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME , SM/10316 Augmentation NEW SERVICE CONNECTION CHARGE FOR MUNSHIPARA P/H NO.III BILL/00681/2023-2024 null 06/06/2023 WBSEDCL 1.00 0.00 0 0
8 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME , SM/10316 Augmentation NEW SERVICE CONNECTION CHARGE FOR SALKUMARHAT P/H NO.IV BILL/00680/2023-2024 BP-2023-24-194 22/06/2023 WBSEDCL 1.48 0.00 0 0
9 ALIPURDUAR Alipurduar Division AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME , SM/10316 Augmentation Construction of Pump House, Boundary Wall, Tube well Boring by Reverse Rotary Method of drilling including Rising Main at 3rd site for SALKUMARHAT PWSS Under Alipurduar Division PHE DTE. Alipurduar RWS Birpara Sub Division ORD/000066/2022-2023 338/ALD 02/05/2022 90 SUBRATA DAS 24.16 22.94 94.95 8
10 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME , SM/10316 Augmentation Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Augmentation of Salkumarhat Water Supply Scheme TW No.-I and II under NMD-II,PHE.Dte,Apd. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000728/2023-2024 2299/NMD-II 31/07/2023 30 MADHAB SAHA 20.89 9.75 46.67 80
11 ALIPURDUAR Alipurduar Division AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME , SM/10316 Augmentation Cons. Of Rising line, pathway, surface drain, laying of DI and UPVC pipeline and restoration of FHTC at Salkumarhat PWSS under Alipurduar Division, PHE Dte. Alipurduar RWS Birpara Sub Division,JUNIOR ENGINEER ORD/000222/2023-2024 1582/ALD 24/08/2023 90 TAPASH DAS 18.46 1.33 7.2 5
Total 171.59 48.38 28.19