Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 665.8 254.42 38.21  
1 ALIPURDUAR Madarihat Alipurduar Division SISHA JUMRHA PIPED WATER SUPPLY SCHEME , SM/12753 New 3 nos. of Tube well Boring by ODEX-165 Method of drilling at HW site, 2nd TW and 3rd site site and Constructions of 350 Cum OHR at HW site inclu. soil testing , construction of pump house and boundary wall at H/W, 2nd site and 3rd site, laying of rising main, distribution line and providing FHTC as per Departmental Design & drawing for SISHA JUMRHA PWSS Under Birpara Subdivision, Alipurduar Division PHE DTE. Birpara A.E Birpara Sub Division ORD/000555/2022-2023 3576/ALD 27/03/2023 180 DILIP MAHATO 539.73 240.91 44.64 23
2 ALIPURDUAR Madarihat Northern Mechanical Division II SISHA JUMRHA PIPED WATER SUPPLY SCHEME , SM/12753 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for SISHU JUMRHA water supply scheme, TW no I , II and III under Jal Jeevan Mission under NMD-II, PHE Dte.APD Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000787/2023-2024 2357/NMD-II 07/08/2023 30 GEETA CONSTRUCTION 27.96 12.97 46.39 100
3 ALIPURDUAR Madarihat Alipurduar Division SISHA JUMRHA PIPED WATER SUPPLY SCHEME , SM/12753 New Construction of boulder apron for Dimdima PWSS in sishujhumra mouza for protection of existing HW site under Alipurduar Division. Birpara A.E Birpara Sub Division ORD/000487/2023-2024 743/ALD 12/03/2024 135 SUBIR GHOSH 4.03 0.54 13.4 10
4 ALIPURDUAR Madarihat Alipurduar Division SISHA JUMRHA PIPED WATER SUPPLY SCHEME , SM/12753 New Material Requisition To Resource Division RTOR000030/2023-2024 1275/ALD 11/08/2023 Resource Division 54.68 0.00 0 0
5 ALIPURDUAR Madarihat Alipurduar Division SISHA JUMRHA PIPED WATER SUPPLY SCHEME , SM/12753 New Material Requisition To Resource Division RTOR000089/2023-2024 113/ALD 10/01/2024 Resource Division 16.53 0.00 0 0
6 ALIPURDUAR Madarihat Northern Mechanical Division II SISHA JUMRHA PIPED WATER SUPPLY SCHEME , SM/12753 New NEW SERVICE CONNECTION FOR SISHUJHUMRA PWSS,P/H NO II,BIRPARA,ALIPURDUAR, APPLICATION NO 4003068181 BILL/01784/2023-2024 BP-2023-24-365 27/09/2023 WBSEDCL 9.33 0.00 0 0
7 ALIPURDUAR Madarihat Northern Mechanical Division II SISHA JUMRHA PIPED WATER SUPPLY SCHEME , SM/12753 New NEW SERVICE CONNECTION FOR SISHUJHUMRA PWSS,P/H NO- III,BIRPARA, ALIPURDUAR, APPLICATION NO 4003068999 BILL/01785/2023-2024 BP-2023-24-364 27/09/2023 WBSEDCL 6.65 0.00 0 0
8 ALIPURDUAR Madarihat Northern Mechanical Division II SISHA JUMRHA PIPED WATER SUPPLY SCHEME , SM/12753 New NEW SERVICE CONNECTION FOR SISHUJHUMRA PWSS P/H NO-I,BIRPARA,ALIPURDUAR, APPLICATION NO 4003068997 BILL/01783/2023-2024 BP-2023-24-366 27/09/2023 WBSEDCL 6.89 0.00 0 0
Total 665.80 254.42 38.21