Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 371.89 190.91 51.34  
1 ALIPURDUAR Kumargram Northern Mechanical Division II SANKOSH TG AREA PIPED WATER SUPPLY SCHEME , SM/11485 New Quotation for new service connection at Sankosh TG P/H No-I. Application No- 4003039354 BILL/00022/2022-2023 BP-105/22-23 19/12/2022 WBSEDCL 1.58 0.00 0 0
2 ALIPURDUAR Kumargram Northern Mechanical Division II SANKOSH TG AREA PIPED WATER SUPPLY SCHEME , SM/11485 New Quotation for new service connection at Sankosh TG P/H No-II. Application No- 4003039376 BILL/00023/2022-2023 BP-106/22-23 19/12/2022 WBSEDCL 1.58 0.00 0 0
3 ALIPURDUAR Kumargram Alipurduar Division SANKOSH TG AREA PIPED WATER SUPPLY SCHEME , SM/11485 New Material Requisition To Resource Division RTOR000008/2023-2024 189/ALD 28/04/2023 Resource Division 15.48 0.00 0 0
4 ALIPURDUAR Kumargram Alipurduar Division SANKOSH TG AREA PIPED WATER SUPPLY SCHEME , SM/11485 New Supply of CIDF & CISS Pipes and specials for Sankos TG WSS Under Alipurduar Division P.H.E Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000236/2023-2024 1592/ALD 25/08/2023 30 SOUVIK ROY PALADHI 6.76 0.00 0 0
5 ALIPURDUAR Kumargram Alipurduar Division SANKOSH TG AREA PIPED WATER SUPPLY SCHEME , SM/11485 New Providing balance FHTC for SANKOSH TG PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000244/2023-2024 1790/ALD 29/08/2023 60 SOUVIK ROY PALADHI 12.27 0.00 0 0
6 ALIPURDUAR Kumargram Alipurduar Division SANKOSH TG AREA PIPED WATER SUPPLY SCHEME , SM/11485 New Construction of Pump House,Boundary Wall, Tube well Boring by ODEX-165 Method of drilling at H/W site including laying distribution system and providing FHTC for SANKOSH TEA GARDEN AREA PWSS Under Alipurduar Division PHE DTE. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000207/2022-2023 1276/ALD 17/08/2022 120 SOUVIK ROY PALADHI 96.66 88.40 91.45 50
7 ALIPURDUAR Kumargram Alipurduar Division SANKOSH TG AREA PIPED WATER SUPPLY SCHEME , SM/11485 New Construction of Pump House, Boundary Wall, Tube well Boring by ODEX-165 Method of drilling at 2nd site including laying distribution system , Rising main and providing FHTC for SANKOSH TEA GARDEN AREA PWSS Under Alipurduar Division PHE DTE. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000208/2022-2023 1277/ALD 17/08/2022 120 SOUVIK ROY PALADHI 83.75 73.88 88.21 70
8 ALIPURDUAR Kumargram Alipurduar Division SANKOSH TG AREA PIPED WATER SUPPLY SCHEME , SM/11485 New Material Requisition To Resource Division RTOR000026/2022-2023 1591/ALD 14/09/2022 Resource Division 6.68 0.00 0 0
9 ALIPURDUAR Kumargram Northern Mechanical Division II SANKOSH TG AREA PIPED WATER SUPPLY SCHEME , SM/11485 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Sankosh water supply scheme, TW no II under Northern Mechanical Division-II, PHEDte.Alipurduar. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000011/2023-2024 864/NMD-II 26/04/2023 30 KARMAKAR CONSTRUCTION 10.74 10.35 96.37 90
10 ALIPURDUAR Kumargram Alipurduar Division SANKOSH TG AREA PIPED WATER SUPPLY SCHEME , SM/11485 New Laying of HDPE/DI Pipeline for filling up the gap & bridge / culvert crossing, specials repair with trial run of pipeline and allied works at Sankosh TG PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000398/2023-2024 209/ALD 16/01/2024 90 SOUVIK ROY PALADHI 19.84 0.00 0 0
11 ALIPURDUAR Kumargram Northern Mechanical Division II SANKOSH TG AREA PIPED WATER SUPPLY SCHEME , SM/11485 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Sankosh water supply scheme, TW no I(H/W Site) under Northern Mechanical Division-II, PHE Dte.Alipurduar. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000010/2023-2024 860/NMD-II 26/04/2023 30 SAIKAT SINHA 10.76 5.06 47.03 100
12 ALIPURDUAR Kumargram Alipurduar Division SANKOSH TG AREA PIPED WATER SUPPLY SCHEME , SM/11485 New Laying of Rising Main line with HDPE PN 10, bridge and culvert crossing, cons. Of pathway, surface drain and chatal, Installation of Paver block, land development along with the other allied works at Sankosh TG H/W Site under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000335/2023-2024 390/ALD 05/02/2024 90 K S ENTERPRISE 48.17 0.00 0 0
13 ALIPURDUAR Kumargram Alipurduar Division SANKOSH TG AREA PIPED WATER SUPPLY SCHEME , SM/11485 New Construction of 250cum. OHR for Sankosh TG Water Supply Scheme under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division,Birpara Sub Division ORD/000140/2022-2023 977/ALD 15/07/2022 180 SOUVIK ROY PALADHI 57.62 13.22 22.94 46
Total 371.88 190.90 51.33