Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 871.63 213.53 24.5  
1 ALIPURDUAR Kalchini Alipurduar Division UTTAR MANDABARI PIPED WATER SUPPLY SCHEME , SM/16539 New Material Requisition To Resource Division RTOR000019/2023-2024 1257/ALD 10/08/2023 Resource Division 35.74 0.00 0 0
2 ALIPURDUAR Kalchini Alipurduar Division UTTAR MANDABARI PIPED WATER SUPPLY SCHEME , SM/16539 New Providing balance FHTC from existing distribution system as per specification for UTTAR MANDABARI PWSS under Alipurduar Division, PHE Dte. HQ-A.E RWS Kalchini Block ORD/000281/2023-2024 1988/ALD 15/09/2023 60 SHYAMAL ROY 11.35 0.00 0 0
3 ALIPURDUAR Kalchini Alipurduar Division UTTAR MANDABARI PIPED WATER SUPPLY SCHEME , SM/16539 New Material Requisition To Resource Division RTOR000087/2023-2024 111/ALD 10/01/2024 Resource Division 14.35 0.00 0 0
4 ALIPURDUAR Kalchini Northern Mechanical Division II UTTAR MANDABARI PIPED WATER SUPPLY SCHEME , SM/16539 New New Service connection for Uttar Mendabari PWSS, Zone-I, P/H no.-I BILL/02408/2023-2024 BP-2023-24-528 11/01/2024 WBSEDCL 6.69 0.00 0 0
5 ALIPURDUAR Kalchini Northern Mechanical Division II UTTAR MANDABARI PIPED WATER SUPPLY SCHEME , SM/16539 New New Service connection for Uttar Mendabari PWSS, Zone-I, P/H no.-I BILL/02408/2023-2024 BP-2023-24-528 11/01/2024 WBSEDCL 6.69 0.00 0 0
6 ALIPURDUAR Kalchini Northern Mechanical Division II UTTAR MANDABARI PIPED WATER SUPPLY SCHEME , SM/16539 New NEW SERVICE CONNECTION FOR UTTAR MENDABARI PWSS ZONE-I P/H NO-I BILL/02470/2023-2024 BP-2023-24-549 18/01/2024 WBSEDCL 10.65 0.00 0 0
7 ALIPURDUAR Kalchini Northern Mechanical Division II UTTAR MANDABARI PIPED WATER SUPPLY SCHEME , SM/16539 New Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Uttar Mandabari Water Supply Scheme TW No.- I and II of Zone-I and TW No- I of Zone-II under NMD-II,PHE.Dte,APD. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000894/2023-2024 2481/NMD-II 11/08/2023 30 DEY ENTERPRISE (MALDA) 32.91 12.86 39.08 40
8 ALIPURDUAR Kalchini Alipurduar Division UTTAR MANDABARI PIPED WATER SUPPLY SCHEME , SM/16539 New Supply of DIDF pipes and specials and Sluice Valve for Uttar Mendabari Water Supply (SM/16539) Scheme OF Kalchini Block under Alipurduar Division P.H.E. Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000203/2024-2025 1952/ALD 02/07/2024 30 KAMALA VALVES AND ENGINEERING PRIVATE LIMITED 16.50 0.00 0 0
9 ALIPURDUAR Kalchini Alipurduar Division UTTAR MANDABARI PIPED WATER SUPPLY SCHEME , SM/16539 New Constructions of 250 Cum OHR as per Departmental Design & drawing including laying distribution system with new HDPE pipeline, RISING MAIN, Construction of 2(TWO) NOS of BOUNDARY WALL, 3(THREE) NOS ODEX-165 TUBE WELL, 3(THREE) NOS PUMP HOUSE, Soil Investigation work, providing FHTC and others allied works for UTTAR MANDABARI PWSS(ZONE-I+ZONE-II), Alipurduar Division, PHE DTE. HQ-A.E RWS Kalchini Block ORD/000177/2023-2024 1113/ALD 28/07/2023 360 MAHENDRA CHHETRI 736.75 200.67 27.24 77
Total 871.64 213.53 24.5