Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 513.41 73.42 14.3  
1 ALIPURDUAR Kalchini Alipurduar Division Malangi Tea Garden Area Piped Water Supply Scheme , SM/18150 New Providing balance FHTC from existing distribution system as per specification for MALANGI TG PWSS under Alipurduar Division, PHE Dte. HQ-A.E RWS Kalchini Block ORD/000282/2023-2024 1989/ALD 15/09/2023 60 KAMALESH ROY 10.86 0.00 0 0
2 ALIPURDUAR Kalchini Alipurduar Division Malangi Tea Garden Area Piped Water Supply Scheme , SM/18150 New Material Requisition To Resource Division RTOR000074/2023-2024 99/ALD 10/01/2024 0 Resource Division 13.03 0.00 0 0
3 ALIPURDUAR Kalchini Alipurduar Division Malangi Tea Garden Area Piped Water Supply Scheme , SM/18150 New Material Requisition To Resource Division RTOR000024/2024-2025 3982/ALD 27/11/2024 0 Resource Division 13.03 0.00 0 0
4 ALIPURDUAR Kalchini Northern Mechanical Division II Malangi Tea Garden Area Piped Water Supply Scheme , SM/18150 New QUOTATION CHARGES FOR MALANGI TG PWSS BILL/00273/2024-2025 BP-66/24-25 09/05/2024 0 WBSEDCL 1.36 0.00 0 0
5 ALIPURDUAR Kalchini Northern Mechanical Division II Malangi Tea Garden Area Piped Water Supply Scheme , SM/18150 New New Service connection charges for Malongi TG PWSS PH NO-01, HASHIMARA BILL/00734/2024-2025 BP-195/24-25 09/07/2024 0 WBSEDCL 5.06 0.00 0 0
6 ALIPURDUAR Kalchini Northern Mechanical Division II Malangi Tea Garden Area Piped Water Supply Scheme , SM/18150 New New Service Connection Charges for Malongi TG PWSS PH NO-02 BILL/00733/2024-2025 BP-196/24-25 09/07/2024 0 WBSEDCL 9.66 0.00 0 0
7 ALIPURDUAR Kalchini Alipurduar Division Malangi Tea Garden Area Piped Water Supply Scheme , SM/18150 New Tube well Boring by ODEX-165 Method of drilling at HW, 2nd TUBE WELL site including two nos. pump house and boundary wall, providing FHTC and others allied works for MALANGI TEA GARDEN AREA PWSS Under Alipurduar Division PHE DTE. HQ-A.E RWS Kalchini Block ORD/000018/2023-2024 236/ALD 04/05/2023 748 RAMESH SHARMA 139.90 21.20 15.15 10
8 ALIPURDUAR Kalchini Alipurduar Division Malangi Tea Garden Area Piped Water Supply Scheme , SM/18150 New Constructions of 300 Cum OHR as per Departmental Design & drawing, including laying distribution system with new HDPE pipeline , Rising Main, Soil Investigation work and others allied works for MALANGI TEA GARDEN AREA PWSS Under Alipurduar Division PHE DTE. HQ-A.E RWS Kalchini Block ORD/000175/2023-2024 1049/ALD 20/07/2023 720 CAPITAL ENGINEERS 201.31 52.22 25.94 45
9 ALIPURDUAR Kalchini Northern Mechanical Division II Malangi Tea Garden Area Piped Water Supply Scheme , SM/18150 New Supply, delivery, installation, commissioning and trial run of electro-mechanical components along with Cu wound line voltage corrector for MALANGI T.G water supply scheme, TW no I and II under JJM under NMD-II, PHE Dte. APD. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000990/2023-2024 2620/NMD-II 25/08/2023 578 B.B CONCERNED 21.90 0.00 0 40
10 ALIPURDUAR Kalchini Alipurduar Division Malangi Tea Garden Area Piped Water Supply Scheme , SM/18150 New Hiring of Diesel Vehicle Maxi Cab(At least 7 seater ) for Assistant Engineer, Alipurduar RWS Sub-Division, P.H.E. Dte. (from 01.04.2025 to 31.03.2026) Alipurduar RWS JUNIOR ENGINEER ORD/000604/2024-2025 5303/ALD 28/03/2025 365 SASANKA ROY 4.80 0.00 0 0
11 ALIPURDUAR Kalchini Alipurduar Division Malangi Tea Garden Area Piped Water Supply Scheme , SM/18150 New Supplying and Laying of Water supply line (using HDD/micro tunneling machine) for supply of drinking water in different areas of Alipurduar district under Alipurduar Division PHE Dte. Birpara A.E,HQ-A.E RWS Falakata Block,RWS Kumargram Block ORD/000464/2024-2025 5287/ALD 07/03/2025 240 APEX ENGINEERING 74.36 0.00 0 65
12 ALIPURDUAR Kalchini Alipurduar Division Malangi Tea Garden Area Piped Water Supply Scheme , SM/18150 New Providing Functional Tap Connection (FHTC) in connection with Jaldhara/JalSwapna for Kalchini Block under Alipurduar Division, PHE Dte. (Pin point site of the FHTC will be given at the time of issue of work order) HQ-A.E RWS Kalchini Block ORD/000084/2025-2026 1052/ALD 17/06/2025 60 MOTI INDUSTRIES 18.14 0.00 0 0
Total 513.40 73.42 14.3