Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
8 208.33 24.46 11.74  
1 ALIPURDUAR Alipurduar Division F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Piped Water Supply Scheme (Phase-1) , SM/07138 Retrofitting Laying of HDPE/DI pipe line at different area of flank of Lankapara road/village road and Lankapara Bazar Area under Alipurduar Division, PHE Dte. Birpara A.E Birpara Sub Division ORD/000182/2020-2021 1007/ALD 12/11/2020 60 MADHAB SAHA 33.79 0.00 0 98.5
2 ALIPURDUAR Alipurduar Division F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Piped Water Supply Scheme (Phase-1) , SM/07138 Retrofitting Laying of DI/MS/HDPE Distribution pipe line for the LANKAPARA WSS (TULSHIPARA TG) under Alipurduar Division, PHE Dte. Dist-Alipurduar. Birpara A.E Birpara Sub Division ORD/000268/2020-2021 1280/ALD 05/01/2021 60 UMWELT ENGINEER PVT. LTD. 30.90 1.86 6.02 98
3 ALIPURDUAR Alipurduar Division F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Piped Water Supply Scheme (Phase-1) , SM/07138 Retrofitting Sinking of 1no. Tube Well for replacement and another 1no. new Tube Well near factory line by ODEX-195 method of drilling at Lankapara Water Supply Scheme under Alipurduar Division, PHE Dte. Birpara A.E Birpara Sub Division ORD/000205/2021-2022 1345/ALD 08/10/2021 30 SASANKA ROY 33.00 0.00 0 96
4 ALIPURDUAR Alipurduar Division F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Piped Water Supply Scheme (Phase-1) , SM/07138 Retrofitting Development of rig Bore TW by ODEX-165 method of drilling at Lankapara WSS under Alipurduar Division, PHE Dte. Birpara A.E Birpara Sub Division ORD/000261/2021-2022 1608/ALD 22/11/2021 20 DILIP MAHATO 0.66 0.00 0 98.5
5 ALIPURDUAR Alipurduar Division F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Piped Water Supply Scheme (Phase-1) , SM/07138 Retrofitting Construction of balance portion of boundary wall at CWR site under LANKAPARA (TULSHIPARA TG ) WSS under Alipurduar Division PHE Dte . Birpara A.E Birpara Sub Division ORD/000084/2022-2023 448/ALD 13/05/2022 30 TAPASH KUMAR BHOWMICK 4.91 0.00 0 96.5
6 ALIPURDUAR Alipurduar Division F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Piped Water Supply Scheme (Phase-1) , SM/07138 Retrofitting Sinking of Rig Bore Tube well by Odex-165 method of drilling and installation of Raising Main and laying of DI/MS/HDPE pipe line for the Tulshipara and Lankapara Water Supply Scheme. Birpara A.E Birpara Sub Division ORD/000181/2020-2021 1006/ALD 12/11/2020 60 UMWELT ENGINEER PVT. LTD. 32.34 3.86 11.94 97
7 ALIPURDUAR Alipurduar Division F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Piped Water Supply Scheme (Phase-1) , SM/07138 Retrofitting PROVIDING HOUSE CONNECTION FOR DIMDIMA Z-I PWSS AT MADARIHAT-BIRPARA BLOCK UNDER ALIPURDUAR DIVISION, PHE DTE. PART-2 Birpara A.E Alipurduar Sub Division ORD/000194/2020-2021 1025/ALD 18/11/2020 60 DILIP MAHATO 28.87 11.47 39.73 0
8 ALIPURDUAR Alipurduar Division F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Piped Water Supply Scheme (Phase-1) , SM/07138 Retrofitting Providing House connection for JAIGAON piped water supply scheme (Old scheme Area) under Alipuduar Division, P.H.E. Dte. Part-1 HQ-A.E RWS Kalchini Block ORD/000317/2020-2021 1449/ALD 25/01/2021 45 MAHENDRA CHHETRI 43.86 7.27 16.58 67
Total 208.32 24.46 11.74