| Sl No. | District
As per Census (2011)
|
Scheme SM Code | Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Type
Type of Scheme as per PHED-MIS
|
Name of JE entrusted | SLSSC Date
Date of SLSSC in which the Scheme has been Approved
|
FHTC Involved
Approved FHTC Count Modified after the appropriation in YDU considered under the Schemes for which Work Order has been Issued as per PHED-MIS
|
Estimated Cost | AAFS Cost
Approved Implementation as mentioned in AAFS considered under the Schemes for which Work Order has been Issued as per PHED-MIS
|
Date of First Work Order
Total No. of Work Orders Issued under the Scheme as per PHED-MIS
|
No. of Work Orders Issued
Total No. of Work Orders Issued under the Scheme as per PHED-MIS
|
Work Value
Total Cost for all the Issued Work Order under the Scheme as per PHED-MIS
|
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 378 | 6,84,325 | 1,68,915.69 | 1,83,089.49 | # | 2,451 | 1,75,726.38 | ||||||
| 1 | NADIA | SM/08128 | Providing Functional House Tap Connection from Elangi Zone-II Water Supply Scheme (Phase-I) of Retrofitting under Jal Swapno Programme in Nadia District | Retrofitting | 08/01/2021 | 1,000 | 88.64 | 88.64 | 10/06/2021 | 6 | 86.61 | |
| 2 | NADIA | SM/07433 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-III, Zone-II within Krishnagar-II, Nabadwip (Part) Block (Phase-B) | Retrofitting | 04/12/2020 | 2,058 | 100.00 | 100.00 | 10/02/2021 | 1 | 96.42 | |
| 3 | NADIA | SM/07419 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-I, Zone-VI within Kaliganj Block (Phase- A) | Retrofitting | 04/12/2020 | 2,030 | 100.00 | 100.00 | 31/12/2020 | 7 | 217.19 | |
| 4 | NADIA | SM/07459 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-II, Zone-I within Nakashipara Block (Phase-A) | Retrofitting | 04/12/2020 | 2,024 | 99.98 | 99.98 | 15/01/2021 | 3 | 145.30 | |
| 5 | NADIA | SM/08135 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-II, Zone-IX within Nakashipara Block (Phase-A) | Retrofitting | 08/01/2021 | 2,010 | 99.67 | 99.67 | 18/02/2021 | 3 | 196.46 | |
| 6 | NADIA | SM/08136 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-II, Zone-IX within Nakashipara Block (Phase-B) | Retrofitting | 08/01/2021 | 2,029 | 99.66 | 99.66 | 06/10/2023 | 6 | 2,540.33 | |
| 7 | NADIA | SM/08055 | Providing Functional House Tap Connection from Dakshin Jhikipota Zone-II Water Supply Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting). | Retrofitting | 08/01/2021 | 1,500 | 99.79 | 99.79 | 13/05/2021 | 5 | 109.97 | |
| 8 | NADIA | SM/07487 | Providing Functional House Tap Connection from Sonda (Zone-II) Water Supply Scheme under Jal Swapno Programme (Phase-I) | Retrofitting | 04/12/2020 | 300 | 21.72 | 21.72 | 30/12/2020 | 3 | 38.01 | |
| 9 | NADIA | SM/07488 | Providing Functional House Tap Connection from Sonda (Zone-I) Water Supply Scheme under Jal Swapno Programme (Phase-I) | Retrofitting | 04/12/2020 | 1,214 | 96.71 | 96.71 | 06/01/2021 | 3 | 99.91 | |
| 10 | NADIA | SM/07496 | Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-II, Zone-VII within Nakashipara Block (Phase-A). | Retrofitting | 04/12/2020 | 2,020 | 99.98 | 99.98 | 18/02/2021 | 1 | 97.09 | |
| 11 | NADIA | SM/09090 | Retrofitting of Ground Water Based Piped Water Supply Scheme for Paschim Bhatjangla Zone I | Retrofitting | 15/09/2021 | 3,038 | 501.56 | 501.56 | 26/07/2024 | 7 | 691.10 | |
| 12 | NADIA | SM/09041 | Providing Functional House Tap Connection from Naserkuli Zone-II Water Supply Scheme (Phase-I) of Retrofitting under JalSwapna Program in Nadia District under Nadia Division, P.H.EDte. | Retrofitting | 19/02/2021 | 1,600 | 98.66 | 98.66 | 03/11/2021 | 6 | 107.92 | |
| 13 | NADIA | SM/09045 | Providing Functional House Tap Connection from Murutia WaterSupply Scheme (Phase-I) of Retrofitting under Jal SwapnaProgram in Nadia District under Nadia Division, P.H.E Dte. | Retrofitting | 19/02/2021 | 1,600 | 99.29 | 99.29 | 03/11/2021 | 5 | 120.78 | |
| 14 | NADIA | SM/09570 | RETROFITTING UNDER JAL SWAPNA FOR MAHISNENGRA ZONE - I WATER SUPPLY SCHEME in Krishnagar-I Block of Nadia District | Retrofitting | 08/10/2021 | 2,573 | 340.83 | 409.63 | 23/05/2025 | 6 | 431.60 | |
| 15 | NADIA | SM/09571 | RETROFITTING UNDER JAL SWAPNA FOR GAZNA PWSS in HANSKHALI Block of Nadia District under Nadia Division PHE.Dte. | Retrofitting | 08/10/2021 | 1,189 | 283.28 | 339.06 | 04/08/2025 | 14 | 383.56 | |
| 16 | NADIA | SM/08951 | Providing FHTC Surface Water Based Water Supply Scheme(Northern Sector), Part-II, Zone-VII within Nakashipara Block.(Phase-C) | Retrofitting | 19/02/2021 | 4,047 | 227.26 | 227.26 | 18/04/2022 | 8 | 692.97 | |
| 17 | NADIA | SM/08956 | Providing FHTC Surface Water Based Water Supply Scheme(Northern Sector), Part-I, Zone-I, II AND IV within Kaliganj Block.(Phase-C) | Retrofitting | 19/02/2021 | 4,029 | 259.63 | 259.63 | 18/04/2022 | 14 | 410.66 | |
| 18 | NADIA | SM/08671 | Providing Functional House Tap Connection from Dakshinpara Zone-II Water Supply Scheme under Jal Swapna Program inNadia District under Nadia Division, P.H.E Dte. (Phase-A) | Retrofitting | 19/02/2021 | 1,625 | 99.50 | 99.50 | 20/09/2021 | 4 | 106.37 | |
| 19 | NADIA | SM/09527 | RETROFITTING UNDER JAL SWAPNA FOR DAKSHIN JHITKIPOTA ZONE-I WATER SUPPLY SCHEME in Krishnagar-I Block of Nadia District under Nadia Division, P.H.E. Dte. | Retrofitting | 08/10/2021 | 2,761 | 387.92 | 418.17 | 24/02/2022 | 3 | 303.79 | |
| 20 | NADIA | SM/09452 | Augmentation of Ground Water Based Piped Water Supply Scheme for NAZIRPUR to Accommodate FHTC in Tehatta-I block of Nadia district underNadia division. | Augmentation | 08/10/2021 | 3,255 | 718.97 | 770.93 | 14/06/2024 | 13 | 1,032.81 | |
| 21 | NADIA | SM/09787 | Augmentation of Ground Water Based Piped Water Supply Scheme for MAHISNENGRA Zone-II to Accommodate FHTC in Krishnagar-I block of Nadia District under Nadia Division PHE Dte. | Augmentation | 22/11/2021 | 442 | 276.90 | 327.87 | 27/05/2025 | 10 | 258.18 | |
| 22 | NADIA | SM/09788 | Augmentation of Ground Water Based Piped Water Supply Scheme for ITLA to Accommodate FHTC in Krishnagar-I Block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 22/11/2021 | 401 | 257.61 | 280.78 | 13/07/2023 | 8 | 306.64 | |
| 23 | NADIA | SM/08666 | Providing Functional House Tap Connection from Teinpur Zone-I Water Supply Scheme (Phase-I) of Retrofitting under Jal SwapnaProgram in Nadia District under Nadia Division, P.H.E Dte. | Retrofitting | 19/02/2021 | 605 | 42.25 | 42.25 | 15/09/2021 | 3 | 43.41 | |
| 24 | NADIA | SM/08667 | Providing Functional House Tap Connection from Naserkuli Zone-I Water Supply Scheme (Phase-I) of Retrofitting under Jal SwapnaProgram in Nadia District under Nadia Division, P.H.E Dte. | Retrofitting | 19/02/2021 | 1,600 | 98.66 | 98.66 | 15/09/2021 | 6 | 104.41 | |
| 25 | NADIA | SM/08964 | Providing Functional House Tap Connection from Krishnaganj Water Supply Scheme under Jal Swapna Program in Nadia District under Nadia Division, P.H.E Dte. (Phase-I, Retrofitting) | Retrofitting | 19/02/2021 | 5,500 | 278.10 | 278.10 | 03/11/2021 | 6 | 373.95 | |
| 26 | NADIA | SM/09092 | Providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapno with shifting of existing PHE Pipeline for implementation of widening and strengthning work of Swarupganj UBI More to Anandabas Road from 0.00 Kmp to 6.10 Kmp under NH D | Retrofitting | 15/09/2021 | 407 | 64.97 | 64.97 | 20/12/2021 | 5 | 66.08 | |
| 27 | NADIA | SM/09815 | Augmentation of Ground Water Based Piped Water Supply Scheme for Muktadaha Zone-I to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 22/11/2021 | 1,562 | 375.85 | 405.95 | 20/04/2023 | 9 | 626.50 | |
| 28 | NADIA | SM/09816 | Augmentation of Ground Water Based Piped Water Supply Scheme for MUKTADAHA ZONE-II to Accommodate FHTC in Karimpur-I block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 22/11/2021 | 128 | 323.47 | 345.18 | 03/12/2021 | 11 | 287.84 | |
| 29 | NADIA | SM/10715 | Augmentation of Ground Water Based Jalangi Zone-X-A PWSS to accommodate FHTC in Karimpur-II Block under Tehatta Sub-Division of Nadia Division in Nadia District. | Augmentation | 27/01/2022 | 1,850 | 253.57 | 253.57 | 16/01/2023 | 10 | 225.02 | |
| 30 | NADIA | SM/10573 | PROVIDING FHTC BY AUGMENTATION FOR GEDE PWSS BLOCK: KRISHNAGANJ DISTRICT: NADIA | Augmentation | 16/03/2022 | 537 | 203.80 | 222.09 | 26/07/2023 | 9 | 280.17 | |
| 31 | NADIA | SM/10009 | Augmentation of Ground Water Based Piped Water Supply Scheme for Senpur to Accommodate FHTC in Krishnagar-I Block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 22/11/2021 | 2,901 | 521.27 | 566.31 | 20/04/2023 | 13 | 824.10 | |
| 32 | NADIA | SM/11815 | Augmentation of Ground Water Based Piped Water Supply Scheme for BARUIPARA to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 16/12/2021 | 6,730 | 1,531.46 | 1,670.52 | 31/07/2024 | 13 | 1,665.93 | |
| 33 | NADIA | SM/11509 | AUGMENTATION OF GROUND WATER BASED KAMGACHI PWSS PART-II TO ACCOMMODATE FHTC IN RANAGHAT-I BLOCK IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 30/03/2022 | 6,825 | 907.31 | 1,014.09 | 22/12/2022 | 5 | 875.37 | |
| 34 | NADIA | SM/11978 | Augmentation of Ground Water Based Piped Water Supply Scheme for NASERKHULI ZONE-I to Accommodate FHTC in Ranaghat-II Block of Nadia District under Nadia Division, P.H.E. Dte | Augmentation | 30/03/2022 | 5,713 | 1,018.89 | 1,136.09 | 28/09/2022 | 2 | 700.27 | |
| 35 | NADIA | SM/11638 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE I/B(NORTHERN SECTOR PART-III) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 30/03/2022 | 3,332 | 998.84 | 1,147.59 | 02/10/2024 | 3 | 336.81 | |
| 36 | NADIA | SM/11739 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE IX/A (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 1,909 | 933.60 | 1,079.81 | 17/03/2022 | 2 | 301.63 | |
| 37 | NADIA | SM/12005 | Mini Piped Water Supply Scheme at Uttar Bishnupur Village, Block- Ranaghat-II, District- Nadia. | New | 15/07/2022 | 97 | 48.32 | 50.91 | 13/09/2024 | 3 | 80.64 | |
| 38 | NADIA | SM/11873 | AUGMENTATION OF GROUND WATER BASED NARAYANPUR PWSS PHASE-II TO ACCOMMODATE FHTC IN KARIMPUR-II BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 20/05/2022 | 150 | 517.94 | 597.32 | 27/04/2023 | 3 | 35.00 | |
| 39 | NADIA | SM/11807 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE II/A (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 1,780 | 388.00 | 388.00 | 14/03/2024 | 2 | 12.46 | |
| 40 | NADIA | SM/17220 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ITLA(PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 136.31 | 136.31 | 17/10/2023 | 1 | 41.60 | |
| 41 | NADIA | SM/17206 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Teinpur zone II PWSS (PHASE-II) IN Karimpur II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 32.84 | 32.84 | 21/03/2023 | 2 | 22.83 | |
| 42 | NADIA | SM/11697 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE IX/B (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 2,638 | 999.66 | 1,122.71 | 19/09/2024 | 4 | 378.42 | |
| 43 | NADIA | SM/07417 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-I, Zone-IX within Kaliganj Block (Phase- A) | Retrofitting | 04/12/2020 | 2,025 | 100.00 | 100.00 | 14/07/2021 | 5 | 278.06 | |
| 44 | NADIA | SM/07420 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-I, Zone-VI within Kaliganj Block (Phase- B) | Retrofitting | 04/12/2020 | 2,024 | 100.00 | 100.00 | 31/12/2020 | 5 | 187.75 | |
| 45 | NADIA | SM/07452 | Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-II, Zone-VI within Nakashipara Block (Phase-A). | Retrofitting | 04/12/2020 | 2,031 | 99.98 | 99.98 | 19/02/2021 | 5 | 289.48 | |
| 46 | NADIA | SM/07456 | Providing Functional House Tap Connection from Bablari Dewanganj Water Supply Scheme under Jal Swapno Programme | Retrofitting | 04/12/2020 | 1,421 | 99.96 | 99.96 | 06/01/2021 | 5 | 233.42 | |
| 47 | NADIA | SM/07457 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-II, Zone-IV within Nakashipara Block (Phase-A) | Retrofitting | 04/12/2020 | 2,031 | 99.98 | 99.98 | 15/01/2021 | 3 | 169.91 | |
| 48 | NADIA | SM/07491 | Retrofitting of Providing FHTC at Ground Water based Ber Ramchandrapur Zone-II Water Supply Scheme within Karimpur-1 Block (Phase-1) | Retrofitting | 04/12/2020 | 517 | 33.20 | 33.20 | 30/12/2020 | 2 | 54.43 | |
| 49 | NADIA | SM/07494 | Providing Functional House Tap Connection from Kulgachi Water Supply Scheme under Jal Swapno Programme | Retrofitting | 04/12/2020 | 1,397 | 94.80 | 94.80 | 06/01/2021 | 2 | 146.48 | |
| 50 | NADIA | SM/06996 | Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-I within Kaliganj Block (Phase-A). | Retrofitting | 25/09/2020 | 2,025 | 100.00 | 100.00 | 31/12/2020 | 5 | 105.64 | |
| 51 | NADIA | SM/07001 | Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-IV within Kaliganj Block (Phase-B). | Retrofitting | 25/09/2020 | 2,024 | 99.99 | 99.99 | 29/07/2022 | 3 | 130.56 | |
| 52 | NADIA | SM/08890 | Proving FHTC (Functional Household Tap Connection ) by retrofitting under Jalswapno with utility shifting of water pipeline in connection to the work under Nadia highway Division I PWD (Roads)Dte along Dhubulia-Mayapur Road 0.00 Kmp to 11.12 kmp under Sur | Retrofitting | 19/08/2021 | 1,980 | 350.95 | 350.95 | 21/10/2022 | 9 | 502.08 | |
| 53 | NADIA | SM/09526 | Retrofitting of Ground Water Based Piped Water Supply Scheme For Bankar Dhopadi to accomodate FHTC in Nabadwip Block of Nadia District under Nadia Division, PHE Dte. | Retrofitting | 08/10/2021 | 145 | 134.40 | 145.92 | 13/07/2023 | 5 | 167.41 | |
| 54 | NADIA | SM/08673 | Providing Functional House Tap Connection from Hudachapra Water Supply Scheme under Jal Swapna Program in NadiaDistrict under Nadia Division, P.H.E Dte. (Phase-A) | Retrofitting | 19/02/2021 | 952 | 77.87 | 77.87 | 20/09/2021 | 6 | 140.89 | |
| 55 | NADIA | SM/10421 | Augmentation of Ground Water Based Piped Water Supply Scheme for Nathna Zone-I to accommodate FHTC in Tehatta-I block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 27/01/2022 | 1,712 | 397.30 | 426.37 | 06/04/2023 | 10 | 392.85 | |
| 56 | NADIA | SM/10080 | Providing FHTC by augmentation under Jal Swapna for Kulgachi PWSS, in Tehatta-II block with in Nadia district under Nadia Division | Augmentation | 16/12/2021 | 912 | 348.49 | 369.35 | 21/08/2024 | 9 | 335.51 | |
| 57 | NADIA | SM/10526 | AUGMENTATION OF GROUND WATER BASED KARIMPUR-JALANGI ZONE-IV PWSS TO ACCOMMODATE FHTC IN KARIMPUR-I BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 17/02/2022 | 3,978 | 987.27 | 1,064.47 | 31/07/2024 | 9 | 899.68 | |
| 58 | NADIA | SM/09794 | Augmentation of Ground Water Based Piped Water Supply Scheme for DURGAPUR CHOWGACHA to Accommodate FHTC in Krishnaganj Block of Nadia District under Nadia Division,PHE Dte. | Augmentation | 22/11/2021 | 4,006 | 883.40 | 1,153.20 | 15/07/2025 | 17 | 1,107.63 | |
| 59 | NADIA | SM/09108 | Retrofitting of Ground Water Based Piped Water Supply Scheme for Ghoralia Zone I | Retrofitting | 15/09/2021 | 4,627 | 603.97 | 603.97 | 20/06/2024 | 8 | 503.51 | |
| 60 | NADIA | SM/10523 | AUGMENTATION OF GROUND WATER BASED KARIMPUR-JALANGI ZONE-V PWSS TO ACCOMMODATE FHTC IN KARIMPUR-I BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 17/02/2022 | 2,726 | 740.13 | 740.13 | 13/10/2022 | 9 | 745.07 | |
| 61 | NADIA | SM/10692 | EXTENSION OF INTAKE STRUCTURE UNDER SURFACE WATER BASED WATER SUPPLY SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT (NORTHERN SECTOR) PART-II | Augmentation | 17/02/2022 | 0 | 2,040.25 | 2,184.41 | 25/06/2025 | 4 | 2,038.95 | |
| 62 | NADIA | SM/10598 | Augmentation of Ground Water Based Piped Water Supply Scheme for Mahisunra(Phase-II) to accommodate FHTC in Nabadwip block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 17/02/2022 | 3,995 | 860.88 | 959.66 | 29/03/2023 | 8 | 710.22 | |
| 63 | NADIA | SM/10726 | Augmentation of Ground Water Based Piped Water Supply Scheme for Bhimpur (Phase-II) to accommodate FHTC in Krishnagar-I block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 17/02/2022 | 2,682 | 786.16 | 956.49 | 26/07/2023 | 5 | 797.53 | |
| 64 | NADIA | SM/11510 | AUGMENTATION OF GROUND WATER BASED BADKULLA PWSS ZONE-II TO ACCOMMODATE FHTC IN HANSKHALI BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 30/03/2022 | 1,677 | 854.38 | 973.36 | 22/04/2025 | 10 | 1,048.94 | |
| 65 | NADIA | SM/11809 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE III/A (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 1,668 | 593.26 | 660.15 | 26/07/2024 | 7 | 271.37 | |
| 66 | NADIA | SM/10728 | Augmentation of Ground Water Based Piped Water Supply Scheme for TIORKHALI to Accommodate FHTC in NabadwipBlock of Nadia District under Nadia Division, P.H.E. Dte. | Augmentation | 16/03/2022 | 4,603 | 986.35 | 1,054.89 | 15/05/2023 | 9 | 961.33 | |
| 67 | NADIA | SM/11506 | Augmentation of Ground Water Based Piped Water Supply Scheme for SUBARNABIHAR ZONE-I to Accommodate FHTC in Krishnagar-I block of Nadia District under Nadia Division PHE Dte. | Augmentation | 30/03/2022 | 6,389 | 991.39 | 1,091.79 | 20/04/2023 | 17 | 1,114.29 | |
| 68 | NADIA | SM/11837 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE I/B (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 997 | 430.19 | 491.09 | 21/09/2023 | 5 | 421.28 | |
| 69 | NADIA | SM/11874 | AUGMENTATION OF GROUND WATER BASED DHORADAHA PWSS PHASE-II TO ACCOMMODATE FHTC IN KARIMPUR-II BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 20/05/2022 | 150 | 279.48 | 320.93 | 29/05/2023 | 1 | 0.92 | |
| 70 | NADIA | SM/13791 | AUGMENTATION GROUND WATER BASED WATER SUPPLY OF BADKULLA PWSS ZONE 1 TO ACCOMMODATE FHTC IN HANSKHALI BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 30/03/2022 | 5,529 | 1,351.09 | 1,552.56 | 08/04/2025 | 11 | 1,308.42 | |
| 71 | NADIA | SM/15276 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BADKULLA ZONE-I (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 82.12 | 82.12 | 23/03/2023 | 2 | 80.41 | |
| 72 | NADIA | SM/15280 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BANPUR (PHASE-II) IN KRISHNAGANJ BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 123.12 | 123.12 | 23/03/2023 | 1 | 47.83 | |
| 73 | NADIA | SM/08959 | Providing FHTC Surface Water Based Water Supply Scheme(Northern Sector), Part-III, Zone-IV within Krishnagar-II and Nabadwip (Part) Block. (Phase-E) | Retrofitting | 19/02/2021 | 4,062 | 235.33 | 235.33 | 04/08/2024 | 12 | 367.98 | |
| 74 | NADIA | SM/17205 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR MADHUGARI PWSS (PHASE-III) IN Karimpur I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 59.33 | 59.33 | 21/03/2023 | 3 | 41.60 | |
| 75 | NADIA | SM/10083 | Augmentation of ground water based Dhoradaha PWSS to accommodate FHTC in Karimpur-II Block with in Nadia District under Nadia Division,PHE Dte. | Augmentation | 16/12/2021 | 4,341 | 682.20 | 682.20 | 27/01/2023 | 9 | 740.51 | |
| 76 | NADIA | SM/07429 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-I, Zone-VII within Kaliganj Block (Phase-B) | Retrofitting | 04/12/2020 | 2,044 | 100.00 | 100.00 | 13/01/2021 | 3 | 162.48 | |
| 77 | NADIA | SM/08053 | Providing Functional House Tap Connection from Itla Water Supply Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting). | Retrofitting | 08/01/2021 | 1,331 | 91.05 | 91.05 | 29/07/2021 | 2 | 128.24 | |
| 78 | NADIA | SM/08138 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-II, Zone-VII within Nakashipara Block (Phase-B) | Retrofitting | 08/01/2021 | 2,034 | 99.98 | 99.98 | 18/02/2021 | 5 | 181.87 | |
| 79 | NADIA | SM/07486 | Providing Functional House Tap Connection from Anand1pur Water Supply Scheme under Jal Swapno Programme (Phase-I) | Retrofitting | 04/12/2020 | 1,309 | 99.99 | 99.99 | 22/01/2021 | 7 | 209.46 | |
| 80 | NADIA | SM/07003 | Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-VII within Kaliganj Block (Phase-A). | Retrofitting | 25/09/2020 | 2,025 | 99.99 | 99.99 | 08/12/2020 | 3 | 179.74 | |
| 81 | NADIA | SM/09089 | Retrofitting of Ground Water Based Piped Water Supply Scheme for Ghoralia Zone II | Retrofitting | 15/09/2021 | 1,143 | 179.66 | 179.66 | 13/12/2024 | 7 | 165.03 | |
| 82 | NADIA | SM/09044 | Providing Functional House Tap Connection from MuktadahaZone-II Water Supply Scheme (Phase-I) of Retrofitting under JalSwapna Program in Nadia District under Nadia Division, P.H.EDte. | Retrofitting | 19/02/2021 | 784 | 50.27 | 50.27 | 18/08/2023 | 3 | 41.06 | |
| 83 | NADIA | SM/08672 | Providing Functional House Tap Connection from Kamalpur Zone I Water Supply Scheme under Jal Swapna Program in NadiaDistrict under Nadia Division, P.H.E Dte. (Phase-A) | Retrofitting | 19/02/2021 | 1,416 | 98.31 | 98.31 | 20/09/2021 | 3 | 103.21 | |
| 84 | NADIA | SM/09453 | Augmentation of Ground Water Based Piped Water Supply Scheme for ANANDAPUR to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division,PHE Dte. | Augmentation | 08/10/2021 | 1,773 | 513.03 | 553.34 | 02/08/2024 | 11 | 571.86 | |
| 85 | NADIA | SM/10416 | Augmentation of Ground Water Based Piped Water Supply Scheme for Nathna Zone-II to accommodate FHTC in Tehatta-I block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 27/01/2022 | 5,022 | 939.14 | 1,006.28 | 11/08/2023 | 11 | 958.33 | |
| 86 | NADIA | SM/10419 | Augmentation of Ground Water Based Karimpur-Jalangi PWSS Zone-VII to accommodate FHTC in Karimpur-I block with in Nadia District under Nadia Division, PHE Dte. | Augmentation | 27/01/2022 | 3,531 | 535.12 | 535.12 | 01/08/2022 | 7 | 510.37 | |
| 87 | NADIA | SM/10081 | Augmentation of Ground Water Based Piped Water Supply Scheme for MADHPUR Block in Karimpur-II Block with in Nadia District under Nadia Division,PHE Dte. | Augmentation | 16/12/2021 | 790 | 224.22 | 240.57 | 26/07/2024 | 14 | 260.90 | |
| 88 | NADIA | SM/10527 | Augmentation of Ground Water Based Piped Water Supply Scheme for Pansila Block: Nabadwip, Dist: Nadia. | Augmentation | 17/02/2022 | 2,885 | 717.39 | 796.34 | 31/07/2024 | 10 | 832.14 | |
| 89 | NADIA | SM/08963 | Providing Functional House Tap Connection from Baraandulia Zone-I Water Supply Scheme under Jal Swapna Program in Nadia District under Nadia Division, P.H.E Dte. (Phase-I, Retrofitting) | Retrofitting | 19/02/2021 | 5,000 | 266.95 | 266.95 | 03/11/2021 | 6 | 185.42 | |
| 90 | NADIA | SM/10423 | Augmentation of Ground Water Based Piped Water Supply Scheme for ISWARCHANDRAPUR to Accommodate FHTC in Tehatta-II block of Nadia district under Nadia division P.H.E. Dte | Augmentation | 27/01/2022 | 965 | 317.23 | 334.95 | 14/06/2024 | 10 | 324.54 | |
| 91 | NADIA | SM/09798 | Augmentation of Ground Water Based Piped Water Supply Scheme for MURUTIA to Accommodate FHTC in Karimpur-II block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 22/11/2021 | 4,420 | 937.08 | 1,026.80 | 28/02/2022 | 10 | 1,025.48 | |
| 92 | NADIA | SM/10521 | AUGMENTATION OF GROUND WATER BASED TEINPUR (ZONE-III) PIPED WATER SUPPLY SCHEME TO ACCOMMODATE FHTC IN KARIMPUR-II BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 17/02/2022 | 396 | 256.88 | 290.85 | 16/07/2024 | 8 | 269.99 | |
| 93 | NADIA | SM/10737 | AUGMENTATION OF GROUND WATER BASED KARIMPURJALANGI PWSS ZONE-X(B) TO ACCOMMODATE FHTC IN KARIMPUR-II BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 17/02/2022 | 884 | 174.54 | 174.54 | 13/01/2023 | 6 | 120.20 | |
| 94 | NADIA | SM/10460 | Augmentation of Ground Water Based Kamgachi PWSS Part to accommodate FHTC in Ranaghat-I block with in Nadia District under Nadia Division, PHE Dte. | Augmentation | 27/01/2022 | 4,550 | 996.79 | 996.79 | 22/12/2022 | 11 | 725.83 | |
| 95 | NADIA | SM/10571 | PROVIDING FHTC BY AUGMENTATION FOR DAKSHINPARA (ZONE-II) PWSS BLOCK: HANSKHALI DISTRICT: NADIA | Augmentation | 16/03/2022 | 240 | 232.43 | 287.87 | 26/05/2025 | 12 | 244.13 | |
| 96 | NADIA | SM/07421 | Providing Functional Household Tap Connection from Utter Tajpur W/S Scheme (Phase-I) of Retrofitting under Jal Swapno Programme | Retrofitting | 04/12/2020 | 1,400 | 99.66 | 99.66 | 07/01/2021 | 4 | 161.02 | |
| 97 | NADIA | SM/11831 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE II/C (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 619 | 453.56 | 453.56 | 17/03/2022 | 2 | 65.18 | |
| 98 | NADIA | SM/11843 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE V/A (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 4,961 | 989.54 | 1,082.63 | 07/04/2025 | 8 | 1,061.02 | |
| 99 | NADIA | SM/11652 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE IX/A (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 1,172 | 584.81 | 639.47 | 02/10/2024 | 4 | 59.59 | |
| 100 | NADIA | SM/11546 | Augmentation of Ground Water Based Piped Water Supply Scheme for MAGURKHALI to Accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division PHE Dte. | Augmentation | 30/03/2022 | 7,239 | 877.71 | 950.34 | 07/08/2024 | 11 | 799.12 | |
| 101 | NADIA | SM/11551 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE IV/C(NORTHERN SECTOR PART-III) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 30/03/2022 | 1,521 | 855.05 | 965.54 | 04/03/2022 | 2 | 205.40 | |
| 102 | NADIA | SM/12373 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE V/C (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 3,841 | 1,070.96 | 1,189.05 | 26/07/2024 | 6 | 1,118.78 | |
| 103 | NADIA | SM/11650 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE VIII/A (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 425 | 494.24 | 570.37 | 17/03/2022 | 2 | 132.67 | |
| 104 | NADIA | SM/11839 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE III/B (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 331 | 444.35 | 495.29 | 17/03/2022 | 3 | 64.72 | |
| 105 | NADIA | SM/11871 | AUGMENTATION OF GROUND WATER BASED KARIMPURJALANGI PWSS ZONE-X(A) PHASE-II TO ACCOMMODATE FHTC IN KARIMPUR-II BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 20/05/2022 | 150 | 74.58 | 103.51 | 27/01/2025 | 4 | 74.09 | |
| 106 | NADIA | SM/11810 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE V/B (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 3,195 | 999.72 | 1,149.95 | 07/04/2025 | 10 | 1,116.88 | |
| 107 | NADIA | SM/13820 | Indrakpur Piped Water Supply Scheme. | New | 17/07/2020 | 925 | 633.24 | 712.22 | 15/05/2023 | 8 | 251.92 | |
| 108 | NADIA | SM/08056 | Providing Functional House Tap Connection from Dakshin Jhikipota Zone-I Water Supply Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting). | Retrofitting | 08/01/2021 | 1,454 | 100.00 | 100.00 | 13/05/2021 | 4 | 98.30 | |
| 109 | NADIA | SM/15539 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR GAZNA (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 107.81 | 107.81 | 21/05/2024 | 3 | 19.70 | |
| 110 | NADIA | SM/15279 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR HUDA CHAPRA (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 70.34 | 70.34 | 0 | 0.00 | ||
| 111 | NADIA | SM/15281 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR FATEPUR (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 105.41 | 105.41 | 06/02/2025 | 1 | 11.76 | |
| 112 | NADIA | SM/15134 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR PURBA KHAMARSIMULIA (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 115.26 | 115.26 | 23/03/2023 | 2 | 77.13 | |
| 113 | NADIA | SM/15135 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR MONIPOTA (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 102.92 | 102.92 | 23/03/2023 | 1 | 47.83 | |
| 114 | NADIA | SM/15138 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR JOANIA (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 158.22 | 158.22 | 14/12/2023 | 3 | 88.48 | |
| 115 | NADIA | SM/10067 | Augmentation of Ground Water Based Piped Water Supply Scheme For CHAPRA BANGALJHI to Accommodate FHTC in Chapra Block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 22/11/2021 | 2,645 | 1,282.23 | 1,399.34 | 07/06/2023 | 14 | 1,080.63 | |
| 116 | NADIA | SM/17687 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BADKULLA ZONE-II (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 38.06 | 38.06 | 30/10/2023 | 1 | 12.61 | |
| 117 | NADIA | SM/17203 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Ber Ramchandrapur Zone II PWSS (PHASE-II) IN Karimpur I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 59.28 | 59.28 | 21/03/2023 | 3 | 47.90 | |
| 118 | NADIA | SM/17211 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Subarnabihar ZONE-I (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 311.89 | 311.89 | 29/01/2025 | 1 | 51.34 | |
| 119 | NADIA | SM/17212 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Teinpur zone IV PWSS (PHASE-II) IN Karimpur II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 144.45 | 144.45 | 17/10/2023 | 1 | 42.10 | |
| 120 | NADIA | SM/17213 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR PANSILA(PHASE-II) IN NABADWIP BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 165.82 | 165.82 | 17/10/2023 | 1 | 53.53 | |
| 121 | NADIA | SM/07501 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-II, Zone-III within Nakashipara Block (Phase-B) | Retrofitting | 04/12/2020 | 2,036 | 99.98 | 99.98 | 15/01/2021 | 2 | 174.48 | |
| 122 | NADIA | SM/18388 | AUGMENTATION OF INTAKE, WTP & RISING MAIN FOR SURFACE WATER-BASED PIPED WATER SUPPLY SCHEME FOR ARSENIC-AFFECTED AREAS NORTHERN SECTOR (PART I) OF NADIA DISTRICT TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 09/09/2022 | 0 | 7,142.58 | 7,474.85 | 02/10/2024 | 16 | 1,890.06 | |
| 123 | NADIA | SM/11738 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE VI/B (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 246 | 772.43 | 816.60 | 14/09/2023 | 3 | 232.10 | |
| 124 | NADIA | SM/11918 | Augmentation of Ground Water Based Piped Water Supply Scheme for HANSPUKURIA Block: Tehatta-II, Dist: Nadia | Augmentation | 30/03/2022 | 4,377 | 1,277.70 | 1,402.19 | 29/08/2024 | 19 | 1,257.05 | |
| 125 | NADIA | SM/11836 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE I/A (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 615 | 495.40 | 554.27 | 07/09/2023 | 5 | 353.63 | |
| 126 | NADIA | SM/08130 | Providing Functional Household Tap Connection from Kishorpur Water Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting) | Retrofitting | 08/01/2021 | 1,300 | 99.53 | 99.53 | 14/07/2021 | 5 | 197.59 | |
| 127 | NADIA | SM/07435 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-I, Zone-III within Kaliganj Block (Phase-C) | Retrofitting | 04/12/2020 | 2,029 | 100.00 | 100.00 | 13/01/2021 | 3 | 203.31 | |
| 128 | NADIA | SM/07458 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-II, Zone-VIII within Nakashipara Block (Phase-B) | Retrofitting | 04/12/2020 | 2,042 | 99.98 | 99.98 | 18/02/2021 | 5 | 227.73 | |
| 129 | NADIA | SM/08134 | Providing Functional House Tap Connection from Badlangi Padmamala Zone-I Water Supply Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting). | Retrofitting | 08/01/2021 | 1,540 | 99.95 | 99.95 | 13/05/2021 | 8 | 159.62 | |
| 130 | NADIA | SM/07430 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-I, Zone-VIII within Kaliganj Block (Phase-B) | Retrofitting | 04/12/2020 | 2,049 | 100.00 | 100.00 | 13/01/2021 | 6 | 205.69 | |
| 131 | NADIA | SM/07431 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-I, Zone-V within Kaliganj Block (Phase-B) | Retrofitting | 04/12/2020 | 2,058 | 100.00 | 100.00 | 13/01/2021 | 4 | 248.62 | |
| 132 | NADIA | SM/07469 | Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-III, Zone-III within Krishnagar-II Nabadwip (Part) Block (Phase-A). | Retrofitting | 04/12/2020 | 2,028 | 100.00 | 100.00 | 10/02/2021 | 3 | 245.03 | |
| 133 | NADIA | SM/07474 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-I, Zone-IX within Kaliganj Block (Phase-C) | Retrofitting | 04/12/2020 | 2,043 | 100.00 | 100.00 | 14/07/2021 | 2 | 163.32 | |
| 134 | NADIA | SM/07495 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-III, Zone-III within Krishnagar-II, Nabadwip (Part) Block (Phase-B) | Retrofitting | 04/12/2020 | 2,069 | 100.00 | 100.00 | 10/02/2021 | 3 | 188.40 | |
| 135 | NADIA | SM/07502 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-II, Zone-VIII within Nakashipara Block (Phase-A) | Retrofitting | 04/12/2020 | 2,022 | 99.98 | 99.98 | 19/02/2021 | 3 | 229.02 | |
| 136 | NADIA | SM/06995 | Providing Functional House Tap Connection from Fatepur Water Supply Scheme under Jal Swapno Program in Nadia District | Retrofitting | 25/09/2020 | 1,587 | 99.80 | 99.80 | 31/12/2020 | 5 | 111.36 | |
| 137 | NADIA | SM/07004 | Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-V within Kaliganj Block (Phase-A). | Retrofitting | 25/09/2020 | 2,020 | 100.00 | 100.00 | 08/12/2020 | 5 | 108.66 | |
| 138 | NADIA | SM/07834 | Providing Functional House Tap Connection from Bhanderkhola Water Supply Scheme under Jal Swapno Programme (Phase-I) | Retrofitting | 04/12/2020 | 1,484 | 96.10 | 96.10 | 06/01/2021 | 4 | 264.25 | |
| 139 | NADIA | SM/09205 | Augmentation of Ground Water Based Piped Water Supply Scheme for Bablari Dewanganj Water Supply Scheme. | Augmentation | 15/09/2021 | 675 | 436.21 | 465.55 | 26/04/2023 | 8 | 346.26 | |
| 140 | NADIA | SM/08664 | Providing Functional House Tap Connection from Muktadaha Zone-I Water Supply Scheme (Phase-I) of Retrofitting under JalSwapna Program in Nadia District under Nadia Division, P.H.EDte. | Retrofitting | 19/02/2021 | 1,204 | 77.58 | 77.58 | 10/08/2021 | 6 | 89.61 | |
| 141 | NADIA | SM/09538 | Augmentation of Ground WaterBased Piped Water Supply Scheme for BADELANGI PADMAMALA ZONE-I to Accommodate FHTC in Chapra block of Nadia district under Nadia Division,P.H.E Dte. | Augmentation | 08/10/2021 | 1,151 | 511.56 | 555.30 | 21/12/2023 | 8 | 460.34 | |
| 142 | NADIA | SM/10417 | Augmentation of Ground Water Based Piped Water Supply Scheme for GOBRAPOTA to Accommodate FHTC in Krishnagar-I Block of Nadia District under Nadia Division, P.H.E. Dte | Augmentation | 27/01/2022 | 2,796 | 925.16 | 1,016.16 | 10/06/2024 | 8 | 955.92 | |
| 143 | NADIA | SM/08961 | Providing FHTC Surface Water Based Water Supply Scheme(Northern Sector), Part-I, Zone-VI within Kaliganj Block. (Phase-C) | Retrofitting | 19/02/2021 | 4,039 | 226.52 | 226.52 | 18/04/2022 | 5 | 210.26 | |
| 144 | NADIA | SM/10422 | Providing FHTC by Augmentation of Ground Water Based Piped Water Supply Scheme for PURBA KHAMAR SIMULIA Block: Hanskhali, Dist: Nadia | Augmentation | 27/01/2022 | 2,219 | 583.83 | 949.08 | 01/08/2022 | 11 | 828.46 | |
| 145 | NADIA | SM/07497 | Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-II, Zone-V within Nakashipara Block (Phase-A). | Retrofitting | 04/12/2020 | 2,018 | 99.98 | 99.98 | 25/02/2021 | 2 | 160.78 | |
| 146 | NADIA | SM/10524 | Augmentation of Ground Water Based Piped Water Supply Scheme for GANGNAPUR to Accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division PHE Dte. | Augmentation | 17/02/2022 | 3,947 | 609.26 | 730.39 | 05/08/2022 | 8 | 514.34 | |
| 147 | NADIA | SM/09811 | Augmentation of Ground Water Based Piped Water Supply Scheme for BERRAMCHANDRA PUR Zone-I to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 22/11/2021 | 843 | 349.57 | 373.67 | 26/07/2022 | 13 | 291.77 | |
| 148 | NADIA | SM/10688 | PROVIDING FHTC BY AUGMENTATION FOR GOPINATHPUR PWSS BLOCK: TEHATTA - II DISTRICT: NADIA | Augmentation | 17/02/2022 | 9,842 | 1,375.07 | 1,597.04 | 27/09/2022 | 8 | 1,116.90 | |
| 149 | NADIA | SM/10269 | Augmentation of Ground Water Based Piped Water Supply Scheme for BARAIA to Accommodate FHTC in Tehatta-II block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 22/11/2021 | 4,106 | 1,076.00 | 1,164.50 | 22/07/2024 | 20 | 1,115.76 | |
| 150 | NADIA | SM/10597 | Augmentation of Ground Water Based Piped Water Supply Scheme for Tehatatta(Phase-II) to accommodate FHTC in Tehatta-I block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 17/02/2022 | 2,717 | 804.31 | 930.35 | 23/07/2024 | 9 | 639.24 | |
| 151 | NADIA | SM/10595 | Augmentation of Ground Water Based Piped Water Supply Scheme for BARA KULTA to Accommodate FHTC in Ranaghat-I Block of Nadia District under Nadia Division, P.H.E. Dte | Augmentation | 17/02/2022 | 3,204 | 751.53 | 849.86 | 26/05/2025 | 10 | 569.46 | |
| 152 | NADIA | SM/11828 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE I/A (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 2,038 | 709.67 | 709.67 | 21/10/2022 | 3 | 364.78 | |
| 153 | NADIA | SM/11830 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE II/B (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 3,777 | 948.37 | 948.37 | 02/08/2024 | 3 | 187.90 | |
| 154 | NADIA | SM/10429 | Augmentation of Ground Water Based Piped Water Supply Scheme for Bhimpur (Phase-I) to accommodate FHTC in Krishnagar-I block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 27/01/2022 | 3,500 | 732.04 | 732.04 | 26/07/2023 | 4 | 760.26 | |
| 155 | NADIA | SM/11649 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE V/A (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 4,701 | 919.44 | 1,014.27 | 05/08/2024 | 5 | 16,523.45 | |
| 156 | NADIA | SM/11609 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE III/A (NORTHERN SECTOR PART-III) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 30/03/2022 | 1,185 | 772.52 | 869.27 | 02/10/2024 | 3 | 237.84 | |
| 157 | NADIA | SM/11919 | Augmentation of ground water water based Palsonda PWSS to accommodate FHTC in Tehatta-II Block under Tehatta Sub-Division of Nadia Division in Nadia District. | Augmentation | 16/12/2021 | 5,172 | 1,284.44 | 1,367.01 | 17/04/2023 | 9 | 1,232.16 | |
| 158 | NADIA | SM/14063 | Anjangarh Pipe Water Supply Scheme in Ranaghat-I Block of Nadia District | New | 26/09/2022 | 576 | 499.15 | 499.96 | 08/05/2023 | 11 | 443.49 | |
| 159 | NADIA | SM/15537 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR MADHPUR (PHASE-II) IN KARIMPUR-II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 42.22 | 42.22 | 06/01/2023 | 1 | 1.24 | |
| 160 | NADIA | SM/07492 | Retrofitting of Providing FHTC at Ground Water based Ber Ramchandrapur Zone-I Water Supply Scheme within Karimpur-I Block (Phase-1) | Retrofitting | 04/12/2020 | 849 | 56.83 | 56.83 | 07/01/2021 | 3 | 98.23 | |
| 161 | NADIA | SM/09575 | Augmentation of Ground Water Based Piped Water Supply Scheme for PASCHIM BHATJANGLA ZONE-II to Accommodate FHTC in Krishnagar-I block of Nadia district under Nadia division PHE Dte | Augmentation | 08/10/2021 | 197 | 303.01 | 321.47 | 27/02/2023 | 12 | 156.01 | |
| 162 | NADIA | SM/17210 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Senpur (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 339.44 | 339.44 | 21/06/2024 | 2 | 56.99 | |
| 163 | NADIA | SM/18374 | PROVIDING FHTC BY AUGMENTATION FOR FULIA TOWNSHIP (ZONE-II) PWSS, BLOCK: SANTIPUR, DISTRICT: NADIA | Augmentation | 30/09/2022 | 6,974 | 2,245.11 | 2,261.14 | 27/05/2025 | 24 | 1,718.27 | |
| 164 | NADIA | SM/07453 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-III, Zone-II within Krishnagar-II & Nabadwip (Part) Block (Phase-A) | Retrofitting | 04/12/2020 | 2,035 | 100.00 | 100.00 | 10/02/2021 | 3 | 170.92 | |
| 165 | NADIA | SM/10420 | Augmentation of Ground Water Based Habibpur PWSS to accommodate FHTC in Ranaghat-I block with in Nadia District under Nadia Division, PHE Dte. | Augmentation | 27/01/2022 | 3,500 | 594.58 | 594.58 | 13/01/2023 | 6 | 628.81 | |
| 166 | NADIA | SM/10079 | Augmentation of Ground Water Based Piped Water Supply Scheme for BHANDAR KHOLA in Krishnagar I Block with in , Nadia district under Nadia Division | Augmentation | 16/12/2021 | 1,011 | 388.62 | 435.58 | 11/05/2022 | 10 | 451.15 | |
| 167 | NADIA | SM/11835 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE VIII/B (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 876 | 342.25 | 391.78 | 17/03/2022 | 2 | 109.16 | |
| 168 | NADIA | SM/08129 | Providing Functional Household Tap Connection from Fazilnagar Water Scheme under Jal Swapno Programme in Nadia District | Retrofitting | 08/01/2021 | 1,500 | 99.97 | 99.97 | 21/05/2021 | 14 | 155.96 | |
| 169 | NADIA | SM/08133 | Providing Functional House Tap Connection from Baruipara Water Supply Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting). | Retrofitting | 08/01/2021 | 1,690 | 97.75 | 97.75 | 20/07/2021 | 1 | 93.37 | |
| 170 | NADIA | SM/07470 | Providing Functional Household Tap Connection from Banpur Water Scheme (for Banpur & Fulbari Mouzas) under Jal Swapno Programme | Retrofitting | 04/12/2020 | 1,598 | 96.87 | 96.87 | 27/01/2021 | 5 | 142.92 | |
| 171 | NADIA | SM/07471 | Providing Functional Household Tap Connection from Gazna Water Scheme (for Gazna Mouza) under Jal Swapno Programme | Retrofitting | 04/12/2020 | 1,392 | 92.94 | 92.94 | 27/01/2021 | 6 | 273.16 | |
| 172 | NADIA | SM/06997 | Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-I within Kaliganj Block (Phase-B). | Retrofitting | 25/09/2020 | 2,026 | 100.00 | 100.00 | 31/12/2020 | 2 | 101.67 | |
| 173 | NADIA | SM/06998 | Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-IV within Kaliganj Block (Phase-A). | Retrofitting | 25/09/2020 | 2,033 | 100.00 | 100.00 | 31/12/2020 | 2 | 97.39 | |
| 174 | NADIA | SM/06999 | Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-III within Kaliganj Block (Phase-A). | Retrofitting | 25/09/2020 | 2,028 | 99.99 | 99.99 | 08/12/2020 | 4 | 122.54 | |
| 175 | NADIA | SM/09042 | Providing Functional House Tap Connection from Kamalpur ZoneII Water Supply Scheme under Jal Swapna Program in NadiaDistrict under Nadia Division, P.H.E Dte. (Phase-A) | Retrofitting | 19/02/2021 | 784 | 69.79 | 69.79 | 19/09/2023 | 13 | 71.90 | |
| 176 | NADIA | SM/09043 | Providing Functional House Tap Connection from NutangramWater Supply Scheme under Jal Swapna Program in NadiaDistrict under Nadia Division, P.H.E Dte. (Phase-A) | Retrofitting | 19/02/2021 | 711 | 51.30 | 51.30 | 03/11/2021 | 7 | 66.94 | |
| 177 | NADIA | SM/09222 | Providing Functional House Tap Connection from ChapraBangaljhi Water Supply Scheme under Jal Swapna Program inNadia District under Nadia Division, P.H.E Dte. (Phase-I,Retrofitting) | Retrofitting | 19/02/2021 | 6,000 | 301.32 | 301.32 | 03/11/2021 | 3 | 475.14 | |
| 178 | NADIA | SM/09574 | Augmentation of Ground Water Based Piped Water Supply Scheme for DAFARPOTA ZONE-I to Accommodate FHTC in Krishnagar-I block of Nadia District under Nadia Division PHE Dte. | Augmentation | 08/10/2021 | 230 | 338.60 | 513.62 | 30/05/2022 | 11 | 348.45 | |
| 179 | NADIA | SM/09576 | Augmentation of Ground Water Based Piped Water Supply Scheme for Sonda II to accomodate FHTC in Krishnagar I Block of Nadia District under Nadia Division, PHE Dte | Augmentation | 08/10/2021 | 54 | 134.59 | 142.79 | 04/12/2023 | 9 | 73.10 | |
| 180 | NADIA | SM/09033 | Augmentation of Ground Water Based Piped Water Supply Scheme for Karimpur to Accommodate FHTC | Augmentation | 15/09/2021 | 7,500 | 934.08 | 1,000.53 | 30/07/2024 | 10 | 1,105.47 | |
| 181 | NADIA | SM/08953 | Providing FHTC Surface Water Based Water Supply Scheme(Northern Sector), Part-II, Zone-I, II and III within NakashiparaBlock. (Phase-C) | Retrofitting | 19/02/2021 | 4,014 | 246.49 | 246.49 | 15/12/2021 | 8 | 548.98 | |
| 182 | NADIA | SM/08958 | Providing FHTC Surface Water Based Water Supply Scheme(Northern Sector), Part-II, Zone-VI and IX within NakashiparaBlock. (Phase-D) | Retrofitting | 19/02/2021 | 4,068 | 246.85 | 246.85 | 17/12/2021 | 7 | 320.04 | |
| 183 | NADIA | SM/08665 | Providing Functional House Tap Connection from Dafarpota Zone I Water Supply Scheme (Phase-I) of Retrofitting under JalSwapna Program in Nadia District under Nadia Division, P.H.EDte. | Retrofitting | 19/02/2021 | 2,064 | 98.99 | 98.99 | 16/07/2024 | 5 | 112.58 | |
| 184 | NADIA | SM/08669 | Providing FHTC Surface Water Based Water Supply Scheme(Northern Sector), Part-II, Zone-VI within Nakashipara Block.(Phase-C) | Retrofitting | 19/02/2021 | 2,043 | 99.66 | 99.66 | 20/09/2021 | 5 | 144.90 | |
| 185 | NADIA | SM/08674 | Providing Functional House Tap Connection from Dakshinpara Zone-I Water Supply Scheme under Jal Swapna Program in NadiaDistrict under Nadia Division, P.H.E Dte. (Phase-A) | Retrofitting | 19/02/2021 | 1,598 | 99.30 | 99.30 | 20/09/2021 | 5 | 123.05 | |
| 186 | NADIA | SM/09450 | Augmentation of Ground WaterBased Piped Water Supply Scheme for BADELANGI PADMAMALA ZONE-II to Accommodate FHTC in CHAPRA Block of Nadia District under Nadia Division, PHE Dte | Augmentation | 08/10/2021 | 3,645 | 894.36 | 960.78 | 31/07/2024 | 16 | 614.14 | |
| 187 | NADIA | SM/10418 | Augmentation of Ground Water Based Piped Water Supply Scheme for Mahisunra(Phase-I) to accommodate FHTC in Nabadwip block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 27/01/2022 | 2,500 | 432.22 | 432.22 | 05/10/2024 | 7 | 773.48 | |
| 188 | NADIA | SM/10461 | Augmentation of Ground Water Based Piped Water Supply Scheme for Tehatata (Phase-I) to accommodate FHTC in Tehatta-I block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 27/01/2022 | 3,500 | 586.70 | 586.70 | 02/08/2024 | 6 | 858.37 | |
| 189 | NADIA | SM/10462 | Augmentation of Ground Water Based Karimpur-Jalangi PWSS Zone-IX(A) to accommodate FHTC in Karimpur-II block with in Nadia District under Nadia Division, PHE Dte. | Augmentation | 27/01/2022 | 1,512 | 269.33 | 269.33 | 26/07/2022 | 8 | 276.11 | |
| 190 | NADIA | SM/10440 | Augmentation of Ground Water Based Piped Water Supply Scheme for KRISHNAGAR (Rural) to Accommodate FHTC in Krishnagar-I Block of Nadia District under Nadia Division, P.H.E. Dte | Augmentation | 27/01/2022 | 3,792 | 863.61 | 930.57 | 14/10/2022 | 8 | 851.84 | |
| 191 | NADIA | SM/10517 | PROVIDING FHTC BY AUGMENTATION FOR ARABPUR PWSS BLOCK: KARIMPUR - I DISTRICT: NADIA | Augmentation | 17/02/2022 | 1,222 | 300.74 | 326.46 | 20/08/2024 | 6 | 377.75 | |
| 192 | NADIA | SM/10518 | AUGMENTATION OF GROUND WATER BASED TEINPUR (ZONE-IV) PIPED WATER SUPPLY SCHEME TO ACCOMMODATE FHTC IN KARIMPUR-II BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 17/02/2022 | 374 | 184.82 | 206.51 | 10/06/2024 | 6 | 217.08 | |
| 193 | NADIA | SM/10572 | PROVIDING FHTC BY AUGMENTATION FOR MAIDANPUR PWSS BLOCK: CHAPRA DISTRICT: NADIA | Augmentation | 16/03/2022 | 2,212 | 615.73 | 657.64 | 29/11/2021 | 6 | 563.62 | |
| 194 | NADIA | SM/11512 | AUGMENTATION OF GROUND WATER BASED KARIMPUR-JALANGI PWSS ZONE -IXB TO ACCOMMODATE FHTC IN KARIMPUR-II BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 30/03/2022 | 1,117 | 373.47 | 404.03 | 06/12/2024 | 8 | 404.38 | |
| 195 | NADIA | SM/11829 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE I/B (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 2,283 | 997.50 | 997.50 | 17/03/2022 | 2 | 301.32 | |
| 196 | NADIA | SM/11833 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE VII/A (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 924 | 720.08 | 811.64 | 17/03/2022 | 2 | 131.07 | |
| 197 | NADIA | SM/12375 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE VII/B (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 1,421 | 1,387.68 | 1,701.73 | 10/01/2024 | 4 | 1,145.58 | |
| 198 | NADIA | SM/11845 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE VII/A (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 1,047 | 690.61 | 788.40 | 10/06/2024 | 5 | 752.14 | |
| 199 | NADIA | SM/11508 | AUGMENTATION OF GROUND WATER BASED HABIBPUR PWSS PART-II TO ACCOMMODATE FHTC IN RANAGHAT- I BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 30/03/2022 | 4,291 | 451.58 | 581.83 | 11/09/2024 | 10 | 563.62 | |
| 200 | NADIA | SM/14064 | MINI PIPED WATER SUPPLY SCHEME AT GAZNA (PART) VILLAGE, BLOCK- HANSKHALI, DISTRICT NADIA | New | 26/09/2022 | 98 | 50.64 | 50.64 | 11/01/2024 | 1 | 0.60 | |
| 201 | NADIA | SM/15536 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR TOPLA (PHASE-II) IN KARIMPUR-II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 44.52 | 44.52 | 0 | 0.00 | ||
| 202 | NADIA | SM/15538 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR DAKSHINPARA ZONE-II (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 93.58 | 93.58 | 06/02/2025 | 1 | 11.76 | |
| 203 | NADIA | SM/15139 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR DAKSHINPARA ZONE-I (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 106.02 | 106.02 | 13/02/2024 | 3 | 15.90 | |
| 204 | NADIA | SM/17217 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR GHORALIA ZONE-II (PHASE-II) IN SANTIPUR BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 168.61 | 168.61 | 24/04/2023 | 2 | 100.90 | |
| 205 | NADIA | SM/17195 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Teinpur zone I PWSS (PHASE-II) IN Karimpur II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 167.23 | 167.23 | 22/04/2025 | 4 | 153.65 | |
| 206 | NADIA | SM/17207 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Muktadaha zone I (PHASE-II) IN Karimpur I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 295.09 | 295.09 | 04/06/2025 | 1 | 32.62 | |
| 207 | NADIA | SM/18389 | AUGMENTATION OF INTAKE, WTP & RISING MAIN FOR SURFACE WATER-BASED PIPED WATER SUPPLY SCHEME FOR ARSENIC-AFFECTED AREAS NORTHERN SECTOR (PART III) OF NADIA DISTRICT TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 09/09/2022 | 0 | 5,695.65 | 6,047.54 | 02/10/2024 | 3 | 1,311.85 | |
| 208 | NADIA | SM/10473 | AUGMENTATION OF GROUND WATER BASED KARIMPUR-JALANGI ZONE-VIII PWSS TO ACCOMMODATE FHTC IN KARIMPUR-II BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 17/02/2022 | 4,064 | 833.46 | 905.67 | 06/04/2023 | 11 | 821.06 | |
| 209 | NADIA | SM/11507 | Augmentation of Ground Water Based Piped Water Supply Scheme for SUBARNABIHAR ZONE-II to Accommodate FHTC in Krishnagar-I block of Nadia District under Nadia Division PHE Dte | Augmentation | 30/03/2022 | 2,788 | 813.89 | 890.16 | 19/05/2025 | 6 | 829.31 | |
| 210 | NADIA | SM/09789 | Augmentation of Ground Water Based Piped Water Supply Scheme for JOANIA to Accommodate FHTC in Krishnagar-I Block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 22/11/2021 | 697 | 314.33 | 383.52 | 30/08/2022 | 9 | 310.60 | |
| 211 | NADIA | SM/10691 | PROVIDING FHTC BY AUGMENTATION OF PALASHIPARA PWSS BLOCK: TEHATTA-II DISTRICT: NADIA | Augmentation | 17/02/2022 | 5,545 | 1,098.50 | 1,297.42 | 27/07/2024 | 12 | 996.57 | |
| 212 | NADIA | SM/08889 | Proving FHTC (Functional Household Tap Connection ) by retrofitting under Jalswapno with utility shifting of water pipeline in connection to the work under Nadia highway Division I PWD (Roads)Dte along Dharmada-Muragaca Road 3.00 Kmp to 6.00kmp under Surf | Retrofitting | 19/08/2021 | 1,314 | 86.64 | 86.64 | 03/11/2021 | 5 | 157.27 | |
| 213 | NADIA | SM/08127 | Providing Functional Household Tap Connection from Madhugari Water Scheme Phase -I of Retrofitting under Jal Swapno Programme in Nadia District | Retrofitting | 08/01/2021 | 1,100 | 64.46 | 64.46 | 21/05/2021 | 3 | 45.20 | |
| 214 | NADIA | SM/08051 | Providing Functional House Tap Connection from Badlangi Padmamala Zone-II Water Supply Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting). | Retrofitting | 08/01/2021 | 1,448 | 99.71 | 99.71 | 13/05/2021 | 9 | 615.62 | |
| 215 | NADIA | SM/08052 | Providing Functional House Tap Connection from Madhpur Water Supply Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting). | Retrofitting | 08/01/2021 | 1,428 | 79.89 | 79.89 | 30/09/2021 | 4 | 115.82 | |
| 216 | NADIA | SM/08057 | Providing Functional Household Tap Connection from Barakulta Water Supply Scheme (For Byaspur & Takshali Mouzas) under Jal Swapno Program in Nadia District | Retrofitting | 08/01/2021 | 1,455 | 88.93 | 88.93 | 24/05/2021 | 3 | 164.28 | |
| 217 | NADIA | SM/08058 | Providing Functional Household Tap Connection from Dafarpota(Zone-II) water supply scheme under Jal Swapno Program in Nadia District (Phase-II, Retrofitting) | Retrofitting | 08/01/2021 | 331 | 30.23 | 30.23 | 29/07/2021 | 2 | 27.28 | |
| 218 | NADIA | SM/07468 | Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-III, Zone-IV within Krishnagar-II Nabadwip (Part) Block (Phase-A). | Retrofitting | 04/12/2020 | 2,030 | 100.00 | 100.00 | 10/02/2021 | 3 | 194.04 | |
| 219 | NADIA | SM/07472 | Providing Functional House Tap Connection from Pansila Water Supply Scheme under Jal Swapno Programme (Phase-I) | Retrofitting | 04/12/2020 | 1,461 | 97.19 | 97.19 | 12/05/2021 | 5 | 100.29 | |
| 220 | NADIA | SM/07499 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-II, Zone-III within Nakashipara Block (Phase-A) | Retrofitting | 04/12/2020 | 2,026 | 99.98 | 99.98 | 15/01/2021 | 2 | 186.74 | |
| 221 | NADIA | SM/07500 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-II, Zone-II within Nakashipara Block (Phase-A) | Retrofitting | 04/12/2020 | 2,028 | 99.98 | 99.98 | 15/01/2021 | 4 | 644.51 | |
| 222 | NADIA | SM/07505 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-II, Zone-IV within Nakashipara Block (Phase-C) | Retrofitting | 04/12/2020 | 2,033 | 99.98 | 99.98 | 12/12/2023 | 4 | 473.92 | |
| 223 | NADIA | SM/08888 | Proving FHTC (Functional Household Tap Connection ) by retrofitting under Jalswapno with utility shifting of water pipeline in connection to the work under Nadia Highway Division I PWD (Roads)Dte along Dharmada-Muragaca Road 0.00 Kmp to 3.00kmp under Surf | Retrofitting | 19/08/2021 | 1,260 | 127.22 | 127.22 | 22/12/2021 | 3 | 202.42 | |
| 224 | NADIA | SM/09451 | Augmentation of Ground Water Based Piped Water Supply Scheme for DAKSHIN JHITKIPOTA ZONE-II to Accommodate FHTC in Krishnagar-I Block of Nadia District under Nadia Division, P.H.E. Dte | Augmentation | 08/10/2021 | 1,996 | 597.33 | 641.84 | 18/08/2023 | 13 | 732.42 | |
| 225 | NADIA | SM/10414 | Augmentation of Ground Water Based Piped Water Supply Scheme for Betai Zone-I to accommodate FHTC in Tehatta-I block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 27/01/2022 | 4,431 | 999.97 | 1,077.33 | 26/09/2023 | 12 | 1,074.13 | |
| 226 | NADIA | SM/10472 | AUGMENTATION OF GROUND WATER BASED TEINPUR (ZONE-II) PIPED WATER SUPPLY SCHEME TO ACCOMMODATE FHTC IN KARIMPUR-II BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 17/02/2022 | 437 | 577.88 | 632.42 | 10/06/2024 | 12 | 551.69 | |
| 227 | NADIA | SM/10076 | Augmentation of Ground Water Based MAHISBATHAN Piped Water Supply Scheme for Block: Karimpur-II, Dist: Nadia | Augmentation | 16/12/2021 | 3,761 | 996.01 | 1,083.18 | 20/08/2024 | 9 | 810.19 | |
| 228 | NADIA | SM/10034 | Augmentation of Ground Water Based Piped Water Supply Scheme for BETAI ZONE-II to Accommodate FHTC in Tehatta-I Block of Nadia District under Nadia Division,PHE Dte. | Augmentation | 08/10/2021 | 4,095 | 1,048.78 | 1,138.19 | 28/04/2022 | 14 | 1,191.01 | |
| 229 | NADIA | SM/10077 | Augmentation of ground water based Narayanpur PWSS to accommodate FHTC in Karimpur-II Block within Nadia District under Nadia Division | Augmentation | 16/12/2021 | 3,409 | 475.30 | 475.30 | 31/05/2023 | 6 | 923.49 | |
| 230 | NADIA | SM/09091 | Providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapno with shifting of existing PHE Pipeline for implementation of widening and strengthning work of Swarupganj UBI More to Anandabas Road from 0.00 Kmp to 6.10 Kmp under NH D | Retrofitting | 15/09/2021 | 150 | 16.84 | 16.84 | 29/12/2021 | 2 | 13.24 | |
| 231 | NADIA | SM/09093 | Providing FHTC (Functional Household Tap Connection) by retrofitting under Jal Swapno with shifting of existing PHE Pipeline for implementation of widening and strengthening work of Swarupganj UBI More to Anandabas Road from 0.00 Kmp to 6.10 Kmp under NH | Retrofitting | 15/09/2021 | 204 | 46.36 | 46.36 | 13/06/2022 | 5 | 67.21 | |
| 232 | NADIA | SM/09812 | Augmentation of Ground Water Based Piped Water Supply Scheme for UTTAR TAJPUR to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 22/11/2021 | 800 | 299.92 | 324.85 | 24/04/2023 | 18 | 407.92 | |
| 233 | NADIA | SM/10716 | Augmentation of Ground Water Based Piped Water Supply Scheme for Anulia to accommodate FHTC in Ranaghat-I block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 27/01/2022 | 5,681 | 711.03 | 823.49 | 05/08/2022 | 9 | 661.19 | |
| 234 | NADIA | SM/10567 | PROVIDING FHTC BY AUGMENTATION FOR MONIPOTA PWSS BLOCK: KRISHNAGAR - I DISTRICT: NADIA | Augmentation | 16/03/2022 | 1,669 | 371.72 | 457.52 | 22/04/2025 | 15 | 440.77 | |
| 235 | NADIA | SM/11511 | PROVIDING FHTC BY AUGMENTATION FOR TOPLA PWSS BLOCK: KARIMPUR - II DISTRICT: NADIA | Augmentation | 30/03/2022 | 2,988 | 608.20 | 672.12 | 15/05/2025 | 12 | 571.40 | |
| 236 | NADIA | SM/11834 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE VII/B (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 3,027 | 998.09 | 1,123.62 | 17/03/2022 | 2 | 172.84 | |
| 237 | NADIA | SM/11842 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE IV/C (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 1,602 | 987.86 | 1,088.85 | 19/03/2021 | 4 | 124.66 | |
| 238 | NADIA | SM/11740 | PROVIDING FHTC BY AUGMENTATION FOR BAGULA PWSS ZONE-I BLOCK: HANSKHALI DISTRICT: NADIA | Augmentation | 25/04/2022 | 1,750 | 533.99 | 582.14 | 07/05/2025 | 9 | 573.68 | |
| 239 | NADIA | SM/11743 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE VIII/C (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 1,633 | 645.28 | 822.91 | 04/12/2023 | 4 | 352.13 | |
| 240 | NADIA | SM/08954 | Providing FHTC Surface Water Based Water Supply Scheme(Northern Sector), Part-II, Zone-V within Nakashipara Block.(Phase-C) | Retrofitting | 19/02/2021 | 4,020 | 233.69 | 233.69 | 06/12/2021 | 4 | 210.82 | |
| 241 | NADIA | SM/13878 | PROVIDING FHTC BY AUGMENTATION FOR FULIA TOWNSHIP (ZONE-III) PWSS, BLOCK: SANTIPUR, DISTRICT: NADIA | Augmentation | 26/09/2022 | 1,200 | 665.68 | 667.62 | 08/05/2023 | 8 | 462.50 | |
| 242 | NADIA | SM/15136 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAMALPUR ZONE-II (PHASE-II) IN RANAGHAT - II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 98.73 | 98.73 | 31/03/2023 | 1 | 58.65 | |
| 243 | NADIA | SM/15137 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAMALPUR ZONE-I (PHASE-II) IN RANAGHAT - II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 298.28 | 298.28 | 0 | 0.00 | ||
| 244 | NADIA | SM/08957 | Providing FHTC Surface Water Based Water Supply Scheme(Northern Sector), Part-I, Zone-III and IX within Kaliganj Block.(Phase-D) | Retrofitting | 19/02/2021 | 4,031 | 243.16 | 243.16 | 07/06/2024 | 7 | 253.48 | |
| 245 | NADIA | SM/17685 | Gotpara Piped Water Supply Scheme | New | 28/12/2022 | 696 | 304.54 | 304.54 | 17/08/2023 | 6 | 203.08 | |
| 246 | NADIA | SM/17686 | Noachar Piped Water Supply Scheme | New | 28/12/2022 | 378 | 272.77 | 272.77 | 17/08/2023 | 9 | 170.27 | |
| 247 | NADIA | SM/17204 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Uttar Tajpur PWSS (PHASE-II) IN Karimpur II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 184.46 | 184.46 | 13/12/2024 | 2 | 53.64 | |
| 248 | NADIA | SM/17208 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR SONDA ZONE-I IN KRISHNAGAR BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 134.47 | 134.47 | 17/10/2023 | 1 | 41.90 | |
| 249 | NADIA | SM/17209 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Teinpur zone III PWSS (PHASE-II) IN Karimpur II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 202.98 | 202.98 | 21/03/2023 | 2 | 22.81 | |
| 250 | NADIA | SM/17214 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR DAKSHIN JHITKAPOTA ZONE-I (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 237.29 | 237.29 | 13/07/2023 | 3 | 151.55 | |
| 251 | NADIA | SM/17215 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BHANDAR KHOLA (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 137.52 | 137.52 | 06/01/2023 | 2 | 15.80 | |
| 252 | NADIA | SM/17216 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR PASCHIM BHATJUNGLA ZONE-I (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 260.93 | 260.93 | 20/04/2023 | 2 | 174.15 | |
| 253 | NADIA | SM/11742 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE VIII/B (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 1,567 | 461.16 | 511.41 | 26/09/2024 | 5 | 254.36 | |
| 254 | NADIA | SM/11844 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE VI/A (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 570 | 728.34 | 858.86 | 17/03/2022 | 4 | 290.93 | |
| 255 | NADIA | SM/11734 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE IV/A (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 1,457 | 864.52 | 864.52 | 02/10/2024 | 3 | 371.99 | |
| 256 | NADIA | SM/10428 | Providing FHTC by Augmentation for Fatepur PWSS Block: Hanskhali, District: Nadia | Augmentation | 27/01/2022 | 533 | 261.62 | 321.23 | 02/12/2021 | 6 | 290.59 | |
| 257 | NADIA | SM/07455 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-III, Zone-I within Krishnagar & Nabadwip (Part) Block (Phase-A) | Retrofitting | 04/12/2020 | 2,032 | 100.00 | 100.00 | 25/04/2023 | 4 | 191.54 | |
| 258 | NADIA | SM/07476 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-I, Zone-IX within Kaliganj Block (Phase-B) | Retrofitting | 04/12/2020 | 2,038 | 100.00 | 100.00 | 18/04/2022 | 2 | 7.21 | |
| 259 | NADIA | SM/07504 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-II, Zone-VI within Nakashipara Block (Phase-B) | Retrofitting | 04/12/2020 | 2,030 | 99.98 | 99.98 | 25/02/2021 | 4 | 199.33 | |
| 260 | NADIA | SM/09046 | Providing Functional House Tap Connection from Teinpur Zone-IIWater Supply Scheme (Phase-I) of Retrofitting under Jal SwapnaProgram in Nadia District under Nadia Division, P.H.E Dte. | Retrofitting | 19/02/2021 | 1,226 | 79.65 | 79.65 | 03/11/2021 | 4 | 111.13 | |
| 261 | NADIA | SM/09572 | Augmentation of Ground Water Based Piped Water Supply Scheme for NUTANGRAM to Accommodate FHTC in Hanskhali block of Nadia district underNadia division | Augmentation | 08/10/2021 | 880 | 279.22 | 299.47 | 19/11/2024 | 11 | 329.28 | |
| 262 | NADIA | SM/08952 | Providing FHTC Surface Water Based Water Supply Scheme(Northern Sector), Part-II, Zone-VIII within Nakashipara Block.(Phase-C) | Retrofitting | 19/02/2021 | 4,040 | 224.59 | 224.59 | 27/07/2022 | 8 | 2,724.00 | |
| 263 | NADIA | SM/08955 | Providing FHTC Surface Water Based Water Supply Scheme(Northern Sector), Part-I, Zone-VII within Kaliganj Block. (PhaseC) | Retrofitting | 19/02/2021 | 4,037 | 224.62 | 224.62 | 21/12/2021 | 3 | 223.75 | |
| 264 | NADIA | SM/09537 | Augmentation of Ground Water Based Piped Water Supply Scheme for ELANGI ZONE-I to Accommodate FHTC in Chapra Block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 08/10/2021 | 902 | 472.51 | 511.60 | 07/06/2024 | 14 | 254.01 | |
| 265 | NADIA | SM/10413 | Providing FHTC by Augmentation of Payradanga PWSS Block: Hanskhali, District: Nadia | Augmentation | 27/01/2022 | 3,625 | 854.52 | 1,036.03 | 21/10/2022 | 10 | 983.01 | |
| 266 | NADIA | SM/10075 | Augmentation of ground water based Andharkota PWSS to accommodate FHTC in Karimpur-I Block within Nadia District under Nadia Division | Augmentation | 16/12/2021 | 4,425 | 982.88 | 1,056.44 | 09/08/2024 | 10 | 1,035.56 | |
| 267 | NADIA | SM/10084 | Providing FHTC by augmentation for Madhugari water supply scheme with in Karimpur-I Block in Nadia District under Nadia Division P.H.E. Dte. (Phase-II) | Augmentation | 16/12/2021 | 562 | 269.41 | 288.79 | 19/06/2024 | 8 | 276.80 | |
| 268 | NADIA | SM/10068 | Augmentation of Ground Water Based Piped Water Supply Scheme for BHALUKA to Accommodate FHTC in Krishnagar-I block of Nadia District under Nadia Division PHE Dte. | Augmentation | 22/11/2021 | 5,970 | 1,362.27 | 1,504.31 | 25/04/2022 | 10 | 1,439.73 | |
| 269 | NADIA | SM/08960 | Providing FHTC Surface Water Based Water Supply Scheme(Northern Sector), Part-III, Zone-I, II AND III within Krishnagar-II and Nabadwip (Part) Block. (Phase-C) | Retrofitting | 19/02/2021 | 2,069 | 154.50 | 154.50 | 03/11/2021 | 6 | 154.48 | |
| 270 | NADIA | SM/08962 | Providing Functional House Tap Connection from Baraandulia Zone-II Water Supply Scheme under Jal Swapna Program in Nadia District under Nadia Division, P.H.E Dte. (Phase-I,Retrofitting) | Retrofitting | 19/02/2021 | 3,500 | 183.69 | 183.69 | 03/11/2021 | 5 | 229.10 | |
| 271 | NADIA | SM/10522 | AUGMENTATION OF GROUND WATER BASED TEINPUR (ZONE-I) PIPED WATER SUPPLY SCHEME TO ACCOMMODATE FHTC IN KARIMPUR-II BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 17/02/2022 | 199 | 135.84 | 149.80 | 29/07/2022 | 6 | 102.01 | |
| 272 | NADIA | SM/09813 | Augmentation of Ground Water Based Piped Water Supply Scheme for ELANGI ZONE-II to Accommodate FHTC in Chapra Block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 22/11/2021 | 352 | 542.47 | 597.84 | 21/04/2025 | 10 | 619.09 | |
| 273 | NADIA | SM/10569 | PROVIDING FHTC BY AUGMENTATION FOR DAKSHINPARA (ZONE-I) PWSS BLOCK: HANSKHALI DISTRICT: NADIA | Augmentation | 16/03/2022 | 810 | 279.42 | 335.48 | 20/05/2025 | 17 | 395.00 | |
| 274 | NADIA | SM/10019 | Augmentation of Ground Water Based Piped Water Supply Scheme for Dignagar Water Supply Scheme | Augmentation | 15/09/2021 | 5,820 | 1,401.74 | 1,517.88 | 15/05/2023 | 13 | 1,410.55 | |
| 275 | NADIA | SM/07835 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-II, Zone-I within Nakashipara Block (Phase-B) | Retrofitting | 04/12/2020 | 2,046 | 99.98 | 99.98 | 15/01/2021 | 5 | 374.08 | |
| 276 | NADIA | SM/11513 | AUGMENTATION OF GROUND WATER BASED KARIMPUR JALANGI ZONE-VI PWSS TO ACCOMMODATE FHTC IN KARIMPUR-I BLOCK IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 30/03/2022 | 4,041 | 800.97 | 800.97 | 14/07/2023 | 8 | 729.36 | |
| 277 | NADIA | SM/11832 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE III/A (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 1,155 | 769.51 | 769.51 | 17/03/2022 | 2 | 244.66 | |
| 278 | NADIA | SM/12374 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE VI/B (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 3,120 | 1,116.80 | 1,277.87 | 26/09/2024 | 6 | 760.42 | |
| 279 | NADIA | SM/11841 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE IV/B (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 2,032 | 641.56 | 721.97 | 17/03/2022 | 3 | 132.02 | |
| 280 | NADIA | SM/07005 | Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-II within Kaliganj Block (Phase-B). | Retrofitting | 25/09/2020 | 2,032 | 100.00 | 100.00 | 08/12/2020 | 2 | 143.25 | |
| 281 | NADIA | SM/07432 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-III, Zone-IV within Krishnagar-II, Nabadwip (Part) Block (Phase-D) | Retrofitting | 04/12/2020 | 2,054 | 100.00 | 100.00 | 10/02/2021 | 3 | 190.51 | |
| 282 | NADIA | SM/11741 | PROVIDING FHTC BY AUGMENTATION FOR BAGULA PWSS ZONE-II BLOCK: HANSKHALI DISTRICT: NADIA | Augmentation | 25/04/2022 | 12,900 | 911.19 | 975.30 | 29/07/2024 | 10 | 943.20 | |
| 283 | NADIA | SM/11548 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE II(NORTHERN SECTOR PART-III) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 30/03/2022 | 3,221 | 923.44 | 1,052.89 | 19/12/2024 | 9 | 10,525.90 | |
| 284 | NADIA | SM/11610 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE III/B(NORTHERN SECTOR PART-III) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 30/03/2022 | 935 | 631.19 | 684.37 | 04/03/2022 | 2 | 23.78 | |
| 285 | NADIA | SM/12376 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE IX/B (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 3,394 | 1,126.74 | 1,302.83 | 10/01/2024 | 3 | 650.78 | |
| 286 | NADIA | SM/11735 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE IV/B (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 2,012 | 611.06 | 611.06 | 17/03/2022 | 2 | 116.70 | |
| 287 | NADIA | SM/11737 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE VI/A (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 328 | 687.30 | 809.79 | 17/03/2022 | 2 | 265.04 | |
| 288 | NADIA | SM/11925 | PROVIDING FHTC BY AUGMENTATION FOR UDAYPUR PWSS BLOCK: SANTIPUR DISTRICT: NADIA | Augmentation | 20/05/2022 | 2,002 | 869.96 | 1,027.85 | 29/07/2024 | 11 | 915.93 | |
| 289 | NADIA | SM/11870 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE III/B (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 1,328 | 629.94 | 629.94 | 17/03/2022 | 2 | 95.98 | |
| 290 | NADIA | SM/11808 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE II/A (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 1,652 | 443.09 | 518.22 | 07/09/2023 | 6 | 502.21 | |
| 291 | NADIA | SM/09814 | Augmentation of Ground Water Based Piped Water Supply Scheme for BERRAMCHANDRA PUR Zone-II to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 22/11/2021 | 387 | 295.79 | 315.02 | 21/08/2024 | 9 | 288.80 | |
| 292 | NADIA | SM/09573 | Augmentation of Ground Water Based PipedWater Supply Scheme For KISHOREPUR to Accommodate FHTC in Karimpur-II Block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 08/10/2021 | 1,504 | 672.71 | 735.04 | 07/08/2024 | 9 | 554.36 | |
| 293 | NADIA | SM/08132 | Providing Functional House Tap Connection from Paschim Bhatjungla Zone-II Water Supply Scheme under Jal Swapno Programme (Phase-I) Retrofitting in Nadia District | Retrofitting | 08/01/2021 | 1,212 | 81.74 | 81.74 | 21/05/2021 | 6 | 98.54 | |
| 294 | NADIA | SM/15540 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR MAHISHNENGRA ZONE-I (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 145.63 | 145.63 | 17/02/2023 | 1 | 14.03 | |
| 295 | NADIA | SM/15541 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BAGULA ZONE-II (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 52.07 | 52.07 | 23/03/2023 | 1 | 48.99 | |
| 296 | NADIA | SM/16182 | Char Brahmanagar Piped Water Supply Scheme.(JJM Revision) | New | 10/02/2021 | 4,545 | 1,382.20 | 1,514.03 | 20/08/2024 | 12 | 1,353.93 | |
| 297 | NADIA | SM/08131 | Providing Functional House Tap Connection from Bankar Dhopadi Water Supply Scheme under Jal Swapno Programme (Phase-I) Retrofitting in Nadia District | Retrofitting | 08/01/2021 | 1,192 | 82.48 | 82.48 | 29/07/2021 | 4 | 152.26 | |
| 298 | NADIA | SM/08670 | Providing FHTC Surface Water Based Water Supply Scheme(Northern Sector), Part-II, Zone-IV within Nakashipara Block.(Phase-D) | Retrofitting | 19/02/2021 | 2,028 | 125.15 | 125.15 | 20/09/2021 | 3 | 110.23 | |
| 299 | NADIA | SM/17232 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KULGACHHI (PHASE-II) IN KRISHNAGAR-I BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 128.78 | 128.78 | 17/10/2023 | 2 | 49.99 | |
| 300 | NADIA | SM/17218 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR GHORALIA ZONE-I (PHASE-II) IN SANTIPUR BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 187.00 | 187.00 | 24/04/2023 | 3 | 56.49 | |
| 301 | NADIA | SM/17219 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BANKAR DHOPADI IN NABADWIP BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 147.11 | 147.11 | 16/03/2023 | 2 | 56.24 | |
| 302 | NADIA | SM/17202 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR Fazilnagar PWSS (PHASE-II) IN Karimpur II BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 218.44 | 218.44 | 22/03/2023 | 5 | 111.24 | |
| 303 | NADIA | SM/17688 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BAGULA ZONE-I (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 76.13 | 76.13 | 30/10/2023 | 1 | 12.60 | |
| 304 | NADIA | SM/11547 | Augmentation of Ground Water Based Piped Water Supply Scheme for NASERKHULI ZONE-II to Accommodate FHTC in Ranaghat-II Block of Nadia District under Nadia Division, P.H.E. Dte | Augmentation | 30/03/2022 | 2,987 | 605.20 | 656.96 | 13/09/2024 | 6 | 427.49 | |
| 305 | NADIA | SM/09817 | Providing FHTC by Augmentation under Jal Swapna for HUDA CHAPRA Piped Water Supply Scheme in Hanskhali block of Nadia district under Nadia Division, PHE Dte | Augmentation | 22/11/2021 | 84 | 298.65 | 319.28 | 05/08/2024 | 7 | 264.60 | |
| 306 | NADIA | SM/08125 | Providing Functional Household Tap Connection from Monipota Water Scheme (for Bishnupur & Raotara Mouzas) under Jal Swapno Programme in Nadia District | Retrofitting | 08/01/2021 | 1,319 | 95.37 | 95.37 | 24/05/2021 | 3 | 193.27 | |
| 307 | NADIA | SM/08126 | Providing Functional Household Tap Connection from Joania Water Scheme (for Hazrapole, Kursi, Joania & Malipota Mouzas) under Jal Swapno Programme in Nadia District | Retrofitting | 08/01/2021 | 1,347 | 96.18 | 96.18 | 24/05/2021 | 3 | 162.83 | |
| 308 | NADIA | SM/07434 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-III, Zone-I within Krishnagar-II, Nabadwip (Part) Block (Phase-B) | Retrofitting | 04/12/2020 | 2,060 | 100.00 | 100.00 | 10/02/2021 | 3 | 181.86 | |
| 309 | NADIA | SM/07418 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-I, Zone-VIII within Kaliganj Block [Phase-A] | Retrofitting | 04/12/2020 | 2,020 | 100.00 | 100.00 | 31/12/2020 | 3 | 177.54 | |
| 310 | NADIA | SM/07454 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-III, Zone-IV within Krishnagar- II & Nabadwip (Part) Block (Phase-B) | Retrofitting | 04/12/2020 | 1,996 | 100.00 | 100.00 | 10/02/2021 | 2 | 148.96 | |
| 311 | NADIA | SM/08137 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-II, Zone-IX within Nakashipara Block (Phase-C) | Retrofitting | 08/01/2021 | 2,035 | 99.77 | 99.77 | 19/02/2021 | 5 | 202.02 | |
| 312 | NADIA | SM/08050 | Providing Functional House Tap Connection from Paschim Bhatjungla Zone-I Water Supply Scheme under Jal Swapno Programme (Phase-I) Retrofitting in Nadia District | Retrofitting | 08/01/2021 | 1,800 | 99.99 | 99.99 | 21/05/2021 | 6 | 141.86 | |
| 313 | NADIA | SM/08054 | Providing Functional House Tap Connection from Subernabehar Water Supply Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting). | Retrofitting | 08/01/2021 | 1,414 | 100.00 | 100.00 | 10/06/2021 | 6 | 121.04 | |
| 314 | NADIA | SM/07473 | Providing Functional House Tap Connection from Arabpur Water Supply Scheme under Jal Swapno Programme (Phase-I) | Retrofitting | 04/12/2020 | 1,600 | 99.50 | 99.50 | 22/01/2021 | 8 | 196.10 | |
| 315 | NADIA | SM/07475 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-III, Zone-IV within Krishnagar-II & Nabadwip (Part) Block (Phase-C) | Retrofitting | 04/12/2020 | 2,078 | 100.00 | 100.00 | 10/02/2021 | 2 | 162.12 | |
| 316 | NADIA | SM/07489 | Retrofitting of Providing FHTC at Ground Water based Elangi Water Supply Scheme Zone-1(Phase-1) | Retrofitting | 04/12/2020 | 1,500 | 99.69 | 99.69 | 07/01/2021 | 2 | 100.57 | |
| 317 | NADIA | SM/07493 | Providing Functional House Tap Connection for Topla Water Supply Scheme under Jal Swapno Programme (Phase-I) | Retrofitting | 04/12/2020 | 1,440 | 99.92 | 99.92 | 22/01/2021 | 6 | 127.95 | |
| 318 | NADIA | SM/07498 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-II, Zone-IV within Nakashipara Block (Phase-B) | Retrofitting | 04/12/2020 | 2,024 | 99.98 | 99.98 | 15/01/2021 | 5 | 486.72 | |
| 319 | NADIA | SM/07503 | Providing FHTC at Surface Water based Water Supply Scheme (Northern Sector), Part-II, Zone-V within Nakashipara Block (Phase-B) | Retrofitting | 04/12/2020 | 2,033 | 99.98 | 99.98 | 28/04/2023 | 6 | 198.51 | |
| 320 | NADIA | SM/07000 | Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-III within Kaliganj Block (Phase-B). | Retrofitting | 25/09/2020 | 2,023 | 100.00 | 100.00 | 08/12/2020 | 4 | 105.85 | |
| 321 | NADIA | SM/09223 | Gadigachha Piped Water Supply Scheme. | New | 10/02/2021 | 3,760 | 1,302.70 | 1,436.91 | 14/07/2023 | 10 | 796.31 | |
| 322 | NADIA | SM/08887 | Providing FHTC Surface Water Based Water Supply Scheme (Northern Sector) Part-II Zone-II within Nakashipara Block (Phase-B) | Retrofitting | 19/08/2021 | 2,041 | 99.67 | 99.67 | 30/05/2023 | 6 | 184.92 | |
| 323 | NADIA | SM/08668 | Providing FHTC Surface Water Based Water Supply Scheme(Northern Sector), Part-I, Zone-V and VIII within Kaliganj Block.(Phase-C) | Retrofitting | 19/02/2021 | 2,035 | 130.32 | 130.32 | 20/09/2021 | 5 | 122.87 | |
| 324 | NADIA | SM/10074 | Providing FHTC by augmentation under Jal Swapna for Shyamnagar PWSS | Augmentation | 16/12/2021 | 3,906 | 962.92 | 1,034.65 | 21/09/2023 | 12 | 1,056.76 | |
| 325 | NADIA | SM/10082 | Providing FHTC by augmentation under Jal Swapna for Fazil Nagar PWSS in Karimpur-II Block with in Nadia District under Nadia Division,PHE Dte. | Augmentation | 16/12/2021 | 2,892 | 508.91 | 544.75 | 05/05/2022 | 10 | 585.68 | |
| 326 | NADIA | SM/10037 | Augmentation of Ground Water Based Piped Water Supply Scheme for BARA ANDULIA ZONE-I to Accommodate FHTC in CHAPRA Block of Nadia District under Nadia Division, PHE Dte | Augmentation | 22/11/2021 | 1,437 | 1,189.42 | 1,316.45 | 10/05/2022 | 10 | 1,282.43 | |
| 327 | NADIA | SM/10525 | Augmentation of Ground Water Based Piped Water Supply Scheme for KAMALPUR ZONE-I to Accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division PHE Dte. | Augmentation | 17/02/2022 | 4,812 | 989.36 | 1,233.18 | 22/05/2025 | 12 | 946.25 | |
| 328 | NADIA | SM/10268 | Augmentation of Ground Water Based Piped Water Supply Scheme for BARA ANDULIA ZONE-II to Accommodate FHTC in CHAPRA Block of Nadia District under Nadia Division, PHE Dte.. | Augmentation | 22/11/2021 | 1,770 | 1,050.93 | 1,160.64 | 26/07/2023 | 8 | 1,056.85 | |
| 329 | NADIA | SM/07490 | Providing FHTC at Ground Water based Senpur Water Supply Scheme within Krishnagar-1 Block (Phase-1) of Retrofitting. | Retrofitting | 04/12/2020 | 1,400 | 99.86 | 99.86 | 12/07/2022 | 3 | 168.64 | |
| 330 | NADIA | SM/10568 | PROVIDING FHTC BY AUGMENTATION FOR BANPUR PWSS BLOCK: KRISHNAGANJ DISTRICT: NADIA | Augmentation | 16/03/2022 | 1,372 | 301.98 | 417.48 | 19/09/2022 | 10 | 243.38 | |
| 331 | NADIA | SM/10596 | Augmentation of Ground Water Based Piped Water Supply Scheme for KAMALPUR ZONE-II to Accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division PHE Dte. | Augmentation | 17/02/2022 | 210 | 191.12 | 243.76 | 19/11/2024 | 7 | 145.72 | |
| 332 | NADIA | SM/11840 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE IV/A (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 1,271 | 746.67 | 880.25 | 07/09/2023 | 4 | 341.99 | |
| 333 | NADIA | SM/11611 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE IV/A (NORTHERN SECTOR PART-III) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 30/03/2022 | 2,102 | 998.89 | 1,113.05 | 02/10/2024 | 4 | 118.65 | |
| 334 | NADIA | SM/11550 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE IV/B(NORTHERN SECTOR PART-III) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 30/03/2022 | 2,157 | 858.82 | 973.91 | 04/03/2022 | 2 | 220.09 | |
| 335 | NADIA | SM/11608 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE I/A (NORTHERN SECTOR PART-III) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 30/03/2022 | 1,760 | 825.10 | 937.42 | 05/10/2024 | 4 | 315.39 | |
| 336 | NADIA | SM/12363 | PROVIDING FHTC BY AUGMENTATION FOR TUNGI PWSS BLOCK: KRISHNAGANJ DISTRICT: NADIA | Augmentation | 30/03/2022 | 5,819 | 1,166.95 | 1,257.83 | 10/08/2023 | 11 | 1,275.45 | |
| 337 | NADIA | SM/11736 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE V/B (NORTHERN SECTOR PART-I) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 531 | 911.04 | 1,047.20 | 17/03/2022 | 2 | 297.39 | |
| 338 | NADIA | SM/11838 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE II/B (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 2,662 | 992.30 | 1,072.62 | 18/06/2025 | 5 | 625.92 | |
| 339 | NADIA | SM/11872 | AUGMENTATION OF GROUND WATER BASED KARIMPURJALANGI PWSS ZONE-X(B) PHASE-II TO ACCOMMODATE FHTC IN KARIMPUR-II BLOCK WITH IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 20/05/2022 | 150 | 164.04 | 193.28 | 13/01/2025 | 3 | 167.95 | |
| 340 | NADIA | SM/10078 | Augmentation of Ground Water Based Piped Water Supply Scheme for KULGACHHI in KRISHNAGAR-I Block with in Nadia district under Nadia Division | Augmentation | 16/12/2021 | 783 | 443.31 | 483.42 | 10/04/2023 | 10 | 428.67 | |
| 341 | NADIA | SM/15520 | SANDHA PIPED WATER SUPPLY SCHEME BLOCK- KRISHNANAGAR-I, DIST - NADIA | New | 30/09/2022 | 1,953 | 671.53 | 672.13 | 15/05/2023 | 9 | 532.06 | |
| 342 | NADIA | SM/15522 | PROVIDING FHTC BY AUGMENTATION FOR FULIA TOWNSHIP (ZONE-I) PWSS, BLOCK: SANTIPUR, DISTRICT: NADIA | Augmentation | 26/09/2022 | 4,179 | 1,563.79 | 1,566.48 | 09/08/2023 | 15 | 1,192.80 | |
| 343 | NADIA | SM/09799 | Augmentation of Ground Water Based Piped Water Supply Scheme for Krishnaganj Majhdia to Accommodate FHTC in Krishnaganj Block of Nadia District under Nadia Division, PHE Dte. | Augmentation | 22/11/2021 | 2,046 | 921.41 | 1,007.89 | 10/06/2024 | 17 | 1,056.69 | |
| 344 | NADIA | SM/15277 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR PAIRADANGA (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 98.48 | 98.48 | 26/09/2024 | 5 | 118.06 | |
| 345 | NADIA | SM/15278 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR NUTANGRAM (PHASE-II) IN HANSKHALI BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 16/11/2022 | 0 | 41.06 | 41.06 | 0 | 0.00 | ||
| 346 | NADIA | SM/08663 | Providing Functional House Tap Connection from Teinpur Zone-III Water Supply Scheme (Phase-I) of Retrofitting under Jal Swapna Program in Nadia District under Nadia Division, P.H.E Dte. | Retrofitting | 19/02/2021 | 1,600 | 96.60 | 96.60 | 15/09/2021 | 5 | 107.01 | |
| 347 | NADIA | SM/17689 | AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR UDAYPUR (PHASE-II) IN SANTIPUR BLOCK OF NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE. | Augmentation | 28/12/2022 | 0 | 76.13 | 76.13 | 30/10/2023 | 1 | 12.74 | |
| 348 | NADIA | SM/18387 | AUGMENTATION OF INTAKE, WTP & RISING MAIN FOR SURFACE WATER-BASED PIPED WATER SUPPLY SCHEME FOR ARSENIC-AFFECTED AREAS NORTHERN SECTOR (PART II) OF NADIA DISTRICT TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 09/09/2022 | 0 | 8,479.55 | 9,157.58 | 02/10/2024 | 16 | 8,643.74 | |
| 349 | NADIA | SM/09206 | Augmentation of Ground Water Based Piped Water Supply Scheme for Dafarpota-II water supply Scheme. | Augmentation | 15/09/2021 | 432 | 164.88 | 176.11 | 21/12/2022 | 10 | 191.73 | |
| 350 | NADIA | SM/11651 | SURFACE WATER BASED W/S SCHEME FOR ARSENIC AFFECTED AREAS OF NADIA DISTRICT ZONE VIII/A (NORTHERN SECTOR PART-II) TO ACCOMMODATE FHTC UNDER NADIA DIVISION | Augmentation | 25/04/2022 | 865 | 480.15 | 541.48 | 23/07/2025 | 5 | 2,325.98 | |
| 351 | NADIA | SM/09525 | Retrofitting of Ground Water Based Piped Water Supply Scheme For Sonda I to accommodate FHTC in Krishnagar I Block of Nadia District under Nadia Division, PHE Dte. | Retrofitting | 08/10/2021 | 217 | 188.23 | 200.44 | 13/07/2023 | 8 | 229.58 | |
| 352 | NADIA | SM/13039 | AUGMENTATION OF GROUND WATER BASED DOGACHI PWSS TO ACCOMMODATE FHTC IN KARIMPUR-II BLOCK IN NADIA DISTRICT UNDER NADIA DIVISION, PHE DTE | Augmentation | 30/03/2022 | 5,620 | 1,379.27 | 1,529.18 | 08/04/2025 | 22 | 1,553.10 | |
| 353 | NADIA | SM/07002 | Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-II within Kaliganj Block (Phase-A). | Retrofitting | 25/09/2020 | 2,030 | 100.00 | 100.00 | 08/12/2020 | 3 | 141.80 | |
| 354 | NADIA | SM/11956 | Collection of Information and subsequent Geo tagging of various newly installed drinking water sources for successful water quality monitoring and surveillance through Integrated Water Quality Management Information System (IWQ-MIS) for District Specific | Support | 05/07/2022 | 0 | 4.58 | 4.58 | 05/12/2022 | 1 | 4.39 | |
| 355 | NADIA | SM/13526 | Detailed field study and data acquisition of different components of Distribution System, Transmission main (raw and clear water) and Household Connection lines along with all valves and other relevant information of Piped Water Supply Schemes under Nadia | Support | 09/09/2022 | 0 | 49.83 | 49.83 | 23/12/2022 | 1 | 48.32 | |
| 356 | NADIA | Orientation cum workshop for PRI functionaries / VWSC members and awareness generation / IEC activities under Jal Jeevan Mission (JJM) Support Activities at Nadia District, under Nadia Division, PHE Dte. | Support | 22/10/2024 | 0 | 99.22 | 0.00 | 0 | 0.00 | |||
| 357 | NADIA | SM/06873 | Providing consultancy services including supply of necessary instruments, chemicals and glass ware for NABL Accreditation of Nadia District Water Testing Laboratory, Kalyani. | Support | 28/08/2020 | 0 | 19.58 | 19.58 | 08/07/2021 | 4 | 18.14 | |
| 358 | NADIA | SM/10400 | Supply, Delivery, Installation of Computer and Peripheral for the Official Use under The Office of the Executive Engineer Nadia Division and Different Sub-Division Offices under Nadia Division, PHE Dte. | Support | 17/02/2022 | 0 | 35.49 | 35.49 | 05/07/2022 | 12 | 36.56 | |
| 359 | NADIA | SM/14142 | SUPPLY, COMMISSIONING & MONITORING OF INTELLIGENT DISINFECTION SYSTEMS FOR FREE COMPLETE DISINFECTION OF DRINKING WATER SUPPLIED THROUGH PIPED WATER SUPPLY SCHEMES WITH MONITORING OF DOSAGE STRENGTH FOR ADDITIONAL 4 NOS AT BARAKULTA WATER SUPPLY SCHEME UN | Support | 26/09/2022 | 0 | 10.07 | 10.07 | 0 | 0.00 | ||
| 360 | NADIA | SM/13312 | Feasibility study for identification of suitable location of proposed intake for drawl of 30.08 MLD Raw water from river Bhagirathi at Nakashipara block for water supply project at Northern Sector (Part-II) in Nadia District under PHED, Govt Of West Benga | Support | 26/09/2022 | 0 | 54.23 | 54.23 | 03/01/2023 | 1 | 52.65 | |
| 361 | NADIA | SM/19066 | Operational charges of PHED & NGO Managed Drinking Water Testing Laboratories under Nadia Division, PHE Dte, related to Water Quality Monitoring & Surveillance under Jal Jeevan Mission | Support | 17/08/2023 | 0 | 183.60 | 183.60 | 24/04/2024 | 24 | 69.20 | |
| 362 | NADIA | SM/19064 | Supply, Delivery and Installation of Computer & peripherals (Phase-II) for the official use under office of the Executive Engineer Nadia Division, under Nadia Division, P.H.E. Dte. | Support | 17/08/2023 | 0 | 54.06 | 54.06 | 30/04/2024 | 42 | 29.47 | |
| 363 | NADIA | SM/12848 | Information Education Communication (IEC) Activities related to judicious & safe use of drinking water, water conservation, water quality issues Under Jal Jeevan Mission (JJM) Support Activities | Support | 22/08/2022 | 0 | 154.07 | 154.07 | 27/07/2022 | 2 | 62.82 | |
| 364 | NADIA | SM/08971 | Field Level Survey of different Schools and AWC by GPs enable Mobile App for uploading this data at IMIS Website in Nadia District. | Support | 19/08/2021 | 0 | 12.78 | 12.78 | 23/11/2021 | 1 | 12.78 | |
| 365 | NADIA | SM/09024 | Drinking water sample collection & testing through Field Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme under JJM. | Support | 19/08/2021 | 0 | 26.79 | 26.79 | 27/03/2023 | 6 | 26.05 | |
| 366 | NADIA | SM/08970 | Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Nadia District. | Support | 19/08/2021 | 0 | 272.39 | 272.39 | 0 | 0.00 | ||
| 367 | NADIA | SM/06631 | Annual Procurement of Chemical, Consumables, Glassware & AMC of Computers, Printers, UPS, Atomic Absorption Spectrophotometer of different water testing laboratories under Nadia Division PHE Dte. | Support | 05/11/2019 | 0 | 92.35 | 92.35 | 08/02/2023 | 27 | 99.29 | |
| 368 | NADIA | SM/19256 | Upgradation and Maintenance of Integrated Water Quality Management Information System (IWQ-MIS) for District Specific Dashboard of Nadia in collaboration with Maintaining of a technology-based Management Information System for Water Quality testing of pot | Support | 09/03/2024 | 0 | 78.48 | 78.48 | 29/10/2024 | 1 | 75.89 | |
| 369 | NADIA | SM/19246 | Proposal of Engagement of Additional Manpower as Project Management & Monitoring Specialist at DPMU of Nadia District under Jal Jeevan Mission (JJM). | Support | 09/03/2024 | 0 | 37.20 | 37.20 | 0 | 0.00 | ||
| 370 | NADIA | SM/11522 | Operational charges of PHED & NGO Managed Water Testing Laboratories under Nadia Division, PHE Dte related to Water Quality Monitoring & Survillance under Jal Jeevan Mission. | Support | 20/05/2022 | 0 | 68.50 | 68.50 | 12/05/2023 | 114 | 70.19 | |
| 371 | NADIA | SM/11400 | Upgradation and Maintenance of Integrated WQMIS for District Specific Dashboard of Nadia in collaboration with Designing & Development of a technology-based Management Information System for WQ testing of potable water supplied through FHTCs by means of p | Support | 25/04/2022 | 0 | 78.02 | 78.02 | 29/09/2022 | 2 | 79.40 | |
| 372 | NADIA | SM/18273 | Collection, Testing & Uploading Charges of Drinking Water Samples through Field Test Kits (FTKs) In Nadia District (Phase-II) Related to Water Quality Monitoring & Surveillance Programme Under Jal Jeevan Mission | Support | 10/03/2023 | 0 | 127.51 | 127.51 | 17/07/2024 | 9 | 118.81 | |
| 373 | NADIA | SM/07011 | Collection of household details as prescribed format through mobile app/hard copy including Geo-reference at different Ground Water Based Piped W/S Scheme under Krishnagar Sub-Division and Tehatta Sub-Division | Support | 25/09/2020 | 0 | 87.93 | 87.93 | 07/09/2021 | 6 | 87.82 | |
| 374 | NADIA | SM/07012 | Collection of household details through Mobile App/hard copy including Geo-Reference at Nadia Northern Sector(P-1,2&3) and different Ground Water Based Piped W/S Scheme under Ranaghat Sub-Division | Support | 25/09/2020 | 0 | 99.44 | 99.44 | 30/04/2021 | 11 | 99.44 | |
| 375 | NADIA | SM/10401 | Annual Procurement of Chemicals, Consumables, Glassware, Instruments & AMC of Computers, Printers, UPS, Atomic Absorption Spectrophotometer of Different Water Testing Laboratories under Nadia Division, PHE Dte. | Support | 17/02/2022 | 0 | 78.65 | 78.65 | 02/06/2023 | 16 | 52.43 | |
| 376 | NADIA | SM/10614 | Development of IT Network of Active Devices for LAN & WLAN along with EPABX System, CCTV Surveillance System, Conference Room Audio System for Nadia Division, Public Health Engineering Directorate, Govt. of West Bengal | Support | 16/03/2022 | 0 | 80.93 | 80.93 | 13/05/2022 | 2 | 147.33 | |
| 377 | NADIA | SM/12844 | SUPPLY, COMMISSIONING & MONITORING OF INTELLIGENT DISINFECTION SYSTEMS FOR FREE COMPLETE DISINFECTION OF DRINKING WATER SUPPLIED THROUGH PIPED WATER SUPPLY SCHEMES WITH MONITORING OF DOSAGE STRENGTH AT BARAKULTA WATER SUPPLY SCHEME UNDER NADIA DIVISION, P | Support | 22/08/2022 | 0 | 2.52 | 2.52 | 05/01/2023 | 1 | 12.58 | |
| 378 | NADIA | SM/19027 | Upgradation and Maintenance of Integrated Water Quality Management Information System (IWQ-MIS) for District Specific Dashboard of Nadia in collaboration with Maintaining of a technology-based Management Information System for Water Quality testing of pot | Support | 17/08/2023 | 0 | 78.48 | 78.48 | 31/10/2023 | 1 | 75.36 | |
| Total | 6,84,325 | 1,68,915.71 | 1,83,089.50 | # | 2,451 | 1,75,726.38 | ||||||