Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 182.63 81.45 44.6  
1 NADIA Nadia Division Providing Functional House Tap Connection from Elangi Zone-II Water Supply Scheme (Phase-I) of Retrofitting under Jal Swapno Programme in Nadia District , SM/08128 Retrofitting Route survey, Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by retrofitting under Jal Swapna for Fulia Township W/S Scheme in Santipur Block of Nadia District under Nadia Division, P.H.E. Dte. Assistant Engineer ORD/000437/2021-2022 1057/RSD 02/12/2021 30 HORIZEN 3.31 3.18 96.07 0
2 NADIA Nadia Division Providing Functional House Tap Connection from Elangi Zone-II Water Supply Scheme (Phase-I) of Retrofitting under Jal Swapno Programme in Nadia District , SM/08128 Retrofitting Material Requisition To Resource Division RTOR000111/2021-2022 1034/ND 03/03/2022 0 Resource Division 1.94 0.00 0 0
3 NADIA Nadia Division Providing Functional House Tap Connection from Elangi Zone-II Water Supply Scheme (Phase-I) of Retrofitting under Jal Swapno Programme in Nadia District , SM/08128 Retrofitting Material Requisition To Resource Division RTOR000047/2021-2022 432/ND 31/01/2022 0 Resource Division 0.60 0.00 0 0
4 NADIA Nadia Division Providing Functional House Tap Connection from Elangi Zone-II Water Supply Scheme (Phase-I) of Retrofitting under Jal Swapno Programme in Nadia District , SM/08128 Retrofitting Scheme Information Board at various water supply schemes under Nadia Division, P.H.E. Dte. Assistant Engineer Junior Engineer 2 ORD/000490/2023-2024 283/ND 11/01/2024 60 BIBHAS PAL 96.01 0.18 0.19 81
5 NADIA Nadia Division Providing Functional House Tap Connection from Elangi Zone-II Water Supply Scheme (Phase-I) of Retrofitting under Jal Swapno Programme in Nadia District , SM/08128 Retrofitting Providing functional household tap connection (Part) including supply of 15mm dia PVC pipe of average length of 15 m, 10mm dia Gun-Metal Ferrule, Saddle piece (as required size) 15mm dia Bib cock etc. all complete from Elangi Zone - II W/S scheme (Phase - I) of Retrofitting in Nadia District under Nadia Division P.H.E. Dte." (PART- A) Assistant Engineer ORD/000110/2021-2022 2910/ND 23/07/2021 60 CHOWDHURY CONSTRUCTION 36.18 30.83 85.21 100
6 NADIA Nadia Division Providing Functional House Tap Connection from Elangi Zone-II Water Supply Scheme (Phase-I) of Retrofitting under Jal Swapno Programme in Nadia District , SM/08128 Retrofitting Providing functional household tap connection (Part) including supply of 15mm dia PVC pipe of average length of 15 m, 10mm dia Gun-Metal Ferrule, Saddle piece (as required size) 15mm dia Bib cock etc. all complete from Elangi Zone - II W/S scheme (Phase - I) of Retrofitting in Nadia District under Nadia Division P.H.E. Dte." (PART- B) Assistant Engineer ORD/000111/2021-2022 2911/ND 23/07/2021 60 CHOWDHURY CONSTRUCTION 36.15 30.80 85.2 100
7 NADIA Nadia Division Providing Functional House Tap Connection from Elangi Zone-II Water Supply Scheme (Phase-I) of Retrofitting under Jal Swapno Programme in Nadia District , SM/08128 Retrofitting Providing functional household tap connection (Part) including supply of 15mm dia PVC pipe of average length of 15 m, 10mm dia Gun-Metal Ferrule, Saddle piece (as required size) 15mm dia Bib cock etc. all complete from Elangi Zone - II W/S scheme (Phase - I) of Retrofitting in Nadia District under Nadia Division P.H.E. Dte." (PART- C) Assistant Engineer ORD/000061/2021-2022 2392/ND 10/06/2021 45 A.K.ADHIKARY 8.44 16.46 195.02 100
Total 182.62 81.46 44.61