Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 1,310.07 425.61 32.49  
1 NADIA Nadia Division Augmentation of ground water water based Palsonda PWSS to accommodate FHTC in Tehatta-II Block under Tehatta Sub-Division of Nadia Division in Nadia District. , SM/11919 Augmentation Route survey, Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by retrofitting under Jal Swapna for Palsunda W/S Scheme in Tehatta-II Block of Nadia District under Nadia Division, P.H.E. Dte. Assistant Engineer ORD/000393/2021-2022 308/TSD 24/11/2021 30 RADIANT 3.08 2.95 95.78 100
2 NADIA Nadia Division Augmentation of ground water water based Palsonda PWSS to accommodate FHTC in Tehatta-II Block under Tehatta Sub-Division of Nadia Division in Nadia District. , SM/11919 Augmentation Material Requisition To Resource Division RTOR000046/2023-2024 1908/ND 27/04/2023 0 Resource Division 144.56 0.00 0 0
3 NADIA Nadia Division Augmentation of ground water water based Palsonda PWSS to accommodate FHTC in Tehatta-II Block under Tehatta Sub-Division of Nadia Division in Nadia District. , SM/11919 Augmentation Material Requisition To Resource Division RTOR000091/2023-2024 2300/ND 29/05/2023 0 Resource Division 31.86 0.00 0 0
4 NADIA Nadia Division Augmentation of ground water water based Palsonda PWSS to accommodate FHTC in Tehatta-II Block under Tehatta Sub-Division of Nadia Division in Nadia District. , SM/11919 Augmentation Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 120 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Polsunda to accommodate FHTC within Tehatta-II block under Nadia Division, P.H.E. Dte. Assistant Engineer Junior Engineer 1 ORD/000085/2024-2025 4191/ND 31/07/2024 180 MONDAL ENTERPRISE 297.09 0.00 0 0
5 NADIA Nadia Division Augmentation of ground water water based Palsonda PWSS to accommodate FHTC in Tehatta-II Block under Tehatta Sub-Division of Nadia Division in Nadia District. , SM/11919 Augmentation Making barbed wire fencing with concrete pillars at Polsunda water supply scheme (New Land)H.W.Site under Tehatta Sub-Division under Nadia Division PHE Dte. in JJM project . Junior Engineer 1,Junior Engineer 2 ORD/000724/2023-2024 1116/TSD 21/02/2024 7 PRABIR KUMAR ROY 2.94 2.84 96.6 100
6 NADIA Nadia Division Augmentation of ground water water based Palsonda PWSS to accommodate FHTC in Tehatta-II Block under Tehatta Sub-Division of Nadia Division in Nadia District. , SM/11919 Augmentation Laying of 63mm dia UPVC Pipe line for Revision of drawing to accommodate FHTC & Construction of Jhama Bats Road for the approach way to headwork site of Palsunda water supply scheme under Kalyani Sub Division I under Nadia Division P.H.Engineering Dte. Assistant Engineer Junior Engineer 1 ORD/000048/2024-2025 3454/ND 20/06/2024 60 MONDAL ENTERPRISE 54.50 54.32 99.67 98
7 NADIA Nadia Division Augmentation of ground water water based Palsonda PWSS to accommodate FHTC in Tehatta-II Block under Tehatta Sub-Division of Nadia Division in Nadia District. , SM/11919 Augmentation Lying distribution system for providing FHTC at Palsunda Mouza in connection with Augmentation of Ground Based Water Supply Scheme at Palsunda to accommodate FHTC under Nadia Division, PHE Dte. Assistant Engineer Junior Engineer 1 ORD/000049/2024-2025 3455/ND 20/06/2024 90 MONDAL ENTERPRISE 96.94 25.86 26.68 100
8 NADIA Eastern Mechanical Augmentation of ground water water based Palsonda PWSS to accommodate FHTC in Tehatta-II Block under Tehatta Sub-Division of Nadia Division in Nadia District. , SM/11919 Augmentation Quotation charges and security deposit for new power connection at Palsunda-III head worksite under Eastern Mechanical Subdivision-III, Nadia BILL/02261/2024-2025 BP-183 13/12/2024 0 W.B.S.E.D.C.L (PANCHDHARA ABHAYNAGAR C.C.C) 7.79 0.00 0 0
9 NADIA Eastern Mechanical Augmentation of ground water water based Palsonda PWSS to accommodate FHTC in Tehatta-II Block under Tehatta Sub-Division of Nadia Division in Nadia District. , SM/11919 Augmentation Supply, Delivery & Installation of Submersible Pumping Machinery alongwith allied Electro-Mechanical works, Voltage Stabilizer, Automatic Chlorinator etc Augmentation to Accommodate FHTC under KARIMPUR JALANGI(Z-8) W/S Scheme, Block- Karimpur II, PALSONDHA W/S Scheme, Block- Tehatta II, & MAIDANPUR W/S Scheme, Block- Chapra, Dist. - Nadia. NIET No.- 33 of EE/EMD of 2022-23 (Sl. No.- 06) Assistant Engineer Junior Engineer ORD/001923/2022-2023 1179/EMD 21/03/2023 940 CREATIVE WATER & PROCESS TECHNOLOGIES PVT. LTD. 77.90 0.00 0 85
10 NADIA Nadia Division Augmentation of ground water water based Palsonda PWSS to accommodate FHTC in Tehatta-II Block under Tehatta Sub-Division of Nadia Division in Nadia District. , SM/11919 Augmentation Laying of Distribution System including specials, valves & pipe carrying structure, Proposed augmentation of Rising Main system, Providing FHTC including supplying, laying, fitting, fixing of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16) pipe with all necessary specials, saddle piece etc., Construction of 650 Cum Capacity 20 Mtr. Height RCC Over Head Reservoir (Including Pile Foundation), Pipe Connection and Cost of Pipes, Specials and Soil Investigation for determination the safe bearing capacity and other relevant parameters of soil for construction of OHR all complete for Augmentation of Ground Based Water Supply Scheme at Palsunda to accommodate FHTC under Tehatta Sub-Divn under Nadia Divn, PHE Dte. Assistant Engineer Junior Engineer 1,Junior Engineer 2 ORD/000014/2023-2024 1720/ND 17/04/2023 1096 MONDAL ENTERPRISE, MASJID BARI ROAD,UTTAR BALURIA, P.O.NABAPALLY, P.S. BARASAT NORTH 24 PGS. 593.41 339.64 57.24 45
Total 1,310.06 425.60 32.49