| Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 3 | 38.01 | 0 | 0 | ||||||||||||||
| 1 | NADIA | Nadia Division | Providing Functional House Tap Connection from Sonda (Zone-II) Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07487 | Retrofitting | PROVIDING FHTC AT SURFACE BASED W/S SCHEME AT SONDA Z-1 | VCH/001063/2020-2021 | 459/DW | 30/03/2021 | 0 | BIDYUT KUMAR | 17.23 | 0.00 | 0 | 0 | |||
| 2 | NADIA | Nadia Division | Providing Functional House Tap Connection from Sonda (Zone-II) Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07487 | Retrofitting | Providing functional household tap connection (Part) including supply of 15mm dia PVC pipe of average length of 15 m, 10mm dia Gun-Metal Ferrule, Saddle piece (as required size) 15mm dia Bib cock etc. all complete from Sonda (Zone-II) W/S scheme in Nadia District under Nadia Division P.H.E. Dte. (Phase-I, Retrofitting) | Assistant Engineer | ORD/000214/2020-2021 | 4041/ND | 30/12/2020 | 60 | BIDYUT KUMAR | 20.48 | 0.00 | 0 | 0 | ||
| 3 | NADIA | Nadia Division | Providing Functional House Tap Connection from Sonda (Zone-II) Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07487 | Retrofitting | Material Requisition To Resource Division | RTOR000093/2021-2022 | 790/ND | 18/02/2022 | 0 | Resource Division | 0.30 | 0.00 | 0 | 0 | |||
| Total | 38.01 | 0.00 | 0 | ||||||||||||||