Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 203.08 12.23 6.02  
1 NADIA Nakashipara Nadia Division Gotpara Piped Water Supply Scheme , SM/17685 New Route Survey, Design Drawing & DPR preparation for Gotpara water supply scheme under Debagram Sub- Division under Nadia Division, PHE Dte. Assistant Engineer ORD/000319/2023-2024 319/DSD 17/08/2023 15 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD 2.28 2.28 100 100
2 NADIA Nakashipara Eastern Mechanical Gotpara Piped Water Supply Scheme , SM/17685 New Providing And Installation of Electro_Mechanical Equipments and Allied Works for Arsenic Removal Plant at GOTPARA Piped Water Supply Scheme Block_ Nakashipara Dist. - Nadia under EMD, PHE Dte. Assistant Engineer ORD/002821/2023-2024 811/EMD 11/03/2024 30 R.N.S. TRADING 42.44 0.00 0 0
3 NADIA Nakashipara Nadia Division Gotpara Piped Water Supply Scheme , SM/17685 New Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of capacity 10 m3/hr at Gotpara Water Supply Scheme within Nakashipara Block under Debagram Sub-Divn. under Nadia Division, P.H.E. Dte. Assistant Engineer ORD/000790/2023-2024 1901/ND 15/03/2024 180 MAHAVIR PUMPS MANUFACTURING PVT. LTD. 132.89 0.00 0 0
4 NADIA Nakashipara Nadia Division Gotpara Piped Water Supply Scheme , SM/17685 New Sinking of 1 No. 250mm. X 150mm. Dia 200 Mtr. deep Tube Well by Direct Rotary Rig Method using UPVC pipe having 250 mm Dia 48 Mtr. Long Housing Pipe & 150 mm. Dia Well Pipe & Deep Well Screen Pipe (RDS Strainer) at Gotpara Pipe Water Supply Scheme, at Nakashipara Block under Debagram Sub-Division under Nadia Division, PHE Dte. Assistant Engineer Junior Engineer 3 ORD/000387/2023-2024 5117/ND 17/11/2023 30 B.M. ENGINEERING & CONSTRUCTION 11.88 9.95 83.75 100
5 NADIA Nakashipara Nadia Division Gotpara Piped Water Supply Scheme , SM/17685 New Material Requisition To Resource Division RTOR000161/2023-2024 276/ND 11/01/2024 0 Resource Division 4.29 0.00 0 0
6 NADIA Nakashipara Eastern Mechanical Gotpara Piped Water Supply Scheme , SM/17685 New Quotation for New Connection at PH-I under Goat Para W/S Scheme under EMSD-III,PHE Dte. BILL/01079/2024-2025 BP-68-24-25 15/07/2024 0 WBSEDCL BETHUADAHARI (NORTH) CCC 9.30 0.00 0 0
Total 203.08 12.24 6.02