Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 196.1 17.49 8.92  
1 NADIA Nadia Division Providing Functional House Tap Connection from Arabpur Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07473 Retrofitting Providing Functional House Tap Connection from Arabpur Water Supply Scheme under Jal Swapno Programme (Phase-I) VCH/000062/2021-2022 12/04/2021 0 CHANDAN ROY 14.57 0.00 0 0
2 NADIA Nadia Division Providing Functional House Tap Connection from Arabpur Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07473 Retrofitting use Tap Connection from Arabpur Water Supply Scheme under Jal Swapno Programme (Phase-I) VCH/000063/2021-2022 12/04/2021 0 USHA CONSTRUCTION 20.02 0.00 0 0
3 NADIA Nadia Division Providing Functional House Tap Connection from Arabpur Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07473 Retrofitting PROVIDING FHTC INCLUDING SUPPLY OF 15MM DIA PVC PIPE OF AVERAGE LENGTH OF 15MM 10MM DIA GUN- METAL FERRULE SADDLE PICE AS REQUIRED SIZE 15MM DIA BIB COCK ETC. ALL COMPLETE AT ARABPUR W/S SCHEME PHASE-1, PART-B, RETROFITTING, UNDER NADIA DIVISION, PHE , DTE. VCH/000212/2021-2022 68/PPMS 15/07/2021 0 USHA CONSTRUCTION 20.02 0.00 0 0
4 NADIA Nadia Division Providing Functional House Tap Connection from Arabpur Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07473 Retrofitting PROVIDING FHTC INCLUDING SUPPLY OF 15MM DIA PVC PIPE OF AVERAGE LENGTH OF 15MM 10MM DIA GUN- METAL FERRULE SADDLE PICE AS REQUIRED SIZE 15MM DIA BIB COCK ETC. ALL COMPLETE AT ARABPUR W/S SCHEME PHASE-1, PART-A,RETROFITTING UNDER NADIA DIVISION, PHE , DTE. VCH/000213/2021-2022 79/PPMS 15/07/2021 0 CHANDAN ROY 14.57 0.00 0 0
5 NADIA Nadia Division Providing Functional House Tap Connection from Arabpur Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07473 Retrofitting Providing Functional House Tap Connection from Arabpur Water Supply Scheme under Jal Swapno Programme (Phase-I) VCH/000485/2021-2022 287/PFMS 08/10/2021 0 CHANDAN ROY 8.50 0.00 0 0
6 NADIA Nadia Division Providing Functional House Tap Connection from Arabpur Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07473 Retrofitting Providing Functional House Tap Connection from Arabpur Water Supply Scheme under Jal Swapno Programme (Phase-I) VCH/000487/2021-2022 289/PFMS 08/10/2021 0 SANJIB DEY 12.00 0.00 0 0
7 NADIA Nadia Division Providing Functional House Tap Connection from Arabpur Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07473 Retrofitting Providing Functional House Tap Connection from Arabpur Water Supply Scheme under Jal Swapno Programme (Phase-I) VCH/000061/2021-2022 78/PFMS 15/07/2021 0 SANJIB DEY 9.86 0.00 0 0
8 NADIA Nadia Division Providing Functional House Tap Connection from Arabpur Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07473 Retrofitting Providing functional household tap connection (Part) including supply of 15mm dia PVC pipe of average length of 15 m, 10mm dia Gun-Metal Ferrule, Saddle piece (as required size) 15mm dia Bib cock etc. all complete for Arabpur W/S scheme in Nadia District under Nadia Division P.H.E. Dte."(Phase-I Retro fitting)(PART-B) Assistant Engineer ORD/000328/2020-2021 402/ND 22/01/2021 45 USHA CONSTRUCTION 32.19 8.48 26.34 0
9 NADIA Nadia Division Providing Functional House Tap Connection from Arabpur Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07473 Retrofitting Providing functional household tap connection (Part) including supply of 15mm dia PVC pipe of average length of 15 m, 10mm dia Gun-Metal Ferrule, Saddle piece (as required size) 15mm dia Bib cock etc. all complete for Arabpur W/S scheme in Nadia District under Nadia Division P.H.E. Dte."(Phase-I Retro fitting)(PART-A) Assistant Engineer ORD/000326/2020-2021 401/ND 22/01/2021 45 CHANDAN ROY 32.17 3.76 11.69 0
10 NADIA Nadia Division Providing Functional House Tap Connection from Arabpur Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07473 Retrofitting Providing functional household tap connection (Part) including supply of 15mm dia PVC pipe of average length of 15 m, 10mm dia Gun-Metal Ferrule, Saddle piece (as required size) 15mm dia Bib cock etc. all complete for Arabpur W/S scheme in Nadia District under Nadia Division P.H.E. Dte."(Phase-I Retro fitting)(PART-C) Assistant Engineer ORD/000329/2020-2021 403/ND 22/01/2021 45 SANJIB DEY 32.20 5.25 16.3 0
Total 196.10 17.49 8.92