Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 1,712.22 596.85 34.86  
1 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for BARUIPARA to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. , SM/11815 Augmentation Name of Work : Route survey, Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by retrofitting under Jal Swapna for Baruipara W/S Scheme in Karimpur-I Block of Nadia District under Nadia Division, P.H.E. Dte. Assistant Engineer ORD/000368/2021-2022 289/TSD 24/11/2021 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD 4.82 4.82 100 100
2 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for BARUIPARA to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. , SM/11815 Augmentation Material Requisition To Resource Division RTOR000058/2022-2023 4307/ND 29/09/2022 0 Resource Division 41.46 0.00 0 0
3 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for BARUIPARA to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. , SM/11815 Augmentation Material Requisition To Resource Division RTOR000007/2023-2024 1850/ND 26/04/2023 0 Resource Division 56.81 0.00 0 0
4 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for BARUIPARA to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. , SM/11815 Augmentation Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 174 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Baruipara to accommodate FHTC within Karimpur-I block under Tehatta Sub-division under Nadia Division, P.H.E. Dte. Assistant Engineer ORD/000086/2024-2025 4192/ND 31/07/2024 180 MONDAL ENTERPRISE 381.95 0.00 0 0
5 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for BARUIPARA to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. , SM/11815 Augmentation Construction and installation of MANIFOLD and allied works at OHR site under Baruipara Ground Based Water Supply Scheme under Karimpur-I Block under Nadia Division,P.H.E Dte. in connection with Providing FHTC (Functional Household Tap Connection) under Jal Jeevan Mission(JJM) for Baruipara at Karimpur-I Block by Augmentation of Ground Water based PWSS for Baruipara Water Supply Schemes under Nadia Division, PHE Dte. Assistant Engineer ORD/000638/2024-2025 7364/ND 18/12/2024 60 M/S ARATI ENTERPRISE 23.38 0.00 0 0
6 NADIA Central Drilling Augmentation of Ground Water Based Piped Water Supply Scheme for BARUIPARA to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. , SM/11815 Augmentation Providing drilling crew and other allied works for construction of Tube Well ( 300mm X200mm X 250 Mtrs. Depth) by utilising Departmental Machineries for Baruipara W/S Scheme (T/W-I) , Karimpur-I Block under Nadia District, Central Drilling Division, P.H.E. Dte.(2ed Call) Driller In Charge Junior Engineer ORD/000092/2023-2024 507/CDD 01/06/2023 303 UNIVERSAL ENTERPRISES 18.86 14.69 77.89 100
7 NADIA Eastern Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for BARUIPARA to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. , SM/11815 Augmentation Quotation charges for new service connection and security deposit at Baruipara PH-IV under EMSD-III,Nadia BILL/02256/2024-2025 BP-182 13/12/2024 0 WBSEDCL KARIMPUR CCC 3.86 0.00 0 0
8 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for BARUIPARA to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. , SM/11815 Augmentation Laying of Distribution System including specials, valves & pipe carrying structure all complete, Proposed augmentation of Rising Main system and Providing FHTC including supplying, laying, fitting, fixing of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16) pipe with all necessary specials, saddle piece etc. all complete for Augmentation of Ground Based Water Supply Scheme at Baruipara to accommodate FHTC under Tehatta Sub-Divn under Nadia Divn, PHE Dte. Assistant Engineer Junior Engineer 1 ORD/000132/2022-2023 3798/ND 02/09/2022 1260 M/S S.S ENTERPRISE 732.02 577.34 78.87 74
9 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for BARUIPARA to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. , SM/11815 Augmentation Construction Of Pump House (3.6x 3.0m) Including Sanitary Arrangement and consruction of Boundary wall at 4th Tube Well Site of Baruipara Water Supply Scheme Under Tehatta Sub-Division PHE Dte. Assistant Engineer Junior Engineer 1 ORD/000751/2023-2024 1626/ND 07/03/2024 450 BISHAL CONSTRUCTION 10.94 0.00 0 100
10 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for BARUIPARA to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. , SM/11815 Augmentation Laying pipe line for distribution system and rising main for Baruipara PWSS under augmentation of Baruipara PWSS under Tehatta Sub-Division PHE Dte. Assistant Engineer Junior Engineer 1 ORD/000474/2024-2025 7262/ND 13/12/2024 270 M/S S.S ENTERPRISE 54.36 0.00 0 0
11 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for BARUIPARA to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. , SM/11815 Augmentation Providing FHTC & Alied Pipelines and other Works for left out habitation under Karimpur -I Block under Tehatta Sub-Division under Nadia Division, PHE Dte. Assistant Engineer ORD/000792/2024-2025 7464/ND 20/12/2024 90 APURBA MANDAL 299.14 0.00 0 0
12 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for BARUIPARA to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. , SM/11815 Augmentation Additional pipeline for increasing Functionality in Basatipara, Mojlishpur and Borojangal villages through MANIFOLD under Karimpur-I Block under Tehatta Sub Division under Nadia Division-,P.H.E Dte. under Jal Jeevan Mission(JJM). Assistant Engineer Junior Engineer Karimpur- II Block ORD/000158/2025-2026 3256/ND 10/07/2025 180 GOPAL KIRTYANIYA 15.51 0.00 0 20
13 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for BARUIPARA to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. , SM/11815 Augmentation Laying of additional pipe lines and allied works to increase the functionality in Brojonathpur, Gandhina villages under Karimpur-I Block under Nadia Division, PHE Dte. Assistant Engineer Junior Engineer Karimpur- II Block ORD/000328/2025-2026 4685/4533/P-3/ND 09/10/2025 90 JOY HIND TUBEWELL'S 46.30 0.00 0 0
14 NADIA Eastern Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for BARUIPARA to Accommodate FHTC in Karimpur-I Block of Nadia District under Nadia Division, PHE Dte. , SM/11815 Augmentation Supply, Delivery Installation of Submersible Pumping Machinery alongwith allied Electro Mechanical works, Voltage Stabilizer, Automatic Chlorinator etc. rejuvenation to Accomodate FHTC at Pump House No. I,II III under Baruipara WS Scheme, Block Karimpur I, Dist. Nadia. NIET No.- 23 of EE/EMD of 2022-23 (Sl. No.-13) Assistant Engineer Junior Engineer ORD/000893/2022-2023 161-EMD 06/01/2023 726 P.K. ENGINEERING 22.81 0.00 0 100
Total 1,712.23 596.85 34.86