Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 1,105.45 382.24 34.58  
1 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for Karimpur to Accommodate FHTC , SM/09033 Augmentation Material Requisition To Resource Division RTOR000004/2021-2022 7048/ND 06/12/2021 0 Resource Division 35.82 0.00 0 0
2 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for Karimpur to Accommodate FHTC , SM/09033 Augmentation Material Requisition To Resource Division RTOR000083/2021-2022 785/ND 18/02/2022 0 Resource Division 16.47 0.00 0 0
3 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for Karimpur to Accommodate FHTC , SM/09033 Augmentation Wall Writing Work under Nadia Division P. H. Engineering Dte. Assistant Engineer Junior Engineer 2 ORD/000769/2023-2024 1821/ND 14/03/2024 31 IMAGIN 34.21 14.06 41.1 60
4 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for Karimpur to Accommodate FHTC , SM/09033 Augmentation Continuation work for Wall Writing Work under Nadia Division P. H. Engineering Dte. Assistant Engineer Junior Engineer 2 ORD/000254/2024-2025 6305/ND 26/09/2024 30 IMAGIN 34.21 0.00 0 100
5 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for Karimpur to Accommodate FHTC , SM/09033 Augmentation Providing functional household tap connection (Part) including supply of 15mm dia PVC pipe of average length of 15 m, 10mm dia Gun-Metal Ferrule, Saddle piece (as required size) 15mm dia Bib cock etc. all complete for Karimpur W/S scheme in Nadia District under Nadia Division P.H.E. Dte."(Phase-1 Retro fitting) " Assistant Engineer Junior Engineer 1,Junior Engineer 2 ORD/000602/2021-2022 350/ND 25/01/2022 1080 TARUN KUMAR BHATTACHARYA 404.96 363.29 89.71 100
6 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for Karimpur to Accommodate FHTC , SM/09033 Augmentation Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 206 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Karimpur to accommodate FHTC within Karimpur-I block under Tehatta Sub-division under Nadia Division, P.H.E. Dte. Assistant Engineer Junior Engineer 1 ORD/000081/2024-2025 4166/ND 30/07/2024 360 HARBAUER INDIA (P) LTD. 444.71 0.00 0 30
7 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for Karimpur to Accommodate FHTC , SM/09033 Augmentation Laying of Distribution System including specials, valves & pipe carrying structure all complete, Proposed augmentation of Rising Main system and Providing FHTC including supplying, laying, fitting, fixing of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16) pipe with all necessary specials, saddle piece etc. all complete for Augmentation of Ground Based Water Supply Scheme (Phase- II) at Karimpur W/S to accommodate FHTC under Tehatta Sub-Divn under Nadia Divn, PHE Dte. Assistant Engineer ORD/000793/2024-2025 7465/ND 20/12/2024 90 CHOWDHURY & CO. 128.29 0.00 0 0
8 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for Karimpur to Accommodate FHTC , SM/09033 Augmentation Route survey, Design of distribution network for providing FHTC (Functional House Hold Tap Connection) by Augmentation under Patabukahuda, Natna & Uttampur villages in Karimpur-I Block of Nadia District under Nadia Division, P.H.E. Dte. Junior Engineer 1,Junior Engineer 2 ORD/000152/2025-2026 240/TSD 02/05/2025 30 ENVIROTECH SOLUTIONS 0.96 0.00 0 100
9 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for Karimpur to Accommodate FHTC , SM/09033 Augmentation Route survey, Design of distribution network for providing FHTC (Functional House Hold Tap Connection) by Augmentation under Karimpur & Abhaypur villages in Karimpur-I Block of Nadia District under Nadia Division, P.H.E. Dte. Junior Engineer 1,Junior Engineer 2 ORD/000150/2025-2026 239/TSD 02/05/2025 30 ENVIROTECH SOLUTIONS 0.93 0.00 0 100
10 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for Karimpur to Accommodate FHTC , SM/09033 Augmentation Charges of entry of household data in JJM website along with Household Aadhar details and Geo-tagging the same along with a hard copy of the same in requisite format supplied by the department. Assistant Engineer ORD/000759/2021-2022 289/Kly SD-I 31/03/2022 90 SUMAN CHAKRABORTY 4.89 4.89 100 100
Total 1,105.47 382.23 34.58