Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 670.64 5.39 0.8  
1 NADIA Nadia Division PROVIDING FHTC BY AUGMENTATION FOR BAGULA PWSS ZONE-I BLOCK: HANSKHALI DISTRICT: NADIA , SM/11740 Augmentation Route survey, Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by retrofitting under Jal Swapna for Bagula Zone-I W/S Scheme in Hanskhali Block of Nadia District under Nadia Division, P.H.E. Dte. Assistant Engineer ORD/000429/2021-2022 1049/RSD 02/12/2021 30 HORIZEN 3.01 2.59 86.05 100
2 NADIA Nadia Division PROVIDING FHTC BY AUGMENTATION FOR BAGULA PWSS ZONE-I BLOCK: HANSKHALI DISTRICT: NADIA , SM/11740 Augmentation Material Requisition To Resource Division RTOR000019/2023-2024 1864/ND 26/04/2023 0 Resource Division 58.87 0.00 0 0
3 NADIA Nadia Division PROVIDING FHTC BY AUGMENTATION FOR BAGULA PWSS ZONE-I BLOCK: HANSKHALI DISTRICT: NADIA , SM/11740 Augmentation Installation of Har Ghar Jal (HGJ) Display Board at different Villages under various PWSS under Nadia Division, P.H.E. Dte. Assistant Engineer Junior Engineer 2 ORD/000419/2023-2024 5349/ND 01/12/2023 60 IMAGIN 96.97 2.80 2.89 40
4 NADIA Nadia Division PROVIDING FHTC BY AUGMENTATION FOR BAGULA PWSS ZONE-I BLOCK: HANSKHALI DISTRICT: NADIA , SM/11740 Augmentation Construction of Arsenic-Cum-Iron Removal Plant (AIRP) of 50 cum/Hour capacity for Augmentation of Ground Based Water Supply Scheme at Bagula Zone-I to accommodate FHTC within Hanskhali block under Ranaghat Sub-division under Nadia Division, P.H.E. Dte. Assistant Engineer ORD/000107/2024-2025 4341/ND 07/08/2024 180 AMIT KUMAR BOSE 181.56 0.00 0 0
5 NADIA Nadia Division PROVIDING FHTC BY AUGMENTATION FOR BAGULA PWSS ZONE-I BLOCK: HANSKHALI DISTRICT: NADIA , SM/11740 Augmentation Material Requisition To Resource Division RTOR000137/2023-2024 255/ND 11/01/2024 0 Resource Division 10.78 0.00 0 0
6 NADIA Nadia Division PROVIDING FHTC BY AUGMENTATION FOR BAGULA PWSS ZONE-I BLOCK: HANSKHALI DISTRICT: NADIA , SM/11740 Augmentation Material Requisition To Resource Division RTOR000007/2024-2025 7563/ND 27/12/2024 0 Resource Division 31.61 0.00 0 0
7 NADIA Nadia Division PROVIDING FHTC BY AUGMENTATION FOR BAGULA PWSS ZONE-I BLOCK: HANSKHALI DISTRICT: NADIA , SM/11740 Augmentation Providing functional household tap connection including supplying, laying, fitting, fixing of 15mm NB PVC (Schedule 80)/20mm OD HDPE (PE100, PN16) pipe with all necessary specials, saddle piece etc., Construction of 250 cum capacity 20 Mtr. staging height RCC Over Head Reservoir, pipe connection and cost of pipes, specials and Soil Investigation for Construction of OHR all complete for augmentation of Ground Water Based Water Supply Scheme for Bagula Zone-I to accommodate FHTC in Hanskhali block of Nadia District under Nadia Division P.H.Engineering Dte. Assistant Engineer Junior Engineer 3 ORD/000148/2023-2024 3215/ND 26/07/2023 1096 BANERJEE CONSTRUCTION, RAJA RAM MOHAN PALLY,BARASAT, KOLKATA-700124 222.67 0.00 0 65
8 NADIA Nadia Division PROVIDING FHTC BY AUGMENTATION FOR BAGULA PWSS ZONE-I BLOCK: HANSKHALI DISTRICT: NADIA , SM/11740 Augmentation Construction of 55.0 m Boundary Wall (2.5m panel) having 200X200mm R.C.C. Column footing (1.0X1.0m) with 125mm thick brick panel wall and 200x300 RCC beam at GL including M.S gate at Bagula Zone-I PWSS 2nd Tube Well site. Assistant Engineer Junior Engineer 3 ORD/000794/2024-2025 84/RSD 14/01/2025 75 B P ENTERPRISE 4.87 0.00 0 0
9 NADIA Nadia Division PROVIDING FHTC BY AUGMENTATION FOR BAGULA PWSS ZONE-I BLOCK: HANSKHALI DISTRICT: NADIA , SM/11740 Augmentation Construction of Pile foundation, Pile Cap, Padestal, Tie Beam for Construction of 250 cum capacity 20 Mtr. staging height RCC Over Head Reservoir for BAGULA ZONE-I Piped Water Supply scheme under Nadia Division P.H.E. Dte. in the District of Nadia Assistant Engineer Junior Engineer 3 ORD/000038/2025-2026 2175/ND 07/05/2025 90 BANERJEE CONSTRUCTION 50.80 0.00 0 100
10 NADIA Nadia Division PROVIDING FHTC BY AUGMENTATION FOR BAGULA PWSS ZONE-I BLOCK: HANSKHALI DISTRICT: NADIA , SM/11740 Augmentation Construction of 111.60 m Boundary Wall(2.5m panel) having 200X200mm R.C.C. Column footing (1.0X1.0m) with 125mm thick brick panel wall and 200x300 RCC beam at GL including M.S gate at Bagula Zone-I PWSS 1st Tube Well site under Ranaghat Sub -Division in Nadia District under Nadia Division P.H.Engineering Dte. Assistant Engineer ORD/000751/2024-2025 459/ND 29/01/2025 90 BUDDHADEV MONDAL 9.50 0.00 0 0
Total 670.65 5.38 0.8