Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 125.69 87.15 69.34  
1 NADIA Nadia Division Providing Functional House Tap Connection from Subernabehar Water Supply Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting). , SM/08054 Retrofitting Providing Functional House Tap Connection from Subernabehar Water Supply Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting). VCH/000475/2021-2022 288/PFMS 08/10/2021 0 M/S S.S ENTERPRISE 21.54 0.00 0 0
2 NADIA Nadia Division Providing Functional House Tap Connection from Subernabehar Water Supply Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting). , SM/08054 Retrofitting PROVIDING FHTC AT SURFACE WATER BASED WATER SUPPLY AT SUBERNABIHAR W/S , PHASE-1 VCH/000885/2021-2022 482/PFMS 03/02/2022 0 SHYAMAL SHIL 3.94 0.00 0 0
3 NADIA Nadia Division Providing Functional House Tap Connection from Subernabehar Water Supply Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting). , SM/08054 Retrofitting Providing functional household tap connection (Part) including supply of 15mm dia PVC pipe of average length of 15 m, 10mm dia Gun-Metal Ferrule, Saddle piece (as required size) 15mm dia Bib cock etc. all complete from Subarnabehar W/S scheme (Phase - I) of Retrofitting in Nadia District under Nadia Division P.H.E. Dte." (PART- A) Assistant Engineer ORD/000018/2021-2022 2159/ND 21/05/2021 60 M/S S.S ENTERPRISE 42.27 9.23 21.84 0
4 NADIA Nadia Division Providing Functional House Tap Connection from Subernabehar Water Supply Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting). , SM/08054 Retrofitting Route survey, Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by retrofitting under Jal Swapna for Subarnabehar W/S Scheme in Krishnagar - I Block of Nadia District under Nadia Division. PART - B Assistant Engineer ORD/000317/2021-2022 1190/PH 03/12/2021 10 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD 1.69 0.00 0 100
5 NADIA Nadia Division Providing Functional House Tap Connection from Subernabehar Water Supply Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting). , SM/08054 Retrofitting Laying of D I Pipe line in place of UPVC pipe including other allied works from OHR to both side of head work site for providing FHTC under Jal Swapna at Subarnabehar w/s scheme under Nadia Division PHED. Assistant Engineer Junior Engineer Krishnanagar - I Block ORD/000065/2022-2023 215/PH 12/07/2022 30 SURAJIT KUMAR GHOSH 4.65 0.00 0 92
6 NADIA Nadia Division Providing Functional House Tap Connection from Subernabehar Water Supply Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting). , SM/08054 Retrofitting Providing functional household tap connection (Part) including supply of 15mm dia PVC pipe of average length of 15 m, 10mm dia Gun-Metal Ferrule, Saddle piece (as required size) 15mm dia Bib cock etc. all complete from Subarnabehar W/S scheme (Phase - I) of Retrofitting in Nadia District under Nadia Division P.H.E. Dte." (PART- B) Assistant Engineer ORD/000063/2021-2022 2432/ND 14/06/2021 60 SANJOY BAKSHI 42.57 61.63 144.77 100
7 NADIA Nadia Division Providing Functional House Tap Connection from Subernabehar Water Supply Scheme under Jal Swapno Programme in Nadia District (Phase-I Retrofitting). , SM/08054 Retrofitting Providing functional household tap connection (Part) including supply of 15mm dia PVC pipe of average length of 15 m, 10mm dia Gun-Metal Ferrule, Saddle piece (as required size) 15mm dia Bib cock etc. all complete from Subarnabehar W/S scheme (Phase - I) of Retrofitting in Nadia District under Nadia Division P.H.E. Dte." (PART- C) Assistant Engineer ORD/000017/2021-2022 2391/ND 10/06/2021 45 ROY CONSTRUCTION 9.03 16.29 180.4 100
Total 125.69 87.15 69.34