Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 114.19 179.61 157.29  
1 NADIA Nadia Division Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-V within Kaliganj Block (Phase-A). , SM/07004 Retrofitting PREPERATION OF DETAILS PROJECT FOR FHTC AT SURFACE WATER BASED W/S SCHEME ( N.SECTOR) , PART-II, ZONE-I, PHASE-A & B UNDER , NADIA DIVISION , PHE ,DTE VCH/000309/2021-2022 139/FHTC 17/08/2021 0 LEMNISCATE 0.47 0.00 0 0
2 NADIA Nadia Division Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-V within Kaliganj Block (Phase-A). , SM/07004 Retrofitting PROVIDING FHTC INCLUDING SUPPLY OF 15MM DIA PIPE G.I/PVC PIPE OF AVERAGE LENGTH OF 10MM DIA GUN-METAL FERRULE, SADDLE PIECE 15MM DIA BIB COCK ETC AT SUBERNA BIHAR W/S SCHEME PART-B VCH/000963/2021-2022 473/DW 07/02/2022 0 ROY CONSTRUCTION 0.73 0.00 0 0
3 NADIA Nadia Division Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-V within Kaliganj Block (Phase-A). , SM/07004 Retrofitting Providing FHTC at Surface Water Based Water Supply Scheme(northern sector),Part-I,Zone-V within Kaliganj block(Phase-A) in Nadia District under Nadia Division P.H.Engineering Dte. Assistant Engineer Junior Engineer 2 ORD/000182/2020-2021 3588/ND 08/12/2020 90 TARUN KUMAR BHATTACHARYA 96.83 178.16 183.99 0
4 NADIA Nadia Division Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-V within Kaliganj Block (Phase-A). , SM/07004 Retrofitting Hiring of 1 (One) no Diesel Luxury Taxi/ Maxi Cab/ Motor Cab on daily basis under monthly hiring category for the office of the Executive Engineer, Nadia Division, PHE Dte. (Period- 01/04/2023 to 30/09/2023) Assistant Engineer ORD/000548/2022-2023 465/ Kly SD-1 31/03/2023 183 ARROWTOWN DEALERS PVT. LTD 2.40 0.54 22.5 0
5 NADIA Nadia Division Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-V within Kaliganj Block (Phase-A). , SM/07004 Retrofitting Hiring Diesel Luxury Car on daily basis (for 12 months from 01.02.2021 to 31.01.2022) for the office use of the Assistant Engineer, Kalyani Sub Division II, P.H.E. Dte Assistant Engineer ORD/000463/2020-2021 198 / KLYSD -II 29/01/2021 365 SUMAN CHAKRABORTY 4.80 0.91 18.96 0
6 NADIA Nadia Division Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-V within Kaliganj Block (Phase-A). , SM/07004 Retrofitting Material Requisition To Resource Division RTOR000028/2021-2022 448/ND 31/01/2022 0 Resource Division 1.26 0.00 0 0
7 NADIA Nadia Division Providing FHTC at Surface Water Based Water Supply Scheme (Northern Sector), Part-I, Zone-V within Kaliganj Block (Phase-A). , SM/07004 Retrofitting Material Requisition To Resource Division RTOR000059/2021-2022 812/ND 18/02/2022 0 Resource Division 7.70 0.00 0 0
Total 114.19 179.61 157.29