Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 946.25 551.64 58.3  
1 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for KAMALPUR ZONE-I to Accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division PHE Dte. , SM/10525 Augmentation Route survey, Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by retrofitting under Jal Swapna for Kamalpur Zone-I W/S Scheme in Ranaghat-II Block of Nadia District under Nadia Division, P.H.E. Dte. Assistant Engineer ORD/000440/2021-2022 1060/RSD 02/12/2021 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD 4.64 4.64 100 100
2 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for KAMALPUR ZONE-I to Accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division PHE Dte. , SM/10525 Augmentation Additional Route survey, Design of distribution network and Preparation of DPR for providing FHTC (Functional House Hold Tap Connection) by retrofitting under Jal Swapna for Kamalpur Zone-I W/S Scheme in Ranaghat-I Block of Nadia District under Nadia Division, P.H.E. Dte. Assistant Engineer ORD/000742/2021-2022 1119/RSD 21/12/2021 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD 0.78 0.56 71.79 100
3 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for KAMALPUR ZONE-I to Accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division PHE Dte. , SM/10525 Augmentation Material Requisition To Resource Division RTOR000105/2022-2023 5104/ND 08/12/2022 0 Resource Division 188.62 0.00 0 0
4 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for KAMALPUR ZONE-I to Accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division PHE Dte. , SM/10525 Augmentation Material Requisition To Resource Division RTOR000069/2022-2023 4301/ND 29/09/2022 0 Resource Division 0.05 0.00 0 0
5 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for KAMALPUR ZONE-I to Accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division PHE Dte. , SM/10525 Augmentation Material Requisition To Resource Division RTOR000013/2023-2024 1859/ND 26/04/2023 0 Resource Division 84.80 0.00 0 0
6 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for KAMALPUR ZONE-I to Accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division PHE Dte. , SM/10525 Augmentation Repairing of Pump house-I with sanitary arrangement under augmentation of Kamalpur Zone-I piped water supply scheme under Ranaghat Sub-Division, under Nadia Division PHE Dte. Assistant Engineer Junior Engineer 2 ORD/000293/2024-2025 1278(A)RSD 04/10/2024 45 KUHELI ENTERPRISE 1.89 0.00 0 0
7 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for KAMALPUR ZONE-I to Accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division PHE Dte. , SM/10525 Augmentation Providing functional household tap connection including supplying, laying, fitting, fixing of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16) pipe with all necessary specials, saddle piece etc. all complete for augmentation of Ground Water Based Water Supply Scheme for Kamalpur Zone-I to accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division P.H.Engineering Dte. Assistant Engineer Junior Engineer 2 ORD/000128/2022-2023 3697/ND 26/08/2022 90 HANNAN BUILDERS PRIVATE LIMITED 592.18 546.44 92.28 95
8 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for KAMALPUR ZONE-I to Accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division PHE Dte. , SM/10525 Augmentation Laying 315 mm and 110 mm dia uPVC pipe line in place of damaged 315 mm and 110 mm dia uPVC pipe from Purba Naoapara to Kamalpur for smooth running of Ground Water Based Water Supply Scheme for Kamalpur Zone-I in Ranaghat-I block of Nadia District under Nadia Division P.H.Engineering Dte. Assistant Engineer Junior Engineer 2 ORD/000289/2023-2024 910/RSD 13/09/2023 30 M/S BISWAS ENTERPRISE 4.72 0.00 0 0
9 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for KAMALPUR ZONE-I to Accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division PHE Dte. , SM/10525 Augmentation Repairing of PH-II and Construction of Sanitary arrangement under augmentation of Kamalpur Zone-I under Ranaghat Sub-Division under Nadia Division PHE Dte. Assistant Engineer Junior Engineer 2 ORD/000382/2024-2025 1418/RSD 19/11/2024 45 RENUKA ENTERPRISE 2.15 0.00 0 100
10 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for KAMALPUR ZONE-I to Accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division PHE Dte. , SM/10525 Augmentation Repairing of PH-III and Construction of Sanitary arrangement under augmentation of Kamalpur Zone-I under Ranaghat Sub-Division under Nadia Division PHE Dte. Assistant Engineer Junior Engineer 2 ORD/000675/2024-2025 1419/RSD 19/11/2024 45 MAA ENTERPRISE 2.15 0.00 0 100
11 NADIA Eastern Mechanical Augmentation of Ground Water Based Piped Water Supply Scheme for KAMALPUR ZONE-I to Accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division PHE Dte. , SM/10525 Augmentation Supply, delivery, installation Commissioning of Electro Mechanical Equipments and allied works at KAMALPUR ZONE-I W/S Scheme Block- Ranaghat-II under Eastern Mechanical Division, P.H.E, Dte. Dist. Nadia. [SM/10525] Assistant Engineer ORD/000136/2025-2026 1137/EMD 04/06/2025 90 H.K. DAS & CO. 52.38 0.00 0 0
12 NADIA Nadia Division Augmentation of Ground Water Based Piped Water Supply Scheme for KAMALPUR ZONE-I to Accommodate FHTC in Ranaghat-II block of Nadia District under Nadia Division PHE Dte. , SM/10525 Augmentation Construction and installation of MANIFOLD and allied works at Head Works site under Kamalpur Zone-I Ground Based Water Supply Scheme under Ranaghat-II Block under Nadia Division, P.H.E Dte. in connection with uniform distribution of drinking water through FHTC (Functional Household Tap Connection) under Jal Jeevan Mission(JJM) Assistant Engineer ORD/000065/2025-2026 2374/ND 22/05/2025 90 AREOCON 11.89 0.00 0 0
Total 946.25 551.63 58.3