Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 26.04 4.5 17.28  
1 NADIA Nadia Division Drinking water sample collection & testing through Field Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme under JJM. , SM/09024 Support-WQMSP Drinking water sample collection & testing through Field Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme under JJM. VCH/000505/2022-2023 72/PFMS 05/07/2022 0 OTHERS 13.80 0.00 0 0
2 NADIA Nadia Division Drinking water sample collection & testing through Field Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme under JJM. , SM/09024 Support-WQMSP Uploading of FTK testing data at Water Quality Dash Board in Nadia District under Nadia Division, PHE Dte. Assistant Engineer ORD/000004/2022-2023 339/Kly SD-I 18/04/2022 3 RAJAT ENTERPRISE 1.69 1.70 100.59 0
3 NADIA Nadia Division Drinking water sample collection & testing through Field Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme under JJM. , SM/09024 Support-WQMSP Uploading of FTK testing data at Water Quality Dash Board in Nadia District under Nadia Division, PHE Dte. Assistant Engineer ORD/000422/2022-2023 218/Kly SD-I 22/02/2023 90 CONSTRUCTURE 0.95 0.95 100 0
4 NADIA Nadia Division Drinking water sample collection & testing through Field Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme under JJM. , SM/09024 Support-WQMSP Continuation for Uploading of FTK testing data at Water Quality Dash Board in Nadia District under Nadia Division, PHE Dte. Assistant Engineer ORD/000022/2023-2024 578/ Kly SD-I 02/05/2023 90 CONSTRUCTURE 0.95 0.95 100 0
5 NADIA Nadia Division Drinking water sample collection & testing through Field Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme under JJM. , SM/09024 Support-WQMSP PLACEMENT OF FUND FOR ASHA INCENTIVE OF WATER SAMPLE TESTING BY FTK AT DIFFERENT BLOCKS IN THE DISTRICT OF NADIA BILL/00668/2022-2023 492/PFMS 27/03/2023 0 DISTRICT HEALTH & FAMILY WELFARE SAMITI 7.70 0.00 0 0
6 NADIA Nadia Division Drinking water sample collection & testing through Field Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme under JJM. , SM/09024 Support-WQMSP Continuation work order for Uploading of FTK testing data at Water Quality Dash Board in Nadia District under Nadia Division, PHE Dte. for the period from 01.08.2023 to 31.10.2023 Assistant Engineer ORD/000177/2023-2024 791/KLYSD-I 27/07/2023 92 CONSTRUCTURE 0.95 0.90 94.74 100
Total 26.05 4.50 17.29