Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 264.25 6.85 2.59  
1 NADIA Nadia Division Providing Functional House Tap Connection from Bhanderkhola Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07834 Retrofitting Providing Functional House Tap Connection from Bhanderkhola Water Supply Scheme under Jal Swapno Programme (Phase-I). VCH/000992/2020-2021 24/03/2021 0 S.S. ENTERPRISE 53.42 0.00 0 0
2 NADIA Nadia Division Providing Functional House Tap Connection from Bhanderkhola Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07834 Retrofitting Providing Functional House Tap Connection from Bhanderkhola Water Supply Scheme under Jal Swapno Programme (Phase-I) VCH/000468/2021-2022 04/10/2021 0 S.S. ENTERPRISE 29.31 0.00 0 0
3 NADIA Nadia Division Providing Functional House Tap Connection from Bhanderkhola Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07834 Retrofitting 1ST RA FOR PROVIDING FHTC BHANDERKHOLA W/S SCHEME, PHASE-1, RETROFITTING. VCH/000198/2021-2022 88/PPMS 15/07/2021 0 S.S. ENTERPRISE 53.42 0.00 0 0
4 NADIA Nadia Division Providing Functional House Tap Connection from Bhanderkhola Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07834 Retrofitting Providing Functional House Tap Connection from Bhanderkhola Water Supply Scheme under Jal Swapno Programme (Phase-I) VCH/000607/2021-2022 265/PFMS 08/10/2021 0 S.S ENTERPRISE 29.31 0.00 0 0
5 NADIA Nadia Division Providing Functional House Tap Connection from Bhanderkhola Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07834 Retrofitting Providing functional household tap connection (Part) including supply of 15mm dia PVC pipe of average length of 15 m, 10mm dia Gun-Metal Ferrule, Saddle piece (as required size) 15mm dia Bib cock etc. all complete from Bhanderkhola W/S scheme in Nadia District under Nadia Division P.H.E. Dte.(Phase-I, Retrofitting) Assistant Engineer ORD/000237/2020-2021 46/ND 06/01/2021 90 S.S. ENTERPRISE 93.24 6.85 7.35 100
6 NADIA Nadia Division Providing Functional House Tap Connection from Bhanderkhola Water Supply Scheme under Jal Swapno Programme (Phase-I) , SM/07834 Retrofitting Material Requisition To Resource Division RTOR000099/2021-2022 1017/ND 03/03/2022 0 Resource Division 5.55 0.00 0 0
Total 264.25 6.85 2.59