D4- Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Clear
Rs. in Lakh
Sl No. District
As per Census (2011)
Scheme SM Code Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Type
Type of Scheme as per PHED-MIS
Name of JE entrusted SLSSC Date
Date of SLSSC in which the Scheme has been Approved
FHTC Involved
Approved FHTC Count Modified after the appropriation in YDU considered under the Schemes for which Work Order has been Issued as per PHED-MIS
Estimated Cost AAFS Cost
Approved Implementation as mentioned in AAFS considered under the Schemes for which Work Order has been Issued as per PHED-MIS
Date of First Work Order
Total No. of Work Orders Issued under the Scheme as per PHED-MIS
No. of Work Orders Issued
Total No. of Work Orders Issued under the Scheme as per PHED-MIS
Work Value
Total Cost for all the Issued Work Order under the Scheme as per PHED-MIS
510 9,80,490 2,43,374.1 2,44,969.78 # 3,758 2,01,712
1 HOOGHLY SM/06991 Retrofitting work for providing Functional Household Tap Connection (FHTC) within the command area of SRIPUR Water Supply Scheme Retrofitting 25/09/2020 1,287 83.37 83.37 14/12/2021 2 97.03
2 HOOGHLY SM/07944 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF UTTAR RAJYADHARPUR WATER SUPPLY SCHEME. Retrofitting 08/01/2021 745 48.29 48.29 10/04/2023 10 60.63
3 HOOGHLY SM/07956 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF KULTEGHARI WATER SUPPLY SCHEME. Retrofitting 08/01/2021 3,727 203.01 203.01 21/07/2025 4 182.46
4 HOOGHLY SM/06765 Retrofitting Works for providing 1089 nos Functional Household Tap Connection(FHTC) within the Dakshinkul, Baganbati & Gazipur Mouza of Malia Water Supply Schem Retrofitting 28/08/2020 1,089 89.54 89.54 26/09/2022 6 85.89
5 HOOGHLY SM/06766 Retrofitting Works for Borhal (Zone-I) PWSS for providing 1236 nos Functional Household Tap Connection(FHTC) Retrofitting 28/08/2020 3,814 93.40 93.40 11/02/2021 3 178.09
6 HOOGHLY SM/08737 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF SAOTA WATER SUPPLY SCHEME. Retrofitting 10/02/2021 2,836 163.87 163.87 03/06/2022 1 74.89
7 HOOGHLY SM/08738 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF BAIKUNTHAPUR WATER SUPPLY SCHEME. Retrofitting 10/02/2021 2,305 134.58 134.58 06/05/2021 6 133.84
8 HOOGHLY SM/09068 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF KANPUR WATER SUPPLY SCHEME. Retrofitting 19/08/2021 1,287 80.21 80.21 12/11/2021 2 37.19
9 HOOGHLY SM/09691 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR GOGHAT. Augmentation 19/08/2021 2,605 541.55 541.55 20/04/2022 11 580.77
10 HOOGHLY SM/09694 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR RAJBALHAT. Augmentation 19/08/2021 4,298 772.01 772.01 20/04/2022 25 640.85
11 HOOGHLY SM/10273 WATER SUPPLY ARRANGEMENT FOR 294 Nos. SUB-CENTRES & PRIMARY HEALTH CENTRES RUNNING WITHIN GOVT PREMISES SITUATED NOT WITHIN THE COMMAND AREA OF PWSS UNDER HOOGHLY DIVISION PHE DTE (294 NOs) UNDER JANGIPARA, KHANAKUL-I & II, PANDUA, POLBA-DADPUR, PURSURAH, Govt. Institutional Building (GP Building, Community Centre, Community Toilet, Other Govt. Offices) 16/12/2021 0 659.42 659.42 19/04/2022 9 299.04
12 HOOGHLY SM/10132 Retrofitting Works for providing Functional House hold Tap Connection(FHTC)Within the Command Area Rameswarpur Water Supply Scheme of Pandua Block Under Hooghly Division, P.H.E Dte Retrofitting 16/12/2021 2,111 126.17 126.17 10/03/2022 2 84.89
13 HOOGHLY SM/11003 RETROFITTING WORKS FOR PROVIDING 800 NOS. FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITH IN COMMAND AREA OF BALI WATER SUPPLY SCHEME UNDER HOOGHLY DIVISION P.H.E DTE. Retrofitting 16/03/2022 800 51.92 51.92 07/04/2022 3 31.81
14 HOOGHLY SM/12252 CHAUTARA PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK New 22/08/2022 1,695 523.15 523.15 03/05/2023 6 59.69
15 HOOGHLY SM/12258 KAMRAI PIPED W/S SCHEME UNDER POLBA-DADPUR BLOCK New 22/08/2022 837 390.37 390.37 03/05/2023 5 48.24
16 HOOGHLY SM/12238 KUCHPALA PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK New 22/08/2022 2,145 533.98 533.98 30/03/2023 8 3,765.97
17 HOOGHLY SM/12248 BANDHPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-I, DISTRICT: HOOGHLY. New 22/08/2022 2,935 671.18 671.18 26/09/2024 10 733.05
18 HOOGHLY SM/11466 Augmentation of Ground Water Based Piped Water Supply Scheme for Begampur under Serampore Sub-Division of Hooghly Division , P.H.E. Dte. Augmentation 30/03/2022 2,923 590.50 590.50 15/12/2022 17 384.55
19 HOOGHLY SM/12002 RETROFITTING WORKS FOR PROVIDING FHTC WITHIN THE COMMAND AREA OF PURBO THAKURANICHAK WATER SUPPLY SCHEME (FHTC : 5686 Nos) Retrofitting 05/07/2022 3,383 217.20 217.20 20/04/2023 6 156.58
20 HOOGHLY SM/13658 Mamudpur Mini Piped Water Supply Scheme New 09/09/2022 60 38.70 38.70 19/08/2023 1 28.71
21 HOOGHLY SM/13501 Sahapur Piped Water Supply Scheme, Block- Pursura, District-Hooghly New 09/09/2022 606 377.67 377.67 03/03/2023 9 348.88
22 HOOGHLY SM/13348 AUGMENTATION OF PURBA RAMNAGAR PIPED WATER SUPPLY SCHEME Augmentation 17/02/2022 4,545 1,091.61 1,091.61 21/02/2023 12 964.12
23 HOOGHLY SM/13411 SOURCE AUGMENTATION OF SRIPUR (PANDUA) PIPED W/S SCHEME UNDER PANDUA BLOCK Augmentation 09/09/2022 754 180.36 197.18 11/05/2023 13 94.66
24 HOOGHLY SM/13559 Par adra mini pipe water supply scheme New 09/09/2022 94 41.27 41.27 15/05/2023 1 0.58
25 HOOGHLY SM/13347 MADHABPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY. New 22/08/2022 1,798 517.76 517.76 31/07/2024 12 523.92
26 HOOGHLY SM/13354 RETROFITTING WORKS OF GHOSHPUR PWSS FOR PROVIDING 4709 NOS. FUNCTIONAL HOUSE HOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF THE SCHEME UNDER HOOGHLY DIVISION, PHE DTE Retrofitting 22/08/2022 4,709 295.60 295.60 19/07/2023 2 96.22
27 HOOGHLY SM/14983 GROUND WATER BASED DAHAR KUNDU (ZONE-I) PIPED WATER SUPPLY SCHEME IN ARAMBAG BLOCK UNDER HOOGHLY DIVISION, HOOGHLY DISTRICT New 30/09/2022 1,322 605.65 605.65 29/05/2023 7 415.77
28 HOOGHLY SM/14467 UTTAR BABNAN (ZONE-I) PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK New 30/09/2022 2,454 812.88 812.88 26/09/2024 5 100.87
29 HOOGHLY SM/14116 GROUND WATER BASED MAHISGOT (ZONE-II) PIPED WATER SUPPLY SCHEME IN KHANAKUL-I BLOCK UNDER HOOGHLY DIVISION, DISTRICT HOOGHLY New 30/09/2022 2,013 920.66 920.66 13/11/2024 7 3,574.92
30 HOOGHLY SM/13421 Shyampur Mini Piped Water Supply Scheme New 09/09/2022 92 42.22 42.22 27/12/2022 2 96.09
31 HOOGHLY SM/14040 AUGMENTATION OF GROUND BASED PIPED WATER SUPPLY SCHEME FOR BHANDARHATI Augmentation 20/05/2022 4,472 1,265.48 1,265.48 26/09/2024 23 1,012.21
32 HOOGHLY SM/13333 Mostafapur Piped Water Supply Scheme, Block-Khanakul-II, District-Hooghly New 09/09/2022 2,064 928.84 928.84 03/10/2024 8 148.63
33 HOOGHLY SM/13337 SHRIRAMPUR PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK New 09/09/2022 2,648 769.29 769.29 26/09/2024 6 120.94
34 HOOGHLY SM/13414 GROUND WATER BASED NAKUNDA PIPED WATER SUPPLY SCHEME IN GOGHAT-I BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 09/09/2022 1,759 737.21 737.21 22/05/2023 9 708.45
35 HOOGHLY SM/15787 Augmentation of Ghoshpur Piped Water Supply Scheme under Khanakul-I Block Augmentation 16/11/2022 50 441.46 441.46 17/04/2023 10 496.22
36 HOOGHLY SM/15795 Source Augmentation of Paschim Joykrishnapur PWSS Augmentation 16/11/2022 4,230 110.32 110.32 26/04/2023 8 82.87
37 HOOGHLY SM/09692 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR ATGHARA. Augmentation 19/08/2021 2,553 444.24 444.24 29/03/2023 15 468.38
38 HOOGHLY SM/07440 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF NAMAJGRAM WATER SUPPLY SCHEME. Retrofitting 04/12/2020 3,860 230.10 230.10 10/05/2021 3 162.27
39 HOOGHLY SM/16120 AUGMENTATION OF PATUL PIPED WATER SUPPLY SCHEME, BLOCK- KHANAKUL-I, DISTRICT-HOOGHLY Augmentation 28/12/2022 435 417.91 417.91 26/12/2024 5 43.39
40 HOOGHLY SM/15806 Source Augmentation of PURBA RAYPUR Piped Water Supply Scheme under Arambag Block Augmentation 16/11/2022 25 65.81 65.81 22/05/2023 5 51.41
41 HOOGHLY SM/15808 Source Augmentation of JAYKRISHNAPUR Piped Water Supply Scheme under Goghat-I Block Augmentation 16/11/2022 25 77.79 77.79 20/04/2023 7 65.19
42 HOOGHLY SM/15801 SOURCE AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR SHIBRAI W/S SCHEME UNDER PANDUA BLOCK Augmentation 16/11/2022 613 150.14 178.69 22/05/2023 5 142.84
43 HOOGHLY SM/16763 BASTA PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK New 30/09/2022 541 240.53 240.53 23/03/2023 6 165.87
44 HOOGHLY SM/16130 Source Augmentation of DIHI BAGNAN Piped Water Supply Scheme under Arambag Block Augmentation 28/12/2022 25 178.48 178.48 22/10/2024 11 212.21
45 HOOGHLY SM/17716 GROUND WATER BASED DHARMMAPUR PIPED WATER SUPPLY SCHEME IN KHANAKUL-I BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 30/09/2022 1,985 728.51 728.51 06/04/2023 6 464.98
46 HOOGHLY SM/18098 BHATUA PIPED W/S SCHEME (FOR UNCOVERED AREA) UNDER POLBA DADPUR BLOCK New 10/03/2023 740 237.95 237.95 20/02/2024 5 46.87
47 HOOGHLY SM/18105 Nilarpur Piped Water Supply Scheme, Block-Jangipara, District-Hooghly New 10/03/2023 1,287 673.90 673.90 17/07/2023 9 497.53
48 HOOGHLY SM/18111 Retrofitting work for Providing Functional Household Tap Connection (FHTC) within the uncovered portion of Hasampur Water Supply Scheme Under Dhaniakhali Block Retrofitting 10/03/2023 160 20.53 20.53 28/10/2022 1 90.96
49 HOOGHLY SM/16648 RETROFITTING FOR BANDIPUR WS SCHEME Retrofitting 28/12/2022 1,550 99.14 99.14 16/03/2023 6 9.18
50 HOOGHLY SM/17719 BHURKUNDA WATER SUPPLY SCHEME (ZONE-II) New 30/09/2022 907 398.66 398.66 28/04/2023 5 38.09
51 HOOGHLY SM/10451 AUGMENTATION OF MAHESHPUR WATER SUPPLY SCHEME Augmentation 27/01/2022 3,308 989.36 989.36 31/07/2023 34 859.55
52 HOOGHLY SM/18593 Sunia Piped Water Supply Scheme, Block- Goghat-I, District-Hooghly New 30/09/2022 2,432 1,071.30 1,071.30 08/08/2023 7 1,552.51
53 HOOGHLY SM/18597 BENGAI WATER SUPPLY SCHEME New 30/09/2022 3,263 1,076.77 1,076.77 11/10/2023 7 43.54
54 HOOGHLY SM/11867 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BAGNAN Augmentation 20/05/2022 1,870 446.85 446.85 14/06/2024 22 408.16
55 HOOGHLY SM/11998 RETROFITTING WORKS FOR PROVIDING FHTC WITHIN THE COMMAND AREA OF HAZIPUR WATER SUPPLY SCHEME Retrofitting 05/07/2022 2,241 140.93 140.93 04/01/2022 1 19.85
56 HOOGHLY SM/17626 GROUND WATER BASED PUKHURIA PIPED WATER SUPPLY SCHEME IN GOGHAT-II BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 28/12/2022 1,341 663.19 663.19 03/08/2023 8 457.95
57 HOOGHLY SM/12265 KUMRUL PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK New 22/08/2022 4,371 948.04 948.04 15/05/2023 13 108.58
58 HOOGHLY SM/18969 SOURCE AUGMENTATION OF SOMRA PIPED W/S SCHEME UNDER BALAGARH BLOCK Augmentation 10/03/2023 0 188.47 188.47 12/03/2024 5 48.53
59 HOOGHLY SM/18971 SOURCE AUGMENTATION OF RAMESWARPUR PIPED W/S SCHEME UNDER PANDUA BLOCK Augmentation 10/03/2023 0 188.47 188.47 20/02/2025 4 32.85
60 HOOGHLY SM/18972 SOURCE AUGMENTATION OF KAMARPARA PIPED W/S SCHEME UNDER BALAGARH BLOCK Augmentation 10/03/2023 0 188.47 188.47 19/11/2024 2 25.61
61 HOOGHLY SM/18981 SOURCE AUGMENTATION OF DEPARA PIPED W/S SCHEME UNDER PANDUA BLOCK Augmentation 10/03/2023 0 103.03 103.03 19/02/2025 3 17.57
62 HOOGHLY SM/12259 PATUL W/S SCHEME UNDER POLBA-DADPUR BLOCK New 22/08/2022 2,185 563.79 563.79 03/05/2023 5 65.51
63 HOOGHLY SM/18953 Source Augmentation Of GOSWAMI MALIPARA Piped Water Supply Scheme Under POlba Dadpur Block Augmentation 10/03/2023 0 67.84 67.84 06/11/2023 6 170.30
64 HOOGHLY SM/07463 Retrofitting work for providing Functional Household Tap Connection (FHTC) within the command area of DHIBAGNAN Water Supply Scheme Retrofitting 25/09/2020 2,123 130.74 130.74 07/04/2022 4 219.57
65 HOOGHLY SM/18672 Raghubati Piped Water Supply Scheme. New 19/08/2021 5,842 1,129.16 1,129.16 04/10/2024 6 95.56
66 HOOGHLY SM/18961 Source Augmentation Of BAIKUNTHAPUR piped Water Supply Scheme under Pursurah Block Augmentation 10/03/2023 0 174.48 174.48 29/11/2023 3 146.45
67 HOOGHLY SM/18963 Source Augmentation of PABA Piped Water Supply Scheme under Goghat-II Block Augmentation 10/03/2023 0 63.33 63.33 29/11/2023 2 34.85
68 HOOGHLY SM/18964 Source Augmentation of HARADITYA Piped Water Supply Scheme under Arambag Block Augmentation 10/03/2023 0 194.51 194.51 23/11/2023 1 21.49
69 HOOGHLY SM/19161 Source Augmentation of Baksa W/S Scheme under Serampore Sub-Division of Hooghly Division, P.H.E. Dte. [Block-Chanditala-II] Augmentation 16/11/2022 1,522 51.21 51.21 24/05/2023 3 22.96
70 HOOGHLY SM/07436 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF KULIHANDA WATER SUPPLY SCHEME. Retrofitting 04/12/2020 5,421 288.46 288.46 06/05/2022 12 289.81
71 HOOGHLY SM/06993 Retrofitting work for providing Functional Household Tap Connection (FHTC) within the command area of Mandaran Water Supply Scheme Retrofitting 25/09/2020 1,259 79.51 79.51 17/12/2020 3 52.93
72 HOOGHLY SM/07949 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF GURAP WATER SUPPLY SCHEME. Retrofitting 08/01/2021 2,534 99.58 99.58 06/05/2022 5 112.38
73 HOOGHLY SM/07957 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF AYMA NABABPUR WATER SUPPLY SCHEME. Retrofitting 08/01/2021 2,936 163.57 163.57 31/08/2023 3 47.67
74 HOOGHLY SM/09025 Repairing damages caused by Cyclonic Storm AMPHAN to various Piped Water Supply Scheme under Hooghly Division, PHE Dte. Disaster 19/08/2021 0 157.43 157.43 27/10/2021 26 90.91
75 HOOGHLY SM/09773 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF MORHAL WATER SUPPLY SCHEME UNDER JANGIPARA BLOCK OF SERAMPORE SUB-DIVISION UNDER HOOGHLY DIVISION PHE DTE. Retrofitting 19/08/2021 1,577 95.96 95.96 19/09/2024 12 118.53
76 HOOGHLY SM/12256 LOKABATI PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK New 22/08/2022 3,235 908.93 908.93 10/03/2025 7 131.43
77 HOOGHLY SM/12365 BASUBATI PIPED WATER SUPPLY SCHEME New 25/04/2022 3,236 1,115.75 1,115.75 10/03/2023 11 867.21
78 HOOGHLY SM/12243 DURGAPUR PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK New 22/08/2022 1,963 538.93 538.93 03/05/2023 6 69.79
79 HOOGHLY SM/11287 BHAGABATIPUR PIPED WATER SUPPLY SCHEME New 16/03/2022 180 99.57 99.57 21/08/2023 10 147.99
80 HOOGHLY SM/11288 BHANJIPUR PIPED WATER SUPPLY SCHEME New 16/03/2022 2,533 759.23 759.23 12/08/2023 14 644.57
81 HOOGHLY SM/11290 HARAT PIPED WATER SUPPLY SCHEME New 16/03/2022 1,913 668.44 668.44 21/06/2023 13 745.08
82 HOOGHLY SM/11166 Augmentation of Ground Water Based Piped Water Supply Scheme for Dhaniakhali Augmentation 17/02/2022 3,961 895.83 895.83 15/12/2022 22 812.93
83 HOOGHLY SM/12014 RETROFITTING WORKS FOR PROVIDING FHTC WITHIN THE COMMAND AREA OF CHILADANGI WATER SUPPLY SCHEME Retrofitting 05/07/2022 3,119 197.98 197.98 19/07/2023 1 94.38
84 HOOGHLY SM/11464 AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR ANANDAPUR UNDER ARAMBAGH SUB DIV PHE DTE Augmentation 30/03/2022 1,500 369.78 369.78 30/08/2022 14 290.74
85 HOOGHLY SM/11467 AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR SOALUK UNDER ARAMBAGH SUB DIVISION PHE DTE Augmentation 30/03/2022 2,350 552.74 552.74 18/05/2023 19 666.05
86 HOOGHLY SM/11990 RETROFITTING WORKS FOR PROVIDING FHTC WITHIN THE COMMAND AREA OF BADANGANJ WATER SUPPLY SCHEME Retrofitting 05/07/2022 5,823 376.63 376.63 16/12/2022 8 271.28
87 HOOGHLY SM/12727 ATISARA PIPED WATER SUPPLY SCHEME New 16/03/2022 3,260 1,322.35 1,322.35 26/09/2023 18 1,103.71
88 HOOGHLY SM/13554 Kapsit Mini Piped Water Supply Scheme New 09/09/2022 53 38.30 38.30 27/12/2022 3 85.64
89 HOOGHLY SM/13562 Naopara Mini Piped Water Supply Scheme New 09/09/2022 77 40.56 40.56 19/08/2023 1 30.41
90 HOOGHLY SM/13587 Bhupatipur Mini Piped Water Supply Scheme New 09/09/2022 16 33.76 33.76 15/05/2023 1 0.10
91 HOOGHLY SM/13588 Nesraguri Mini Piped Water Supply Scheme New 09/09/2022 26 35.58 35.58 0 0.00
92 HOOGHLY SM/14117 GROUND WATER BASED RADHABALLAVPUR (ZONE-II) PIPED WATER SUPPLY SCHEME IN KHANAKUL-I BLOCK UNDER HOOGHLY DIVISION, DISTRICT HOOGHLY New 30/09/2022 1,616 753.82 753.82 22/03/2023 8 458.08
93 HOOGHLY SM/14121 UTTAR BABNAN (Z-II) PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK New 30/09/2022 1,852 511.47 511.47 03/05/2023 5 98.73
94 HOOGHLY SM/14122 HARIPUR PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK New 30/09/2022 983 329.66 329.66 02/06/2023 10 243.63
95 HOOGHLY SM/13320 GROUND WATER BASED KOTA PIPED WATER SUPPLY SCHEME IN GOGHAT-I BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 09/09/2022 2,300 999.62 999.62 01/06/2023 8 1,251.72
96 HOOGHLY SM/15797 SOURCE AUGMENTATION OF SANKHANAGAR CHAKBASNBERIA W/S SCHEME UNDER CHINSURAH MAGRA BLOCK Augmentation 16/11/2022 300 114.30 114.30 02/06/2023 8 180.62
97 HOOGHLY SM/15798 SOURCE AUGMENTATION OF GURAP W/S SCHEME UNDER DHANIAKHALI BLOCK Augmentation 16/11/2022 300 114.30 114.30 17/04/2023 6 83.32
98 HOOGHLY SM/07541 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF RADHABALLABHPUR WATER SUPPLY SCHEME Retrofitting 04/12/2020 893 56.68 56.68 01/12/2021 2 56.98
99 HOOGHLY SM/13594 Surjyapur Mini Piped Water Supply Scheme New 09/09/2022 79 41.97 41.97 02/08/2023 2 32.25
100 HOOGHLY SM/16450 Development of Borhal (Zone-II) Piped Water Supply Scheme by Installing Two (2) Nos. Tube Well including Connection with Distribution, Switch Room & other allied work to meet up the additional water demand induced after execution of FHTC under Serampore S Augmentation 16/11/2022 100 136.17 136.17 15/05/2023 6 85.37
101 HOOGHLY SM/15886 GROUND WATER BASED TIROL (ZONE-II) PIPED W/S SCHEME UNDER ARAMBAGH BLOCK New 16/11/2022 1,519 679.29 679.29 04/10/2024 12 527.69
102 HOOGHLY SM/15887 GROUND WATER BASED GARMANDARAN (Z-2) PIPED WATER SUPPLY SCHEME IN GOGHAT-II BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 16/11/2022 2,293 920.25 920.25 08/06/2023 12 729.47
103 HOOGHLY SM/15803 Source Augmentation of BALI Piped Water Supply Scheme under Goghat-I Block Augmentation 16/11/2022 25 63.20 63.20 22/05/2023 3 40.98
104 HOOGHLY SM/15804 Source Augmentation of PATUL Piped Water Supply Scheme under Khanakul-I Block Augmentation 16/11/2022 50 115.21 115.21 09/03/2023 4 31.30
105 HOOGHLY SM/08740 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF KAIKALA WATER SUPPLY SCHEME. Retrofitting 10/02/2021 4,056 230.84 230.84 13/04/2022 6 272.99
106 HOOGHLY SM/08742 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF GOURHATI WATER SUPPLY SCHEME. Retrofitting 10/02/2021 3,011 176.84 176.84 07/04/2022 4 81.74
107 HOOGHLY SM/15805 Source Augmentation of RADHABALLABHPUR Piped Water Supply Scheme Under Goghat-I Block Augmentation 16/11/2022 25 64.09 64.09 22/05/2023 4 36.72
108 HOOGHLY SM/15899 SOURCE AUGMENTATION OF KOLA W/S SCHEME UNDER CHINSURAH MAGRA BLOCK Augmentation 16/11/2022 300 114.30 114.30 26/09/2023 6 73.29
109 HOOGHLY SM/15814 Source Augmentation of KAPSIT Piped Water Supply Scheme under Arambag Block Augmentation 16/11/2022 25 129.51 129.51 17/05/2023 5 71.54
110 HOOGHLY SM/15791 GROUND WATER BASED MAYAPUR (ZONE-I) PIPED WATER SUPPLY SCHEME IN ARAMBAG BLOCK UNDER HOOGHLY DIVISION, HOOGHLY New 16/11/2022 1,671 742.77 742.77 08/05/2023 9 501.27
111 HOOGHLY SM/16122 Source Augmentation of JAGATPUR Piped Water Supply Scheme under Khanakul-II Block Augmentation 28/12/2022 50 198.87 198.87 18/05/2023 7 89.67
112 HOOGHLY SM/16136 GROUND WATER BASED RAJABALLABHBATI PIPED W/S SCHEME New 28/12/2022 540 231.55 231.55 16/02/2024 5 32.93
113 HOOGHLY SM/16757 Ramnagar Piped Water Supply Scheme. New 19/08/2021 2,549 755.39 755.39 22/05/2023 11 740.73
114 HOOGHLY SM/18103 SINHAL PATAN PIPED WATER SUPPLY SCHEME New 10/03/2023 230 183.43 183.43 09/04/2024 6 86.67
115 HOOGHLY SM/18397 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAMARKUNDU MIRZAPUR BAKIPUR Augmentation 16/03/2022 12,225 4,047.10 4,047.10 06/06/2024 47 2,462.88
116 HOOGHLY SM/18624 KAPASHARIA PIPED WATER SUPPLY SCHEME BLOCK : CHANDITALA-II DISTRICT : HOOGHLY. New 30/09/2022 3,725 1,061.79 1,061.79 07/08/2023 13 1,106.15
117 HOOGHLY SM/09982 AUGMENTATION OF GROUND WATER BASED PWSS FOR HARIPAL Augmentation 22/11/2021 5,180 1,481.84 1,481.84 15/06/2023 35 1,449.49
118 HOOGHLY SM/18926 Improvement of ¿MEGHSAR¿ Piped Water Supply Scheme by laying of HDPE Pipeline by HDD Process & Open cut method including restoration work at Mahanad Bandel Road within Meghsar PWSS under Chinsurah Sub Division. Augmentation 10/03/2023 500 164.41 164.41 14/03/2024 1 0.95
119 HOOGHLY SM/18927 Improvement of BHANDARHATI Piped Water Supply Scheme to provide FHTC within uncovered villages under Command Area of the Scheme Block-Arambagh Augmentation 10/03/2023 0 92.25 92.25 0 0.00
120 HOOGHLY SM/18339 AUGMENTATION OF KRISHNANAGAR PIPED W/S SCHEME UNDER KHANAKUL-I BLOCK Augmentation 22/08/2022 4,199 1,052.22 1,052.22 13/07/2023 9 765.15
121 HOOGHLY SM/18346 GROUND WATER BASED WATER SUPPLY SCHEME FOR PASCHIM NARAYANPUR PWSS, UNDER HOOGHLY DIVISION , BLOCK : HARIPAL, DISTRICT : HOOGHLY New 09/09/2022 2,882 1,006.17 1,006.17 26/09/2024 7 851.52
122 HOOGHLY SM/11584 GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEME FOR THE BLOCKS OF JANGIPARA, TARAKESWAR, HARIPAL & SINGUR IN HOOGHLY DISTRICT New 25/04/2022 1,692 940.95 940.95 15/05/2023 3 2,164.95
123 HOOGHLY SM/18642 GROUND WATER BASED ARUNDA (ZONE-I) PIPED WATER SUPPLY SCHEME IN KHANAKUL-I BLOCK UNDER HOOGHLY DIVISION, DISTRICT HOOGHLY New 16/11/2022 4,990 1,974.34 1,974.34 07/08/2023 5 914.79
124 HOOGHLY SM/18937 SOURCE AUGMENTATION OF CHOPA PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK Augmentation 10/03/2023 0 188.47 188.47 19/06/2024 5 141.32
125 HOOGHLY SM/18951 Source Augmentation Of Paunan Water Supply Scheme Under Polba Dadpur Block Augmentation 10/03/2023 0 153.27 153.27 19/06/2024 4 43.09
126 HOOGHLY SM/18666 KUMIRMORA PIPED WATER SUPPLY SCHEME BLOCK : CHANDITALA- I & II, DISTRICT : HOOGHLY. New 30/09/2022 3,725 1,136.80 1,136.80 07/08/2023 10 1,212.96
127 HOOGHLY SM/18957 Source Augmentation of HARISH CHAK piped Water Supply Scheme Under Khanakul-II Block Augmentation 10/03/2023 0 146.07 146.07 23/11/2023 1 21.47
128 HOOGHLY SM/18966 Source Augmentation of CHIKRAND ZONE-I Piped Water Supply Scheme by installing Two (2) nos. Tube Wells including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC by loca Augmentation 10/03/2023 0 408.03 408.03 19/12/2024 9 190.50
129 HOOGHLY SM/18778 PAIRAGACHA PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II DISTRICT: HOOGHLY. New 30/09/2022 0 0.00 1,107.03 29/08/2023 7 989.62
130 HOOGHLY SM/13662 Naraharbati Mini Piped water Supply Scheme New 09/09/2022 60 38.96 38.96 27/12/2022 2 86.73
131 HOOGHLY SM/18944 SOURCE AUGMENTATION OF BAHADURPUR PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK Augmentation 10/03/2023 0 188.47 188.47 06/11/2023 7 181.55
132 HOOGHLY SM/18947 Source Augmentation of RAJHATO Piped Water Supply Scheme under Khanakul-II Block Augmentation 10/03/2023 0 140.91 140.91 23/08/2024 4 43.43
133 HOOGHLY SM/07437 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF NALDANGA WATER SUPPLY SCHEME. Retrofitting 04/12/2020 4,968 278.22 278.22 19/04/2023 7 377.88
134 HOOGHLY SM/06988 Retrofitting work for providing Functional Household Tap Connection (FHTC) within the Mandaran Dilakash, Khurigachhi, Kulakash, Kandar Panagar Mouza of Borhol Zone-II Water Supply Scheme Retrofitting 25/09/2020 1,189 75.19 75.19 0 0.00
135 HOOGHLY SM/07462 Retrofitting work for providing Functional Household Tap Connection (FHTC) within the command area of PANCHGHORA Water Supply Scheme Retrofitting 25/09/2020 3,233 184.15 184.15 05/04/2023 9 192.44
136 HOOGHLY SM/07945 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF DIHIBAYARA WATER SUPPLY SCHEME. Retrofitting 08/01/2021 1,203 74.37 74.37 07/04/2022 3 75.48
137 HOOGHLY SM/06760 Retrofitting Works for Digsui-Heora (Zone-I) PWSS for providing 502 nos Functional Household Tap Connection(FHTC) Retrofitting 28/08/2020 1,263 43.92 43.92 27/04/2022 2 22.41
138 HOOGHLY SM/07542 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF DEPARA WATER SUPPLY SCHEME. Retrofitting 04/12/2020 1,488 95.57 95.57 14/12/2021 2 153.13
139 HOOGHLY SM/08739 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF PALASPAI WATER SUPPLY SCHEME. Retrofitting 10/02/2021 2,939 178.72 197.26 06/05/2021 3 215.35
140 HOOGHLY SM/09516 Augmentation of RAJHAT ZONE 1 Piped Water Supply Scheme by installing ( 01 ) no. Tube well including Connection with Distribution, Switch Room and other allied work to meet up the water demand, hampered due to execution of FHTC. Augmentation 08/10/2021 0 43.94 43.94 02/03/2023 13 30.19
141 HOOGHLY SM/09695 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR JANAI BLOCK: CHANDITALA-II Augmentation 19/08/2021 3,469 854.05 854.05 20/04/2022 22 802.02
142 HOOGHLY SM/06989 Retrofitting work for providing Functional Household Tap Connection (FHTC) within the command area of Harishchak (Left bank of Sundeswari river) Water Supply Scheme Retrofitting 25/09/2020 2,215 57.30 57.30 12/11/2021 2 102.41
143 HOOGHLY SM/12250 HARIPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-I, DISTRICT: HOOGHLY. New 22/08/2022 2,029 637.12 637.12 31/07/2024 7 69.37
144 HOOGHLY SM/12255 HASNAN PIPED W/S SCHEME UNDER POLBA-DADPUR BLOCK New 22/08/2022 3,145 689.12 689.12 17/10/2023 8 127.35
145 HOOGHLY SM/12260 SIMLA W/S SCHEME UNDER DHANIAKHALI BLOCK New 22/08/2022 2,969 653.17 653.17 03/05/2023 5 55.36
146 HOOGHLY SM/12370 AUGMENTATION OF GROUND WATER BASED PWSS FOR GOPALNAGAR Augmentation 16/03/2022 4,599 1,268.51 1,268.51 29/09/2023 16 1,080.88
147 HOOGHLY SM/12263 BISHNUPUR W/S SCHEME UNDER DHANIAKHALI BLOCK New 22/08/2022 3,116 831.48 831.48 11/08/2023 8 210.26
148 HOOGHLY SM/12233 GROUND WATER BASED ROUTHKHANA PIPED WATER SUPPLY SCHEME IN KHANAKUL-II BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 22/08/2022 2,578 964.48 964.48 19/10/2023 9 5,878.61
149 HOOGHLY SM/12239 NABABPUR PIPED WATER SUPPLY SCHEME BLOCK- CHANDITALA-I, DISTRICT: HOOGHLY New 22/08/2022 2,266 649.37 649.37 10/08/2023 6 3,309.15
150 HOOGHLY SM/11286 ASTARA PIPED WATER SUPPLY SCHEME New 16/03/2022 1,992 646.77 646.77 22/06/2023 16 316.06
151 HOOGHLY SM/11292 PANRRA PIPED WATER SUPPLY SCHEME New 16/03/2022 2,998 987.53 987.53 04/04/2023 9 786.94
152 HOOGHLY SM/13667 Rautara Mini Piped Water Supply Scheme New 09/09/2022 94 43.31 43.31 02/08/2023 2 28.41
153 HOOGHLY SM/11997 RETROFITTING WORKS FOR PROVIDING FHTC WITHIN THE COMMAND AREA OF DEBANANDAPUR WATER SUPPLY SCHEME Retrofitting 05/07/2022 3,456 213.94 213.94 13/09/2021 2 73.06
154 HOOGHLY SM/13657 Char Sundalpur Mini Piped Water Supply Scheme New 09/09/2022 65 39.14 39.14 19/08/2023 1 29.11
155 HOOGHLY SM/13660 Arazi Krittibaspur Mini Piped Water Supply Scheme New 09/09/2022 19 34.70 34.70 27/12/2022 2 74.50
156 HOOGHLY SM/13553 Dwariapur Mini Piped Water Supply Scheme New 09/09/2022 73 40.17 40.17 27/12/2022 2 90.21
157 HOOGHLY SM/13410 SOURCE AUGMENTATION OF DIGSUI HEORA PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK Augmentation 09/09/2022 22 116.43 248.89 04/04/2025 16 213.83
158 HOOGHLY SM/13558 Chetua Mini Piped Water Supply Scheme New 09/09/2022 58 38.93 38.93 0 0.00
159 HOOGHLY SM/13597 Dhanijpur Mini Piped Water Supply Scheme New 09/09/2022 69 40.53 40.53 0 0.00
160 HOOGHLY SM/13324 GROUND WATER BASED MARAKHANA (ZONE-I) PIPED WATER SUPPLY SCHEME IN KHANAKUL-II BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 09/09/2022 2,319 962.17 962.17 10/12/2024 5 42.99
161 HOOGHLY SM/13343 SOURCE AUGMENTATION OF DUBIR BHERI PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK Augmentation 22/08/2022 879 176.07 222.70 09/08/2024 6 197.22
162 HOOGHLY SM/13344 SOURCE AUGMENTATION OF BAICHI PIPED W/S SCHEME UNDER PANDUA BLOCK Augmentation 22/08/2022 511 235.69 235.69 12/03/2024 5 104.66
163 HOOGHLY SM/13599 Telinipara Mini Piped Water Supply Scheme New 09/09/2022 68 39.39 39.39 19/08/2023 1 29.33
164 HOOGHLY SM/13551 Chak Netara Mini Piped Water Supply Scheme New 09/09/2022 67 40.48 40.48 02/08/2023 2 30.80
165 HOOGHLY SM/15788 Augmentation of Chiladangi Piped Water Supply Scheme under Pursurah Block Augmentation 16/11/2022 50 308.80 308.80 24/07/2023 6 464.79
166 HOOGHLY SM/06763 Retrofitting Works for BAMANJOL PWSS for providing 1342 nos Functional Household Tap Connection(FHTC) Retrofitting 28/08/2020 1,342 99.47 99.47 26/04/2023 1 30.94
167 HOOGHLY SM/15800 SOURCE AUGMENTATION OF BHASTARA PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK Augmentation 16/11/2022 50 143.79 178.69 09/08/2024 9 87.91
168 HOOGHLY SM/16127 SAMANTA KHANDA WATER SUPPLY SCHEME New 30/09/2022 2,089 782.59 810.49 28/04/2023 5 107.44
169 HOOGHLY SM/15888 Sibrambati (Zone-II) Piped Water Supply Scheme, Block-Singur, District-Hooghly New 16/11/2022 1,260 515.59 515.59 29/03/2023 7 352.72
170 HOOGHLY SM/15802 Source Augmentation of KISHORPUR Piped Water Supply Scheme under Khanakul-I Block Augmentation 16/11/2022 50 66.42 66.42 17/05/2023 6 53.89
171 HOOGHLY SM/16351 Augmentation of Gobindapur Water Supply Scheme Augmentation 22/08/2022 225 331.19 331.19 04/01/2022 5 41.46
172 HOOGHLY SM/15789 Bhalia (Zone-I) Piped Water Supply Scheme, Block-Arambagh, District-Hooghly New 16/11/2022 2,185 962.24 962.24 18/07/2023 8 607.64
173 HOOGHLY SM/16124 Source Augmentation of ARANDI Piped Water Supply Scheme under Arambag Block Augmentation 28/12/2022 50 190.76 190.76 18/05/2023 6 73.50
174 HOOGHLY SM/18095 RAJHAT PIPED W/S SCHEME (FOR UNCOVERED AREA) UNDER POLBA DADPUR BLOCK New 10/03/2023 477 274.98 274.98 18/07/2023 8 169.60
175 HOOGHLY SM/18106 Retrofitting work for Providing Functional Household Tap Connection (FHTC) within the uncovered portion of Dighir Water Supply Scheme under Dhaniakhali Block Retrofitting 10/03/2023 170 21.11 21.11 29/02/2024 1 0.95
176 HOOGHLY SM/18108 Retrofitting work for Providing Functional Household Tap Connection (FHTC) within the uncovered portion of Chopa Water Supply Scheme under Dhaniakhali Block Retrofitting 10/03/2023 160 20.53 20.53 0 0.00
177 HOOGHLY SM/18109 Retrofitting work for Providing Functional Household Tap Connection (FHTC) within the uncovered portion of Gopinagar Water Supply Scheme Under Dhaniakhali Block Retrofitting 10/03/2023 1,874 41.33 41.33 15/03/2024 2 1.98
178 HOOGHLY SM/16651 GROUND WATER BASED GANDERPUKUR PIPED W/S SCHEME New 28/12/2022 1,407 550.37 550.37 08/06/2023 6 406.11
179 HOOGHLY SM/17629 Bainchipota (Zone-II) Piped Water Supply Scheme, Block- Singur, District- Hooghly New 28/12/2022 933 406.50 406.50 05/11/2024 8 366.86
180 HOOGHLY SM/11461 AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR LAKSHMIPUR UNDER ARAMBAGH SUB DIV PHE DTE Augmentation 30/03/2022 883 329.51 329.51 18/05/2023 14 273.73
181 HOOGHLY SM/17721 BHURKUNDA WATER SUPPLY SCHEME (ZONE-I) New 30/09/2022 2,838 861.33 861.33 28/04/2023 7 267.57
182 HOOGHLY SM/07438 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF ENAYETPUR WATER SUPPLY SCHEME. Retrofitting 04/12/2020 2,082 167.75 272.67 26/11/2021 2 1.16
183 HOOGHLY SM/18929 Improvement of MAINAN Piped Water Supply Scheme to provide FHTC within uncovered villages under Command Area of the Scheme Block- Khanakul-I Augmentation 10/03/2023 0 194.31 194.31 14/12/2021 13 309.11
184 HOOGHLY SM/19014 Bhalia (Zone-II) Piped Water Supply Scheme, Block- Arambagh, District-Hooghly New 28/12/2022 335 211.71 211.71 30/10/2023 4 125.95
185 HOOGHLY SM/18345 Hayatpur Piped Water Supply Scheme, Block-Khanakul-II, District-Hooghly. New 09/09/2022 3,124 1,177.52 1,177.52 05/03/2024 5 126.89
186 HOOGHLY SM/18644 AUGMENTATION OF BAKULIA PIPED WATER SUPPLY SCHEME UNDER BALAGARH BLOCK Augmentation 16/11/2022 5,011 2,099.59 2,099.59 04/04/2025 16 239.99
187 HOOGHLY SM/18646 Garmandaran (Zone-I) Piped Water Supply Scheme, Block- Goghat-II, District-Hooghly New 16/11/2022 3,142 1,321.90 1,321.90 07/08/2023 8 770.69
188 HOOGHLY SM/18978 SOURCE AUGMENTATION OF DHAMAITIKAR PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK Augmentation 10/03/2023 0 188.47 188.47 22/11/2023 2 109.32
189 HOOGHLY SM/18958 Source Augmentation of BACHHANARI Piped Water Supply Scheme Under Arambag Block Augmentation 10/03/2023 0 155.79 155.79 19/12/2024 6 48.54
190 HOOGHLY SM/18960 Source Augmentation of HAYATPUR piped Water Supply Scheme Under Arambag block Augmentation 10/03/2023 0 172.88 172.88 19/12/2024 9 48.86
191 HOOGHLY SM/18592 GROUND WATER BASED SHANTIPUR (ZONE-1) PIPED WATER SUPPLY SCHEME IN GOGHAT-II BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 30/09/2022 2,086 1,147.47 1,147.47 11/10/2023 6 70.32
192 HOOGHLY SM/18943 SOURCE AUGMENTATION OF AKNA PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK Augmentation 10/03/2023 0 85.43 85.43 04/01/2024 4 28.18
193 HOOGHLY SM/18950 Source Augmentation Of AMRA Piped W/S Scheme under Polba Dadbur Block Augmentation 10/03/2023 0 153.27 153.27 31/10/2023 6 189.03
194 HOOGHLY SM/07442 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF AMRA WATER SUPPLY SCHEME. Retrofitting 04/12/2020 1,961 123.87 123.87 14/12/2021 5 121.96
195 HOOGHLY SM/07443 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF CHAPTA WATER SUPPLY SCHEME. Retrofitting 04/12/2020 1,951 115.31 115.31 07/03/2022 2 110.18
196 HOOGHLY SM/06992 Retrofitting work for providing Functional Household Tap Connection (FHTC) within the command area of Jangalpara Water Supply Scheme Retrofitting 25/09/2020 1,695 98.98 98.98 20/12/2021 7 196.86
197 HOOGHLY SM/06759 Retrofitting Works for Providing Functional Household Tap Connection(FHTC) within the Jaysinhachak Mouza of Arandi Water Supply Scheme Retrofitting 28/08/2020 511 40.46 40.46 15/02/2021 0 24.00
198 HOOGHLY SM/07946 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF ANTPUR WATER SUPPLY SCHEME. Retrofitting 08/01/2021 3,076 97.35 97.35 22/10/2024 1 59.66
199 HOOGHLY SM/06761 Retrofitting Works for Digsui-Heora PWSS(Zone-II ) for providing 1065 nos Functional Household Tap Connection(FHTC) Retrofitting 28/08/2020 1,065 83.39 83.39 12/04/2021 3 42.19
200 HOOGHLY SM/06767 Retrofitting Works for providing Functional Household Tap Connection(FHTC) within the Hamirgachhi, Malia & Krishnabati Mouza of Malia Water Supply Scheme Retrofitting 28/08/2020 1,190 99.51 99.51 24/11/2020 5 58.49
201 HOOGHLY SM/07543 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF PATUL WATER SUPPLY SCHEME. Retrofitting 04/12/2020 1,348 86.15 86.15 03/06/2022 1 74.78
202 HOOGHLY SM/08743 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF BAIDYAPUR WATER SUPPLY SCHEME. Retrofitting 19/02/2021 2,754 147.07 147.07 23/08/2021 6 114.83
203 HOOGHLY SM/09066 Retrofitting works for providing Functional Household Tap Connection within the command area of BACHHANARI W/S Scheme Retrofitting 19/08/2021 1,625 97.91 97.91 27/10/2021 11 91.34
204 HOOGHLY SM/09069 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF AKNA WATER SUPPLY SCHEME. Retrofitting 19/08/2021 1,553 95.20 95.20 27/04/2022 1 4.21
205 HOOGHLY SM/10131 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNETION (FHTC) WITHIN THE COMMAND AREA OF DUBIR BHERI WATER SUPPLY SCHEME Retrofitting 16/12/2021 1,061 83.52 83.52 15/02/2021 2 108.68
206 HOOGHLY SM/10133 Retrofitting Works for providing Functional House hold Tap Connection(FHTC)Within the Command Area of Natun CharKrishnabati Water Supply Scheme of Balagarh Block Under Hooghly Division, P.H.E Dte. Retrofitting 16/12/2021 1,702 99.96 99.96 28/10/2022 4 109.78
207 HOOGHLY SM/10004 AUGMENTATION OF GROUND WATER BASED PWSS FOR ENAYETPUR Augmentation 22/11/2021 5,595 1,553.96 1,553.96 26/09/2024 17 1,255.01
208 HOOGHLY SM/09774 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF DHAMAITIKAR WATER SUPPLY SCHEME UNDER DHANIAKHALI BLOCK OF CHINSURHA SUB-DIVISION UNDER HOOGHLY DIVISION PHE DTE. Retrofitting 19/08/2021 2,826 166.04 166.04 23/08/2022 2 23.89
209 HOOGHLY SM/11004 RETROFITTING WORKS FOR PROVIDING 4123 NOS. FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF MASAT WATER SUPPLY SCHEME UNDER HOOGHLY DIVISION Retrofitting 16/03/2022 4,123 244.08 244.08 12/08/2023 8 234.66
210 HOOGHLY SM/11006 RETROFITTING WORKS OF TALPUR PWSS FOR PROVIDING 1224 NOS. FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITH IN COMMAND AREA OF THE SCHEME UNDER HOOGHLY DIVISION P.H.E DTE. Retrofitting 16/03/2022 1,224 77.49 77.49 13/04/2022 2 9.99
211 HOOGHLY SM/09983 AUGMENTATION OF GROUND WATER BASED PWSS FOR DWIPA Augmentation 22/11/2021 4,500 1,263.17 1,263.17 26/09/2024 14 889.01
212 HOOGHLY SM/09984 AUGMENTATION OF GROUND WATER BASED PWSS FOR BERABARI Augmentation 22/11/2021 4,914 1,334.97 1,334.97 19/06/2024 34 1,347.30
213 HOOGHLY SM/10248 WATER SUPPLY ARRANGEMENT FOR 297 Nos. SUB-CENTRES & PRIMARY HEALTH CENTRES RUNNING WITHIN GOVT PREMISES SITUATED NOT WITHIN THE COMMAND AREA OF PWSS UNDER HOOGHLY DIVISION PHE DTE (294 NOs) UNDER Arambag, Balagarh, Chanditala-I & II, Chinsurah-Mogra, Dhan Govt. Institutional Building (GP Building, Community Centre, Community Toilet, Other Govt. Offices) 16/12/2021 0 666.15 666.15 19/04/2022 3 210.24
214 HOOGHLY SM/12246 BARUL PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK New 22/08/2022 3,344 700.75 700.75 12/08/2023 7 92.22
215 HOOGHLY SM/11293 GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR RAMBATI New 16/03/2022 881 385.02 385.02 06/11/2023 11 330.87
216 HOOGHLY SM/11225 RETROFITTING WORKS OF JAGATPUR PWSS FOR PROVIDING 4588 NOS. FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITH IN COMMAND AREA OF THE SCHEME UNDER HOOGHLY DIVISION P.H.E DTE. Retrofitting 16/03/2022 4,588 271.91 271.91 23/06/2022 4 101.56
217 HOOGHLY SM/12012 RETROFITTING WORKS FOR PROVIDING FHTC WITHIN THE COMMAND AREA OF BELUN WATER SUPPLY SCHEME (FHTC : 735 Nos) Retrofitting 05/07/2022 735 47.77 47.77 21/09/2022 2 51.06
218 HOOGHLY SM/13666 Purba Chakla Mini Piped Water Supply Scheme New 09/09/2022 75 40.33 40.33 27/12/2022 2 90.67
219 HOOGHLY SM/13677 SOURCE AUGMENTATION OF RAJHAT (Z-I & II) PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK Augmentation 30/09/2022 222 295.58 295.58 14/06/2024 18 164.51
220 HOOGHLY SM/12001 RETROFITTING WORKS FOR PROVIDING FHTC WITHIN THE COMMAND AREA OF AMDOBA WATER SUPPLY SCHEME Retrofitting 05/07/2022 1,365 88.46 88.46 23/08/2024 3 65.57
221 HOOGHLY SM/13659 Palpukur Mini Piped Water Supply Scheme New 09/09/2022 29 36.56 36.56 02/08/2023 2 27.00
222 HOOGHLY SM/13661 Sikil Beldiha Mini Piped Water Supply Scheme New 09/09/2022 65 39.43 39.43 27/12/2022 2 88.07
223 HOOGHLY SM/13664 Jasapur mini pipe water supply scheme New 09/09/2022 96 41.46 41.46 15/05/2023 1 0.59
224 HOOGHLY SM/13349 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR SRIPATIPUR Augmentation 17/02/2022 3,300 1,335.08 1,335.08 16/08/2023 21 1,031.65
225 HOOGHLY SM/13353 RETROFITTING WORKS OF RAMNARAYANPUR PWSS FOR PROVIDING 2936 NOS. FUNCTIONAL HOUSE HOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF THE SCHEME UNDER HOOGHLY DIVISION, PHE DTE Retrofitting 22/08/2022 2,936 186.31 186.31 21/07/2025 7 152.35
226 HOOGHLY SM/13548 Barul mini pipe water supply scheme New 09/09/2022 74 41.13 41.13 02/08/2023 2 124.42
227 HOOGHLY SM/13555 Jot Mahabhat Mini Piped Water Supply Scheme New 09/09/2022 59 39.70 39.70 02/08/2023 2 30.05
228 HOOGHLY SM/13409 SOURCE AUGMENTATION OF SAPTAGRAM PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK Augmentation 09/09/2022 2,689 166.65 201.57 04/04/2025 16 163.43
229 HOOGHLY SM/13591 Dumurpara Mini Piped water Supply Scheme New 09/09/2022 70 40.73 40.73 02/08/2023 2 31.05
230 HOOGHLY SM/13345 SOURCE AUGMENTATION OF KULIHANDA PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK Augmentation 22/08/2022 511 225.59 225.59 11/08/2023 11 253.36
231 HOOGHLY SM/14982 Gobindanagar (Zone-II) Piped Water Supply Scheme, Block- Goghat-I, District- Hooghly New 30/09/2022 1,829 886.42 886.42 23/05/2023 10 690.89
232 HOOGHLY SM/14684 GROUND WATER BASED SHANTIPUR (ZONE-2) PIPED WATER SUPPLY SCHEME IN GOGHAT-II BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 30/09/2022 806 494.21 494.21 31/10/2023 8 4,306.42
233 HOOGHLY SM/14118 GROUND WATER BASED RADHABALLAVPUR (ZONE-I) PIPED WATER SUPPLY SCHEME IN KHANAKUL-I BLOCK UNDER HOOGHLY DIVISION, DISTRICT HOOGHLY New 30/09/2022 2,117 958.51 958.51 25/11/2024 11 270.46
234 HOOGHLY SM/13412 Shyamsundarpur Mini Piped Water Supply Scheme New 09/09/2022 94 42.66 42.66 0 0.00
235 HOOGHLY SM/14531 DASHGHARA PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK New 22/08/2022 5,064 1,227.07 1,227.07 11/08/2023 9 278.46
236 HOOGHLY SM/16448 Development of Jangalpara Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC by Local Panchayat under Augmentation 16/11/2022 100 51.36 63.58 18/05/2023 6 55.09
237 HOOGHLY SM/15891 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR DHARAMPUR W/S SCHEME Augmentation 16/11/2022 2,353 151.75 151.75 28/04/2023 11 83.46
238 HOOGHLY SM/15811 Source Augmentation of KANPUR Piped Water Supply Scheme under Arambag Block Augmentation 16/11/2022 25 65.58 65.58 17/05/2023 4 44.45
239 HOOGHLY SM/15812 Source Augmentation of DAKSHIN RASULPUR Piped Water Supply Scheme under Arambag Block Augmentation 16/11/2022 50 75.87 75.87 22/05/2023 4 43.95
240 HOOGHLY SM/15813 Source Augmentation of BHANGAMORA Piped Water Supply Scheme under Pursurah Block Augmentation 16/11/2022 25 72.23 72.23 18/05/2023 6 63.81
241 HOOGHLY SM/16236 Bighati Piped Water Supply Scheme, Block- Singur, District-Hooghly New 26/09/2022 1,850 851.51 851.51 21/02/2024 5 91.54
242 HOOGHLY SM/16237 GROUND WATER BASED NAOPARA PIPED WATER SUPPLY SCHEME IN KHANAKUL-II BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 28/12/2022 124 55.70 55.70 03/05/2023 5 33.38
243 HOOGHLY SM/15815 Source Augmentation of Hazipur Piped Water Supply Scheme under Goghat-II Block Augmentation 16/11/2022 25 67.86 67.86 19/12/2024 2 27.96
244 HOOGHLY SM/18101 BALIDAHA PWSS PIPED WATER SUPPLY SCHEME UNDER DHANIAKHALI BLOCK. New 10/03/2023 328 224.39 224.39 12/05/2023 6 129.51
245 HOOGHLY SM/18110 Retrofitting works for providing functional household tap connection within the left out mouza of Baruipara water supply scheme Retrofitting 10/03/2023 1,776 142.51 142.51 23/07/2025 4 116.44
246 HOOGHLY SM/17290 GROUND WATER BASED MAHISHGOT PIPED WATER SUPPLY SCHEME IN ARAMBAG BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 26/09/2022 706 400.40 400.40 24/03/2023 5 276.37
247 HOOGHLY SM/18310 Pol Piped Water Supply Scheme, Block- Khanakul-I, District-Hooghly New 30/09/2022 3,156 1,372.02 1,372.02 22/10/2024 5 89.46
248 HOOGHLY SM/19036 Augmentation of Surface Water Based Piped Water Supply Scheme for Arsenic affected Balagarh and Pandua Block in Hooghly District Augmentation 28/12/2022 1,03,628 25,800.80 25,800.80 26/09/2024 24 31,768.60
249 HOOGHLY SM/18594 GROUND WATER BASED BALUNDI PIPED WATER SUPPLY SCHEME IN ARAMBAG BLOCK UNDER HOOGHLY DIVISION, HOOGHLY DISTRICT New 30/09/2022 2,500 1,120.56 1,120.56 05/11/2024 9 131.75
250 HOOGHLY SM/09825 Bilaspur Piped Water Supply Scheme. New 08/01/2021 8,919 2,255.49 2,255.49 01/04/2022 41 1,624.67
251 HOOGHLY SM/10135 Retrofitting Works For providing Functional House hold Tap Connection(FHTC)Within the Command Area Bhabanipur Char Water Supply Scheme of Balagarh Block Under Hooghly Division, P.H.E Dte Retrofitting 16/12/2021 2,163 137.19 137.19 16/08/2022 3 85.17
252 HOOGHLY SM/09791 AUGMENTATION OF GROUND WATER BASED PWSS FOR PASCHIM GOPINATHPUR Augmentation 22/11/2021 2,698 885.42 885.42 20/04/2022 23 735.27
253 HOOGHLY SM/18928 Improvement of PURBA THAKURANICHAK Piped Water Supply Scheme to provide FHTC within uncovered villages under Command Area of the Scheme Block- Khanakul-I Augmentation 10/03/2023 0 162.48 162.48 17/05/2023 3 69.96
254 HOOGHLY SM/18373 BHAGABATIPUR PIPED WATER SUPPLY SCHEME BLOCK : CHANDITALA-I, DISTRICT : HOOGHLY. New 16/11/2022 4,229 1,258.73 1,258.73 26/09/2024 11 1,266.51
255 HOOGHLY SM/19015 GROUND WATER BASED GOPALDAHA PIPED WATER SUPPLY SCHEME IN ARAMBAGH BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT ' New 28/12/2022 296 170.87 170.87 11/10/2023 3 34.91
256 HOOGHLY SM/18645 Augmentation Of Piped Water Supply Scheme For KHANAKUL Augmentation 16/11/2022 3,930 1,200.12 1,200.12 09/08/2024 11 905.29
257 HOOGHLY SM/18974 SOURCE AUGMENTATION OF JAYRAMBATI PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK Augmentation 10/03/2023 0 188.47 188.47 18/12/2023 6 99.29
258 HOOGHLY SM/18935 SOURCE AUGMENTATION OF EKTARPUR PIPED W/S SCHEME UNDER BALAGARH BLOCK Augmentation 10/03/2023 0 188.47 188.47 06/11/2023 6 184.09
259 HOOGHLY SM/18939 SOURCE AUGMENTATION OF DWARBASINI PIPED W/S SCHEME UNDER PANDUA BLOCK Augmentation 10/03/2023 0 188.47 188.47 19/02/2025 4 32.13
260 HOOGHLY SM/18940 SOURCE AUGMENTATION OF CHAPTA PIPED W/S SCHEME UNDER PANDUA BLOCK Augmentation 10/03/2023 0 188.47 188.47 06/11/2023 8 189.05
261 HOOGHLY SM/18670 Augmentation of Dihibatpur Piped Water Supply Scheme, Block- Pursura, District-Hooghly Augmentation 22/08/2022 4,182 1,132.16 1,132.16 07/08/2023 7 971.26
262 HOOGHLY SM/18955 Source Augmentation Of KEOTA Piped Water Supply Scheme Under Chinsurah Magra Block Augmentation 10/03/2023 0 67.84 67.84 15/07/2024 3 16.56
263 HOOGHLY SM/18956 Source Augmentation of HASAMPUR Piped Water Supply Scheme under Dhaniakhali Block Augmentation 10/03/2023 0 67.84 67.84 12/03/2024 2 15.71
264 HOOGHLY SM/18945 SOURCE AUGMENTATION OF JAMGRAM PIPED W/S SCHEME UNDER PANDUA BLOCK Augmentation 10/03/2023 0 188.47 188.47 29/02/2024 7 30.77
265 HOOGHLY SM/18948 Source Augmentation of HANRAL Piped Water Supply Scheme under Polba Dadpur Block Augmentation 10/03/2023 0 153.27 153.27 09/08/2024 7 107.64
266 HOOGHLY SM/06756 Retrofitting Works of BALI PWSS for providing 1286 nos Functional Household Tap Connection (FHTC) Retrofitting 28/08/2020 1,286 99.92 99.92 24/11/2020 1 97.60
267 HOOGHLY SM/06990 Retrofitting work for providing Functional Household Tap Connection (FHTC) within the command area of Harishchak (Right bank of Sundeswari river) Water Supply Scheme Retrofitting 25/09/2020 2,215 80.57 80.57 17/12/2020 1 157.56
268 HOOGHLY SM/06762 Retrofitting Works for providing Functional Household Tap Connection (FHTC) within the Shitalpur & Pandugram Mouza of Arandi Water Supply Scheme Retrofitting 28/08/2020 1,187 87.72 87.72 01/12/2021 2 58.55
269 HOOGHLY SM/09423 SOURCE AUGMENTATION OF ANTPUR PIPED WATER SUPPLY SCHEME. Augmentation 29/09/2021 3,352 43.82 43.82 08/09/2022 10 51.41
270 HOOGHLY SM/09071 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF UTTAR CHANDANNAGAR WATER SUPPLY SCHEME. Retrofitting 19/08/2021 800 50.04 50.04 30/06/2023 2 5.69
271 HOOGHLY SM/10339 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR JANGIPARA. Augmentation 19/08/2021 5,839 1,352.90 1,352.90 31/07/2023 29 1,380.56
272 HOOGHLY SM/09688 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAKNAN BLOCK: KHANKUL-II Augmentation 19/08/2021 1,324 278.45 278.45 25/03/2023 12 326.62
273 HOOGHLY SM/09689 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KHARSARAI. Augmentation 19/08/2021 1,738 333.93 333.93 10/06/2024 10 289.50
274 HOOGHLY SM/10134 Retrofitting Works for providing Functional House hold Tap Connection(FHTC)Within the Command Area of Itagarh Water Supply Scheme of Balagarh Block Under Hooghly Division, P.H.E Dte Retrofitting 16/12/2021 1,386 88.95 88.95 21/09/2022 4 62.17
275 HOOGHLY SM/10136 Retrofitting works for Providing Functional Household Tap Connection (FHTC) within the command are a of Shibrai W/S Scheme Retrofitting 16/12/2021 1,694 104.32 104.32 10/03/2022 4 76.63
276 HOOGHLY SM/09775 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF KOLA WATER SUPPLY SCHEME UNDER CHINSURAH-MOGRA BLOCK OF CHINSURHA SUB-DIVISION UNDER HOOGHLY DIVISION PHE DTE. Retrofitting 19/08/2021 4,182 234.97 234.97 06/05/2021 5 164.77
277 HOOGHLY SM/09777 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF BASUDEBBATI WATER SUPPLY SCHEME UNDER POLBA-DADPUR BLOCK OF CHINSURHA SUB-DIVISION UNDER HOOGHLY DIVISION PHE DTE. Retrofitting 19/08/2021 2,123 125.76 131.10 31/05/2022 4 94.78
278 HOOGHLY SM/11001 RETROFITTING WORKS OF BHASTARA PWSS FOR PROVIDING 2289 NOS. FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITH IN COMMAND AREA OF THE SCHEME UNDER HOOGHLY DIVISION P.H.E DTE. Retrofitting 16/03/2022 2,289 128.04 128.04 19/10/2022 2 67.36
279 HOOGHLY SM/11005 RETROFITTING WORKS FOR PROVIDING FHTC WITHIN THE COMMAND AREA OF SOMRA WATER SUPPLY SCHEME Retrofitting 16/03/2022 4,206 270.62 270.62 02/05/2024 6 232.83
280 HOOGHLY SM/12262 KHAJURDAHA W/S SCHEME UNDER DHANIAKHALI BLOCK New 22/08/2022 2,542 749.81 749.81 27/09/2024 7 109.87
281 HOOGHLY SM/12235 GROUND WATER BASED NATIBPUR PIPED WATER SUPPLY SCHEME IN KHANAKUL-II BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 22/08/2022 3,207 981.16 981.16 25/11/2024 8 190.55
282 HOOGHLY SM/12229 KAMALPUR PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK New 22/08/2022 3,651 823.30 823.30 17/08/2023 6 5,973.75
283 HOOGHLY SM/11167 Augmentation of Ground Water Based Piped Water Supply Scheme for Madhusudanpur Augmentation 17/02/2022 1,843 494.57 494.57 06/04/2023 11 404.29
284 HOOGHLY SM/11463 AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE Augmentation 30/03/2022 3,369 974.92 974.92 21/02/2023 24 1,106.63
285 HOOGHLY SM/13670 Digra Mini Piped Water Supply Scheme New 09/09/2022 53 38.05 38.05 19/08/2023 2 28.45
286 HOOGHLY SM/13557 Kaipukuria Mini Piped Water Supply Scheme New 09/09/2022 82 41.09 41.09 0 0.00
287 HOOGHLY SM/13596 Chautpur Mini Piped Water Supply Scheme New 09/09/2022 98 43.04 43.04 0 0.00
288 HOOGHLY SM/13560 Basantapur Mini Piped Water Supply Scheme New 09/09/2022 93 42.06 42.06 17/08/2023 2 177.73
289 HOOGHLY SM/13346 SOURCE AUGMENTATION OF AMODGHATA PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK Augmentation 22/08/2022 1,868 140.89 214.65 23/08/2022 8 161.63
290 HOOGHLY SM/13404 BAHIRKHANDA PIPED WATER SUPPLY SCHEME New 25/04/2022 3,610 1,616.96 1,616.96 08/06/2023 9 1,112.22
291 HOOGHLY SM/13589 Adra mini pipe water supply scheme New 09/09/2022 91 43.03 43.03 02/08/2023 2 33.28
292 HOOGHLY SM/13568 BINAGRAM PIPED WATER SUPPLY SCHEME New 25/04/2022 2,669 1,145.89 1,145.89 01/08/2023 8 802.03
293 HOOGHLY SM/13321 GHATAMPUR PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK New 09/09/2022 3,505 883.11 883.11 03/05/2023 6 117.94
294 HOOGHLY SM/15249 Ground Water Based Bighati (Zone -II) PWSS New 30/09/2022 1,579 711.52 711.52 12/04/2023 8 577.39
295 HOOGHLY SM/16449 Development of Borhal (Zone-I) Piped Water Supply Scheme by Installing Two (2) Nos. Tube Well including Connection with Distribution, Switch Room & other allied work to meet up the additional water demand induced after execution of FHTC under Serampore Se Augmentation 16/11/2022 50 128.70 128.70 18/05/2023 10 135.67
296 HOOGHLY SM/15890 GOPALPUR PIPED WATER SUPPLY SCHEME BLOCK : JANGIPARA, DISTRICT : HOOGHLY. New 16/11/2022 2,876 986.35 995.46 17/08/2023 11 1,079.17
297 HOOGHLY SM/10341 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR MALAYPUR. Augmentation 19/08/2021 0 1,037.36 1,037.36 19/09/2023 18 910.64
298 HOOGHLY SM/16564 Augmentation of Kulteghori Piped Water Supply Scheme Augmentation 26/09/2022 2,963 59.10 59.10 18/08/2023 4 68.74
299 HOOGHLY SM/15799 SOURCE AUGMENTATION OF BADINAN PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK Augmentation 16/11/2022 2,683 201.57 201.57 14/06/2024 14 124.34
300 HOOGHLY SM/18097 KHORDAAPURBAPUR PIPED WATER SUPPLY SCHEME New 10/03/2023 934 362.38 362.38 09/04/2024 9 226.79
301 HOOGHLY SM/18104 Hijali Piped Water Supply Scheme, Block-Jangipara, District-Hooghly New 10/03/2023 891 554.56 554.56 03/04/2025 11 439.85
302 HOOGHLY SM/18107 Retrofitting work for Providing Functional Household Tap Connection (FHTC) within the uncovered portion of Dantra Water Supply Scheme Under Polba Dadpur Block Retrofitting 10/03/2023 180 21.70 21.70 15/06/2023 1 11.42
303 HOOGHLY SM/18308 GROUND WATER BASED UDAYPUR PIPED WATER SUPPLY SCHEME IN KHANAKUL-I BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 26/09/2022 3,198 1,433.95 1,433.95 03/10/2024 5 103.78
304 HOOGHLY SM/18309 Udna Piped Water Supply Scheme, Block-Khanakul I, District- Hooghly New 30/09/2022 2,455 1,026.73 1,026.73 11/10/2023 4 56.49
305 HOOGHLY SM/17176 JAGANNATHBATI PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY New 30/09/2022 793 277.86 277.86 10/04/2023 8 261.56
306 HOOGHLY SM/07958 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF BAHADURPUR WATER SUPPLY SCHEME. Retrofitting 08/01/2021 2,122 119.68 119.68 06/05/2021 3 133.49
307 HOOGHLY SM/09072 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF DEBANANDAPUR WATER SUPPLY SCHEME. Retrofitting 19/08/2021 3,956 42.14 42.14 14/12/2021 2 34.56
308 HOOGHLY SM/11289 GAURIBATI PIPED WATER SUPPLY SCHEME New 16/03/2022 1,387 464.35 464.35 29/09/2022 13 445.13
309 HOOGHLY SM/13668 Sibpur Mini Piped Water Supply Scheme New 09/09/2022 42 37.24 37.24 0 0.00
310 HOOGHLY SM/18347 Augmentation of Shyampur Piped Water Supply Scheme, Block- Pursura, District-Hooghly. Augmentation 09/09/2022 4,186 1,047.32 1,047.32 03/08/2023 6 882.44
311 HOOGHLY SM/18791 Source Augmentation of Panchghora W/S Scheme under Serampore Sub-Division of Hooghly Division, P.H.E. Dte. [Block-Chanditala-II] Augmentation 16/11/2022 3,233 72.46 72.46 17/04/2023 4 27.00
312 HOOGHLY SM/18833 Mayapur Piped Water Supply Scheme. New 04/12/2020 2,505 1,143.23 1,143.23 22/09/2023 8 533.51
313 HOOGHLY SM/18977 SOURCE AUGMENTATION OF MANDARAN PIPED W/S SCHEME UNDER PANDUA BLOCK Augmentation 10/03/2023 0 188.47 188.47 14/06/2024 3 30.70
314 HOOGHLY SM/18668 GROUND WATER BASED TIROL (ZONE-I) PIPED W/S SCHEME UNDER ARAMBAGH BLOCK New 28/12/2022 3,101 1,392.22 1,392.22 07/08/2023 6 828.10
315 HOOGHLY SM/18671 Baligari Piped Water Supply Scheme. New 19/08/2021 3,994 2,067.16 2,067.16 04/10/2024 18 1,248.08
316 HOOGHLY SM/18772 GROUND WATER BASED CHINRA (ZONE-II) PIPED WATER SUPPLY SCHEME IN KHANAKUL-II BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 09/09/2022 3,575 1,654.55 1,654.55 13/11/2024 9 118.29
317 HOOGHLY SM/06754 Providing Functional Household Tap Connection(FHTC) within the Paschim Gobindapur, Nikash and Mathurabati Mouza of Borhal (Zone-I) PWSS Retrofitting 28/08/2020 1,236 73.81 73.81 17/12/2020 4 41.90
318 HOOGHLY SM/07441 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF MANDARA WATER SUPPLY SCHEME. Retrofitting 04/12/2020 2,048 128.62 128.62 15/02/2021 4 249.92
319 HOOGHLY SM/07149 Retrofitting work for providing Functional Household Tap Connection (FHTC) within the command area of Jaykrishnapur (Mathura,Shyambati,Ballabhbati,Dhulepur mouza) Water Supply Scheme Retrofitting 25/09/2020 1,107 77.24 77.24 07/04/2022 2 65.09
320 HOOGHLY SM/07150 Retrofitting work for providing Functional Household Tap Connection (FHTC) within the command area of Jaykrishnapur (Purba Amarpur,Jaykrishnapur mouza) Water Supply Scheme under Retrofitting 25/09/2020 803 56.16 56.16 02/02/2021 2 20.06
321 HOOGHLY SM/07460 Retrofitting work for providing Functional Household Tap Connection (FHTC) within the command area of SANTOSHPUR Water Supply Scheme Retrofitting 25/09/2020 2,391 145.28 145.28 31/07/2025 7 129.75
322 HOOGHLY SM/07953 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF MADPUR WATER SUPPLY SCHEME. Retrofitting 08/01/2021 2,299 78.24 78.24 13/04/2022 5 72.35
323 HOOGHLY SM/06764 Retrofitting Works for providing Functional Household Tap Connection (FHTC) within the Arandi & Mandaran Mouza of Arandi Water Supply Scheme Retrofitting 28/08/2020 976 70.70 70.70 24/11/2020 1 77.63
324 HOOGHLY SM/07537 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF CHANPARAI WATER SUPPLY SCHEME. Retrofitting 04/12/2020 1,515 95.57 95.57 15/02/2021 12 142.78
325 HOOGHLY SM/08744 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF BHANGAMORA WATER SUPPLY SCHEME. Retrofitting 19/02/2021 1,135 76.88 80.90 15/12/2021 1 40.78
326 HOOGHLY SM/09604 Augmentation of PANDUA ZONE 1 Piped Water Supply Scheme by installing ( 01 ) no. Tube well including Connection with Distribution, Switch Room and other allied work to meet up the water demand, hampered due to execution of FHTC. Augmentation 08/10/2021 0 43.94 43.94 02/03/2023 5 14.93
327 HOOGHLY SM/09207 Augmentation of DEBANANDAPUR Piped Water Supply Scheme by installing ( 01 ) no. Tube well including Connection with Distribution, Switch Room and other allied work to meet up the water demand, hampered due to execution of FHTC. Augmentation 15/09/2021 0 35.42 35.42 19/04/2023 4 55.23
328 HOOGHLY SM/07535 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF LAKSHMIPUR WATER SUPPLY SCHEME. Retrofitting 04/12/2020 883 57.39 57.39 19/01/2022 2 52.00
329 HOOGHLY SM/10467 Augmentation of Chanparai Water Supply Scheme Augmentation 27/01/2022 1,711 414.46 414.46 04/04/2025 11 331.61
330 HOOGHLY SM/10468 Augmentation of Polba Water Supply Scheme Augmentation 27/01/2022 4,025 963.64 963.64 26/09/2023 34 897.65
331 HOOGHLY SM/09790 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAMARPUKUR. Augmentation 19/08/2021 2,619 508.53 508.53 06/11/2023 15 455.65
332 HOOGHLY SM/10338 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR CHANDITALA. Augmentation 19/08/2021 10,123 1,306.66 1,306.66 17/04/2025 55 1,179.59
333 HOOGHLY SM/12251 RUDRANI PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK New 22/08/2022 2,417 605.31 605.31 03/05/2023 5 70.23
334 HOOGHLY SM/12254 GURBARI PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK New 22/08/2022 2,763 608.75 608.75 17/07/2023 8 2,460.51
335 HOOGHLY SM/11468 AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR MANDRA UNDER ARAMBAGH SUB DIV PHE DTE Augmentation 30/03/2022 2,800 709.16 709.16 22/08/2023 23 685.09
336 HOOGHLY SM/11582 PURUSHOTTAMPUR PIPED WATER SUPPLY SCHEME New 25/04/2022 1,724 681.54 681.54 25/11/2024 6 132.83
337 HOOGHLY SM/11583 GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEME FOR THE BLOCKS OF GOGHAT-II,KHANAKUL-I, KHANAKUL-II, PURSURA & BALAGARH IN HOOGHLY DISTRICT New 25/04/2022 1,656 997.69 997.69 27/12/2022 6 1,284.70
338 HOOGHLY SM/11462 AUGMENTATION OF GROUND BASED PIPED WATER SUPPLY SCHEME FOR BARADANGAL UNDER ARAMBAGH SUB DIV PHE DTE Augmentation 30/03/2022 2,600 765.32 765.32 22/08/2022 13 588.35
339 HOOGHLY SM/07955 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF EKTARPUR WATER SUPPLY SCHEME. Retrofitting 08/01/2021 2,860 166.55 166.55 06/05/2021 4 180.69
340 HOOGHLY SM/06757 Retrofitting Works for Digsui-Heora (Zone-I) PWSS for providing 1374 nos Functional Household Tap Connection(FHTC) Retrofitting 28/08/2020 3,925 99.73 99.73 08/12/2020 0 4.98
341 HOOGHLY SM/13355 RETROFITTING WORKS OF DWARBASINI PWSS FOR PROVIDING 2150 NOS. FUNCTIONAL HOUSE HOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF THE SCHEME UNDER HOOGHLY DIVISION, PHE DTE Retrofitting 22/08/2022 2,150 139.24 139.24 11/08/2023 2 43.59
342 HOOGHLY SM/13593 Sultangachha Mini Piped Water Supply Scheme New 09/09/2022 72 40.81 40.81 0 0.00
343 HOOGHLY SM/13598 Jangalpur Mini Piped Water Supply Scheme New 09/09/2022 95 42.73 42.73 0 0.00
344 HOOGHLY SM/13322 GROUND WATER BASED MARAKHANA (ZONE-II) PIPED WATER SUPPLY SCHEME IN KHANAKUL-II BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 09/09/2022 1,951 862.94 862.94 03/05/2023 6 96.66
345 HOOGHLY SM/14685 SELAMPUR WATER SUPPLY SCHEME (ZONE-II) New 30/09/2022 2,176 690.25 690.25 05/03/2024 8 149.50
346 HOOGHLY SM/13590 Chak mamrej mini pipe water supply scheme New 09/09/2022 88 42.75 42.75 02/08/2023 1 32.46
347 HOOGHLY SM/15243 AUGMENTATION OF HARIT PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK Augmentation 30/09/2022 1,459 482.37 482.37 09/02/2023 9 353.48
348 HOOGHLY SM/15247 Gobindanagar (Zone-I) Piped Water Supply Scheme, Block-Goghat-I, District-Hooghly New 30/09/2022 1,796 797.78 797.78 05/12/2023 8 88.03
349 HOOGHLY SM/15252 SELAMPUR WATER SUPPLY SCHEME (ZONE-I) New 30/09/2022 2,352 726.99 726.99 10/09/2024 7 143.22
350 HOOGHLY SM/15790 GROUND WATER BASED MAYAPUR (ZONE-II) PIPED WATER SUPPLY SCHEME IN ARAMBAG BLOCK UNDER HOOGHLY DIVISION, HOOGHLY New 16/11/2022 993 432.75 432.75 02/06/2023 9 656.85
351 HOOGHLY SM/15889 Sibrambati (Zone-I) Piped Water Supply Scheme, Block- Singur, District-Hooghly New 16/11/2022 2,516 884.94 884.94 03/08/2023 13 671.57
352 HOOGHLY SM/15807 Source Augmentation of PRATAPNAGAR Piped Water Supply Scheme under Arambag Block Augmentation 16/11/2022 50 128.96 128.96 19/05/2023 6 85.71
353 HOOGHLY SM/15901 IMPROVEMENT OF KOLA W/S SCHEME BY LAYING OF HDPE PIPELINE BY HDD PROCESS UNDER CHINSURAH SUB DIVISION UNDER CHINSURAH MAGRA BLOCK Augmentation 16/11/2022 0 219.96 219.96 20/04/2023 1 96.46
354 HOOGHLY SM/15792 GROUND WATER BASED ARUNDA (ZONE-II) PIPED WATER SUPPLY SCHEME IN KHANAKUL-I BLOCK UNDER HOOGHLY DIVISION, DISTRICT HOOGHLY New 16/11/2022 1,899 910.60 916.78 03/08/2023 11 644.20
355 HOOGHLY SM/18096 BHANDARDAHA PIPED WATER SUPPLY SCHEME New 10/03/2023 368 214.91 214.91 09/04/2024 6 119.23
356 HOOGHLY SM/18100 KALACHHARA PIPED WATER SUPPLY SCHEME New 10/03/2023 292 190.75 190.75 09/04/2024 9 132.99
357 HOOGHLY SM/18241 NAWPARA PIPED WATER SUPPLY SCHEME New 16/11/2022 2,929 1,152.24 1,152.24 04/10/2024 7 894.27
358 HOOGHLY SM/17289 GROUND WATER BASED BAINCHIPOTA(ZONE-I) PWSS New 26/09/2022 1,715 787.21 787.21 10/04/2023 8 543.17
359 HOOGHLY SM/18595 GROUND WATER BASED MAHISGOT (ZONE-I) PIPED WATER SUPPLY SCHEME IN KHANAKUL-I BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 30/09/2022 2,659 1,140.41 1,140.41 11/10/2023 3 27.91
360 HOOGHLY SM/09772 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF RAJHAT WATER SUPPLY SCHEME UNDER POLBA-DADPUR BLOCK OF CHINSURHA SUB-DIVISION UNDER HOOGHLY DIVISION PHE DTE. Retrofitting 19/08/2021 5,146 313.36 337.05 31/05/2022 23 323.18
361 HOOGHLY SM/18932 SOURCE AUGMENTATION OF SRIPUR BALAGARH PIPED W/S SCHEME UNDER BALAGARH BLOCK Augmentation 10/03/2023 0 188.47 188.47 05/11/2024 5 202.32
362 HOOGHLY SM/18770 Augmentation of Balipur Water Supply Scheme Augmentation 22/08/2022 4,804 1,152.80 1,152.80 10/06/2025 10 934.58
363 HOOGHLY SM/17625 GROUND WATER BASED PURBBA KRISHNAPUR PIPED WATER SUPPLY SCHEME IN ARAMBAGH BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 28/12/2022 1,354 685.43 685.43 08/06/2023 7 529.27
364 HOOGHLY SM/17627 GROUND BASED PWSS FOR NASIBPUR New 28/12/2022 2,463 900.19 900.19 08/06/2023 13 725.96
365 HOOGHLY SM/18968 Source Augmentation of BORHAL Piped Water Supply Scheme by installing new Two (2) Nos. Tube Wells including Connection with Distribution & other allied work to meet up the water demand under Serampore Sub-Division of Hooghly Division, P.H.E. Dte. Augmentation 10/03/2023 0 45.23 45.23 20/02/2024 6 20.83
366 HOOGHLY SM/18980 SOURCE AUGMENTATION OF ABDULPUR PIPED W/S SCHEME UNDER BALAGAH BLOCK Augmentation 10/03/2023 0 103.03 103.03 29/02/2024 4 16.02
367 HOOGHLY SM/18938 SOURCE AUGMENTATION OF HARAL PIPED W/S SCHEME UNDER PANDUA BLOCK Augmentation 10/03/2023 0 188.47 188.47 19/02/2025 7 63.58
368 HOOGHLY SM/18959 Source Augmentation of DIHI BAYARA Piped Water Supply Scheme Under Arambag Block Augmentation 10/03/2023 0 75.93 75.93 25/11/2024 3 21.51
369 HOOGHLY SM/18942 SOURCE AUGMENTATION OF DUMURDHA PIPED W/S SCHEME UNDER BALAGARH BLOCK Augmentation 10/03/2023 1,766 103.03 103.03 14/06/2024 10 35.17
370 HOOGHLY SM/13334 Ghol Digrui (Zone-I) Piped Water Supply Scheme, Block- Pursura, District-Hooghly New 09/09/2022 2,537 942.99 942.99 13/11/2024 11 190.36
371 HOOGHLY SM/07461 Retrofitting work for providing Functional Household Tap Connection (FHTC) within the command area of PRATAPNAGAR Water Supply Scheme Retrofitting 25/09/2020 1,814 111.14 111.14 02/11/2021 5 104.21
372 HOOGHLY SM/07950 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF PATNA BHAIRABPUR WATER SUPPLY SCHEME. Retrofitting 08/01/2021 2,559 99.37 99.37 03/02/2021 1 117.65
373 HOOGHLY SM/07954 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF PASCHIM JOYKRISHNAPUR WATER SUPPLY Retrofitting 08/01/2021 4,296 247.47 247.47 19/05/2023 6 228.69
374 HOOGHLY SM/07536 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF GOBINDAPUR WATER SUPPLY SCHEME. Retrofitting 04/12/2020 1,270 81.79 81.79 03/09/2021 5 130.70
375 HOOGHLY SM/07538 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF NATAGARI WATER SUPPLY SCHEME. Retrofitting 04/12/2020 502 32.62 32.62 15/02/2021 3 47.59
376 HOOGHLY SM/09208 Augmentation of NALDANGA Piped Water Supply Scheme by Tube well Connection with Distribution, Switch Room and other allied work to meet up the water demand, hampered due to execution of FHTC. Augmentation 15/09/2021 0 35.42 35.42 27/07/2023 6 12.11
377 HOOGHLY SM/09776 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF MEGSAR WATER SUPPLY SCHEME UNDER POLBA-DADPUR BLOCK OF CHINSURHA SUB-DIVISION UNDER HOOGHLY DIVISION PHE DTE. Retrofitting 19/08/2021 2,181 130.24 130.24 21/09/2022 1 87.34
378 HOOGHLY SM/11002 RETROFITTING WORKS FOR PROVIDING FHTC WITHIN THE COMMAND AREA OF BAINCHI WATER SUPPLY SCHEME Retrofitting 16/03/2022 4,068 308.36 371.11 22/03/2023 6 642.53
379 HOOGHLY SM/10022 AUGMENTATION OF GROUND WATER BASED PWSS FOR OLIPUR Augmentation 22/11/2021 7,976 2,250.51 2,250.51 16/11/2023 27 1,297.49
380 HOOGHLY SM/10023 Augmentation of Salepur-Duttapur Water Supply Scheme Augmentation 22/11/2021 4,593 1,460.01 1,460.01 23/06/2022 14 1,131.94
381 HOOGHLY SM/12253 KANAJOLI PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK New 22/08/2022 1,882 576.69 576.69 03/05/2023 5 63.09
382 HOOGHLY SM/12257 CHALUA W/S SCHEME UNDER DHANIAKHALI BLOCK New 22/08/2022 3,762 811.45 811.45 03/05/2023 6 96.41
383 HOOGHLY SM/12245 DUDHKALMI PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-I, DISTRICT: HOOGHLY. New 22/08/2022 2,741 688.42 688.42 28/04/2023 6 94.85
384 HOOGHLY SM/12247 DALIMBA PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK New 22/08/2022 1,847 553.34 553.34 03/05/2023 6 44.83
385 HOOGHLY SM/11581 AIMA CHAPSARA PIPED WATER SUPPLY SCHEME New 25/04/2022 1,489 695.99 695.99 26/04/2023 21 567.19
386 HOOGHLY SM/12015 RETROFITTING WORKS FOR PROVIDING FHTC WITHIN THE COMMAND AREA OF HARADITYA WATER SUPPLY SCHEME Retrofitting 05/07/2022 2,620 163.75 163.75 29/04/2022 5 164.26
387 HOOGHLY SM/13669 Shripala Mini Piped Water Supply Scheme New 09/09/2022 88 42.07 42.07 0 0.00
388 HOOGHLY SM/13671 Alasin Mini Piped Water Supply Scheme New 09/09/2022 92 42.45 42.45 0 0.00
389 HOOGHLY SM/13672 Jot ram mini pipe water supply scheme New 09/09/2022 76 39.59 39.59 15/05/2023 1 0.47
390 HOOGHLY SM/13762 Hirapur (Zone-II) Piped Water Supply Scheme, Block- Khanakul-II, District-Hooghly New 09/09/2022 2,092 977.91 977.91 05/03/2024 9 238.53
391 HOOGHLY SM/11999 RETROFITTING WORKS FOR PROVIDING FHTC WITHIN THE COMMAND AREA OF BATANAL WATER SUPPLY SCHEME Retrofitting 05/07/2022 3,492 218.68 218.68 29/04/2022 1 75.31
392 HOOGHLY SM/12000 RETROFITTING WORKS FOR PROVIDING FHTC WITHIN THE COMMAND AREA OF ANTPUR WATER SUPPLY SCHEME Retrofitting 05/07/2022 2,300 148.75 148.75 19/09/2024 5 134.01
393 HOOGHLY SM/13656 Chak Behala mini pipe water supply scheme New 09/09/2022 37 35.41 35.41 15/05/2023 1 0.23
394 HOOGHLY SM/13563 Rampur Mini Piped Water Supply Scheme New 09/09/2022 94 42.21 42.21 19/08/2023 1 31.91
395 HOOGHLY SM/13586 Dewanchak Mini Piped Water Supply Scheme New 09/09/2022 25 36.22 36.22 02/08/2023 1 26.52
396 HOOGHLY SM/13595 Ghosha Mini Piped Water Supply Scheme New 09/09/2022 92 41.94 41.94 15/05/2023 1 0.57
397 HOOGHLY SM/13552 Belun Mini Piped Water Supply Scheme New 09/09/2022 85 41.57 41.57 27/12/2022 2 94.21
398 HOOGHLY SM/13556 Saibana Mini Piped Water Supply Scheme New 09/09/2022 84 41.70 41.70 0 0.00
399 HOOGHLY SM/13415 Charkona Mini Piped Water Supply Scheme New 09/09/2022 25 34.85 34.85 0 0.00
400 HOOGHLY SM/13561 Durlabhpur Mini Piped Water Supply Scheme New 09/09/2022 74 39.95 39.95 19/08/2023 1 29.83
401 HOOGHLY SM/13592 Bara Kumursa mini pipe water supply scheme New 09/09/2022 63 40.14 40.14 02/08/2023 2 30.47
402 HOOGHLY SM/13335 PARJANA PIPED WATER SUPPLY SCHEME New 09/09/2022 2,350 950.00 950.00 17/05/2023 9 762.78
403 HOOGHLY SM/13357 RETROFITTING WORKS OF AMODGHATA PWSS FOR PROVIDING 600 NOS. FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN COMMAND AREA OF THE SCHEME UNDER HOOGHLY DIVISION PHE DTE. Retrofitting 22/08/2022 600 38.98 38.98 19/04/2023 2 37.30
404 HOOGHLY SM/15250 REFAITPUR (ZONE-I) PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK New 30/09/2022 1,095 345.51 345.51 10/03/2023 8 346.39
405 HOOGHLY SM/15251 REFAITPUR (ZONE-II) PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK New 30/09/2022 1,570 336.90 336.90 20/02/2024 4 256.35
406 HOOGHLY SM/15793 Source Augmentation of Santoshpur Piped Water Supply scheme, Block- Tarakeswar, District-Hooghly Augmentation 16/11/2022 610 52.29 52.29 10/05/2023 4 41.09
407 HOOGHLY SM/15794 Source Augmentation of Bamonjol PWSS Augmentation 16/11/2022 1,233 55.16 55.16 19/05/2023 3 23.99
408 HOOGHLY SM/07952 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF HANRAL WATER SUPPLY SCHEME. Retrofitting 08/01/2021 3,320 212.07 212.07 06/05/2021 7 289.15
409 HOOGHLY SM/16447 Development of Krishnarampur Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC by Local Panchayat und Augmentation 16/11/2022 1,450 109.03 109.03 20/04/2023 9 119.70
410 HOOGHLY SM/16121 Source Augmentation of SABALSINGHAPUR Piped Water Supply Scheme under Khanakul-II Block Augmentation 28/12/2022 25 163.66 163.66 18/05/2023 12 123.54
411 HOOGHLY SM/15898 Development of ANIYA Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC. Block : Chanditala-I, Distric Augmentation 16/11/2022 200 71.13 71.13 18/05/2023 6 53.66
412 HOOGHLY SM/15900 SOURCE AUGMENTATION OF PATNA BHAIRAVPUR W/S SCHEME UNDER POLBA DADPUR BLOCK Augmentation 16/11/2022 300 114.30 114.30 13/11/2024 7 37.76
413 HOOGHLY SM/15913 GROUND WATER BASED DAHAR KUNDU (ZONE-II) PIPED WATER SUPPLY SCHEME IN ARAMBAG BLOCK UNDER HOOGHLY DIVISION, HOOGHLY DISTRICT New 30/09/2022 2,200 907.78 907.78 31/10/2023 7 2,406.65
414 HOOGHLY SM/16119 AUGMENTATION OF HANRAL Z-I PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK Augmentation 28/12/2022 200 558.04 558.04 19/04/2023 7 547.77
415 HOOGHLY SM/18099 KALORA PIPED W/S SCHEME (FOR UNCOVERED AREA) UNDER POLBA DADPUR BLOCK New 10/03/2023 522 241.67 241.67 19/07/2023 6 141.38
416 HOOGHLY SM/18102 Bara Mallikpur Mini Piped Water Supply Scheme, Block- Dhaniakhali, District-Hooghly New 10/03/2023 96 45.54 45.54 12/05/2023 5 41.81
417 HOOGHLY SM/18320 MUNDALIKA PIPED WATER SUPPLY SCHEME BLOCK : JANGIPARA, DISTRICT : HOOGHLY New 16/11/2022 4,389 1,374.35 1,374.35 03/08/2023 9 1,358.96
418 HOOGHLY SM/11291 NAITA PIPED WATER SUPPLY SCHEME New 16/03/2022 2,196 817.35 817.35 29/09/2022 13 720.37
419 HOOGHLY SM/17628 GROUND BASED PIPED WATER SUPPLY SCHEME FOR DIARA PWSS New 28/12/2022 2,306 764.21 764.21 08/06/2023 7 525.68
420 HOOGHLY SM/18288 GROUND WATER BASED MADHABPUR PIPED WATER SUPPLY SCHEME IN ARAMBAG BLOCK UNDER HOOGHLY DIVISION, HOOGHLY DISTRICT New 30/09/2022 2,787 1,182.64 1,182.64 04/10/2024 8 148.29
421 HOOGHLY SM/18307 GROUND WATER BASED KUMURSA PIPED WATER SUPPLY SCHEME IN GOGHAT-I BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 26/09/2022 2,440 1,089.72 1,089.72 04/10/2024 7 761.35
422 HOOGHLY SM/18596 GROUND WATER BASED SELALPUR PIPED WATER SUPPLY SCHEME IN ARAMBAG BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 30/09/2022 2,863 1,182.91 1,182.91 22/10/2024 6 78.61
423 HOOGHLY SM/18623 GANGADHARPUR PIPED WATER SUPPLY SCHEME BLOCK : CHANDITALA-I DISTRICT : HOOGHLY. New 30/09/2022 4,209 1,061.62 1,061.62 26/09/2024 24 201.82
424 HOOGHLY SM/18771 Hirapur (Zone-I) Piped Water Supply Scheme, Block- Khanakul-II, District-Hooghly New 09/09/2022 2,347 1,074.94 1,074.94 11/10/2023 5 57.17
425 HOOGHLY SM/07947 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF PUINAN WATER SUPPLY SCHEME. Retrofitting 08/01/2021 2,555 83.61 83.61 01/12/2021 2 62.88
426 HOOGHLY SM/07540 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF ABDULPUR WATER SUPPLY SCHEME. Retrofitting 04/12/2020 1,068 66.84 66.84 15/02/2021 5 94.47
427 HOOGHLY SM/11165 RETROFITTING WORKS FOR PROVIDING FHTC WITHIN THE COMMAN AREA OF DUMURDAHA WATER SUPPLY SCHEME Retrofitting 16/03/2022 5,831 264.04 264.04 07/04/2022 8 145.44
428 HOOGHLY SM/17632 JAGMOHANPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-I, DISTRICT: HOOGHLY. New 22/08/2022 2,018 634.00 637.99 28/04/2023 6 82.18
429 HOOGHLY SM/18933 SOURCE AUGMENTATION OF NATUNCHAR KRISHNABATI PIPED W/S SCHEME UNDER BALAGARH BLOCK Augmentation 10/03/2023 0 188.47 188.47 29/02/2024 2 22.77
430 HOOGHLY SM/18348 Ghol Digrui (Zone-II) Piped Water Supply Scheme , Block- Pursura, District-Hooghly New 09/09/2022 2,581 1,091.61 1,091.61 12/07/2023 7 713.76
431 HOOGHLY SM/18967 Source Augmentation of CHIKRAND ZONE-II Piped Water Supply Scheme by installing One (1) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC by local Augmentation 10/03/2023 0 124.38 124.38 04/12/2024 2 21.49
432 HOOGHLY SM/18970 SOURCE AUGMENTATION OF NAMAJGRAM PIPED W/S SCHEME UNDER PANDUA BLOCK Augmentation 10/03/2023 0 188.47 188.47 06/11/2023 7 198.94
433 HOOGHLY SM/18979 SOURCE AUGMENTATION OF GUPTIPARA PIPED W/S SCHEME UNDER BALAGAH BLOCK Augmentation 10/03/2023 0 103.03 103.03 23/11/2023 1 11.05
434 HOOGHLY SM/18643 Augmentation Of Piped Water Supply Scheme For SRIRAMPUR Augmentation 16/11/2022 5,168 1,148.41 1,148.41 07/08/2023 5 900.53
435 HOOGHLY SM/18975 SOURCE AUGMENTATION OF DEBANANDAPUR PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK Augmentation 10/03/2023 0 188.47 188.47 06/11/2023 10 217.94
436 HOOGHLY SM/18976 SOURCE AUGMENTATION OF NATAGARI PIPED W/S SCHEME UNDER BALAGARH BLOCK Augmentation 10/03/2023 0 188.47 188.47 29/02/2024 4 29.45
437 HOOGHLY SM/18429 GROUND WATER BASED RASULPUR PIPED WATER SUPPLY SCHEME IN PURSURA BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 22/08/2022 3,194 1,139.61 1,139.61 26/07/2023 6 828.39
438 HOOGHLY SM/18936 SOURCE AUGMENTATION OF BELUN PIPED W/S SCHEME UNDER PANDUA BLOCK Augmentation 10/03/2023 0 188.47 188.47 19/02/2025 5 37.36
439 HOOGHLY SM/18954 Source Augmentation Of NALDANGA piped W/S Scheme Under Chinsurah Magra Block Augmentation 10/03/2023 0 153.27 153.27 14/06/2024 10 77.00
440 HOOGHLY SM/15809 Source Augmentation of GANESHBATI Piped Water Supply Scheme under Goghat-I Block Augmentation 16/11/2022 50 153.03 153.03 15/06/2023 6 83.30
441 HOOGHLY SM/18941 SOURCE AUGMENTATION OF AYMANABABPUR PIPED W/S SCHEME UNDER PANDUA BLOCK Augmentation 10/03/2023 0 188.47 188.47 21/11/2023 7 92.27
442 HOOGHLY SM/18949 Source Augmentation of SUDARSHAN Piped W/S Scheme Under Polba Dadpur Block. Augmentation 10/03/2023 0 144.76 144.76 20/02/2024 3 14.23
443 HOOGHLY SM/06755 Retrofitting Works of BAKSA PWSS for providing 1522 nos Functional Household Tap Connection(FHTC) Retrofitting 28/08/2020 1,522 99.95 99.95 26/02/2021 4 141.35
444 HOOGHLY SM/06758 Retrofitting Works for Providing Functional Household Tap Connection(FHTC) within the Rajarambati, Talandu, Taragun Mouza of Digsui-Heora (Zone-II) PWSS Retrofitting 28/08/2020 984 74.68 74.68 19/01/2022 1 41.69
445 HOOGHLY SM/07439 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF KISHORPUR WATER SUPPLY SCHEME. Retrofitting 04/12/2020 2,472 157.36 157.36 10/03/2022 1 184.59
446 HOOGHLY SM/06994 Retrofitting work for providing Functional Household Tap Connection (FHTC) within the command area of Sabalsinghapur (Within BepariPara, DharaPara, Doctor Para, Gowas Para, Hazra Para, Jamadar Para, Jana Para, Manna Para, Mehadi Para, Moral Para Habitatio Retrofitting 25/09/2020 2,096 68.52 68.52 12/04/2021 0 88.70
447 HOOGHLY SM/07151 Retrofitting work for providing Functional Household Tap Connection (FHTC) within the command area of Sabalsinghapur(Within Munshi Para, Patra Para,Pramanik Para, Roy Para- Danga, Sabalsinghapur, Dolui Para, Sanki Para, Santra Para, Santra Para-North,Seik Retrofitting 25/09/2020 2,096 69.81 69.81 12/11/2021 4 88.04
448 HOOGHLY SM/07948 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF BANDIPUR WATER SUPPLY SCHEME. Retrofitting 08/01/2021 4,046 98.47 98.47 11/02/2021 2 126.02
449 HOOGHLY SM/07951 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF PAUNAN WATER SUPPLY SCHEME. Retrofitting 08/01/2021 4,320 99.86 99.86 17/12/2020 3 169.53
450 HOOGHLY SM/07534 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF ANANDAPUR WATER SUPPLY SCHEME. Retrofitting 04/12/2020 1,112 72.23 72.23 01/12/2021 5 97.02
451 HOOGHLY SM/09517 Augmentation of RAJHAT ZONE 2 Piped Water Supply Scheme by installing ( 01 ) no. Tube well including Connection with Distribution, Switch Room and other allied work to meet up the water demand, hampered due to execution of FHTC. Augmentation 08/10/2021 0 43.94 43.94 26/08/2022 10 40.25
452 HOOGHLY SM/08995 Chandanpur Piped Water Supply Scheme. New 19/08/2021 1,105 486.65 486.65 20/12/2022 19 530.46
453 HOOGHLY SM/09067 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF KAPSIT WATER SUPPLY SCHEME Retrofitting 19/08/2021 2,144 131.23 131.23 03/06/2022 5 106.81
454 HOOGHLY SM/09070 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF SAPTAGRAM WATER SUPPLY SCHEME. Retrofitting 19/08/2021 3,870 136.85 136.85 23/08/2022 8 139.10
455 HOOGHLY SM/10340 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPLY SCHEME FOR SAIDPUR. Augmentation 19/08/2021 9,147 1,822.88 1,822.88 19/04/2023 30 1,735.96
456 HOOGHLY SM/09690 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ANIYA. Augmentation 19/08/2021 1,615 350.38 350.38 20/04/2022 9 303.33
457 HOOGHLY SM/10357 Ground Based Piped Water Supply Scheme Tantisal PWSS under Khanakul I Block of Arambagh Sub Division under Hooghly Division PHE Dte New 19/08/2021 2,878 777.80 777.80 01/04/2022 9 569.71
458 HOOGHLY SM/09698 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ANUR. Augmentation 19/08/2021 2,088 620.51 620.51 02/06/2022 15 428.15
459 HOOGHLY SM/12369 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BARAKAMALPUR Augmentation 17/02/2022 12,977 3,756.01 3,756.01 12/05/2023 29 2,909.42
460 HOOGHLY SM/11969 AUGMENTATION OF RAGHUNATHPUR PIPED WATER SUPPLY SCHEME Augmentation 27/01/2022 4,827 1,096.03 1,096.03 14/06/2024 27 812.00
461 HOOGHLY SM/12567 NANDA PIPED WATER SUPPLY SCHEME New 25/04/2022 2,460 1,120.63 1,120.63 08/04/2024 12 901.52
462 HOOGHLY SM/12232 GROUND WATER BASED KELEPARA PIPED WATER SUPPLY SCHEME IN PURSURA BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 22/08/2022 1,752 762.35 762.35 03/10/2024 7 604.65
463 HOOGHLY SM/11621 GROUND WATER BASED MINI PIPED WATER SUPPLY SCHEME FOR THE BLOCKS OF POLBA-DADPUR, DHANIAKHALI, CHANDITALA-I & JANGIPARA IN HOOGHLY DISTRICT New 25/04/2022 1,850 996.92 996.92 30/12/2022 3 1,646.84
464 HOOGHLY SM/12242 BISHNUPUR PIPED WATER SUPPLY SCHEME BLOCK: JANGIPARA, DISTRICT: HOOGHLY New 22/08/2022 472 286.66 286.66 15/03/2023 8 278.72
465 HOOGHLY SM/12249 JAGANNATHPUR PIPED WATER SUPPLY SCHEME BLOCK: JANGIPARA, DISTRICT: HOOGHLY. New 22/08/2022 2,152 659.51 659.51 31/07/2024 10 665.97
466 HOOGHLY SM/12228 Augmentation of Goradaha Piped Water Supply Scheme, Block- Goradaha, District-Hooghly Augmentation 22/08/2022 3,126 741.99 741.99 26/06/2024 10 528.12
467 HOOGHLY SM/11580 SIRAZPUR PIPED WATER SUPPLY SCHEME New 25/04/2022 2,119 811.72 811.72 11/08/2023 11 689.62
468 HOOGHLY SM/12013 RETROFITTING WORKS FOR PROVIDING FHTC WITHIN THE COMMAND AREA OF SRIPUR-BALAGARH WATER SUPPLY SCHEME Retrofitting 05/07/2022 3,502 199.03 199.03 0 0.00
469 HOOGHLY SM/13673 Bhabapur mini pipe water supply scheme New 09/09/2022 78 39.84 39.84 15/05/2023 1 0.48
470 HOOGHLY SM/11924 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR CHERAGRAM W/S SCHEME Augmentation 20/05/2022 2,217 748.82 748.82 21/02/2022 9 644.71
471 HOOGHLY SM/11866 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR SIBAICHANDI Augmentation 20/05/2022 2,063 689.80 689.80 10/07/2024 20 598.64
472 HOOGHLY SM/11868 AUGMENTATION OF GROUND BASED PIPED WATER SUPPLY SCHEME FOR SRIKRISHNAPUR Augmentation 20/05/2022 2,962 837.42 837.42 17/04/2023 14 630.84
473 HOOGHLY SM/13663 Uttar Hazipur Mini Piped Water Supply Scheme New 09/09/2022 68 39.26 39.26 27/12/2022 2 67.43
474 HOOGHLY SM/13665 Dwaripara Mini Piped Water Supply Scheme New 09/09/2022 98 42.75 42.75 27/12/2022 2 97.62
475 HOOGHLY SM/12882 RETROFITTING WORKS OF GUPTIPARA PWSS FOR PROVIDING 6938NOS. FUNCTIONAL HOUSE HOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF THE SCHEME UNDER HOOGHLY DIVISION, PHE DTE Retrofitting 22/08/2022 6,938 409.90 409.90 27/07/2023 3 84.75
476 HOOGHLY SM/13356 RETROFITTING WORKS OF DHARAMPUR PWSS FOR PROVIDING 1600 NOS. FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN COMMAND AREA OF THE SCHEME UNDER HOOGHLY DIVISION PHE DTE. Retrofitting 22/08/2022 1,600 103.91 103.91 19/04/2023 9 214.49
477 HOOGHLY SM/13325 GROUND WATER BASED CHINRA (ZONE-I) PIPED WATER SUPPLY SCHEME IN KHANAKUL-II BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT New 09/09/2022 1,356 647.04 647.04 13/11/2024 10 87.14
478 HOOGHLY SM/13336 BADE DIGARIA PIPED WATER SUPPLY SCHEME New 09/09/2022 1,666 657.34 657.34 12/04/2023 12 522.54
479 HOOGHLY SM/15796 Source Augmentation of Malia PWSS Augmentation 16/11/2022 1,301 55.16 55.16 26/04/2023 11 53.70
480 HOOGHLY SM/15810 Source Augmentation of SHYAMBALLAVPUR Piped Water Supply Scheme Under Goghat-I Block Augmentation 16/11/2022 50 64.36 64.36 10/05/2023 5 53.54
481 HOOGHLY SM/16979 Mahishtikri (Zone-I) Piped Water Supply Scheme, Block- Haripal, District-Hooghly New 28/12/2022 827 371.55 371.55 28/04/2023 5 91.13
482 HOOGHLY SM/16138 Mahishtikri (Zone-II) Piped Water Supply Scheme, Block- Haripal, District-Hooghly New 28/12/2022 611 271.36 271.36 14/06/2024 7 46.85
483 HOOGHLY SM/16756 Gopalbati Piped Water Supply Scheme. New 19/08/2021 1,059 421.19 421.19 22/05/2023 8 424.56
484 HOOGHLY SM/18934 SOURCE AUGMENTATION OF ITAGARH PIPED W/S SCHEME UNDER BALAGARH BLOCK Augmentation 10/03/2023 0 188.47 188.47 20/02/2025 5 42.50
485 HOOGHLY SM/08741 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF GOSWAMI MALIPARA WATER SUPPLY SCHEME. Retrofitting 10/02/2021 3,700 214.13 214.13 10/05/2021 18 266.95
486 HOOGHLY SM/07539 RETROFITTING WORKS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF KAMARPARA WATER SUPPLY SCHEME. Retrofitting 04/12/2020 540 35.08 35.08 10/05/2021 5 66.70
487 HOOGHLY SM/06987 Retrofitting work for providing Functional Household Tap Connection (FHTC) within the Akuti, Radhaballabhpur, Baidyagari, Paschim Durgapur,Budul Badul Hati,Bhandarhati,Ilampur, Gabtala,Dakshin Dilakash Mouza of Borhol Zone-II Water Supply Scheme Retrofitting 25/09/2020 1,435 92.65 92.65 03/02/2021 3 133.20
488 HOOGHLY SM/11465 Augmentation of Ground Water Based Piped Water Supply Scheme for Purba Tajpur under Serampore Sub-Division of Hooghly Division , P.H.E. Dte. Augmentation 30/03/2022 1,770 307.35 307.35 06/11/2023 13 255.17
489 HOOGHLY SM/09693 AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR RAJHATO. Augmentation 19/08/2021 3,192 615.63 615.63 18/05/2023 22 650.81
490 HOOGHLY SM/10005 Augmentation of Champadanga Water Supply Scheme Augmentation 22/11/2021 6,374 1,532.55 1,532.55 20/12/2022 33 1,520.55
491 HOOGHLY SM/19013 'GROUND WATER BASED GHAR GOHAL PIPED WATER SUPPLY SCHEME IN ARAMBAGH BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT ' New 28/12/2022 534 312.74 312.74 30/10/2023 6 231.15
492 HOOGHLY SM/18973 SOURCE AUGMENTATION OF BHABANIPUR CHAR PIPED W/S SCHEME UNDER BALAGARH BLOCK Augmentation 10/03/2023 0 188.47 188.47 14/06/2024 6 122.57
493 HOOGHLY SM/13564 Muragari Mini Piped Water Supply Scheme New 09/09/2022 55 38.17 38.17 19/08/2023 1 28.23
494 HOOGHLY SM/18952 Source Augmentation Of PUINAN piped Water Supply Scheme Under Polba Dadpur Block Augmentation 10/03/2023 0 153.27 153.27 14/06/2024 5 41.02
495 HOOGHLY SM/18667 KOTALPUR PIPED WATER SUPPLY SCHEME BLOCK : JANGIPARA DISTRICT : HOOGHLY. New 30/09/2022 5,093 1,548.70 1,548.70 04/08/2023 10 1,629.17
496 HOOGHLY SM/18962 Source Augmentation of SAOTA Piped Water Supply Scheme Under Pursura Block Augmentation 10/03/2023 0 192.68 192.68 23/11/2023 1 21.48
497 HOOGHLY SM/18657 GROUND WATER BASED BALARAMBATI PIPED W/S SCHEME New 28/12/2022 3,347 1,453.60 1,453.60 06/06/2024 8 895.16
498 HOOGHLY SM/18965 Source Augmentation of GOURHATI piped Water Supply Scheme Under Arambag Block Augmentation 10/03/2023 0 174.68 174.68 23/11/2023 1 21.49
499 HOOGHLY SM/18946 SOURCE AUGMENTATION OF PANDUA PIPED W/S SCHEME UNDER PANDUA BLOCK Augmentation 10/03/2023 0 188.47 188.47 04/04/2025 11 51.97
500 HOOGHLY SM/11989 Operational charges of PHED & NGO managed Laboratories related to WQMSP under Jal Jeevan Mission for 12 months under Hooghly Division, PHE Dte. Support 05/07/2022 0 55.00 55.00 13/04/2023 62 64.34
501 HOOGHLY SM/19085 Operational charges for 09 (Nine) nos. NABL Accridited/Recognised PHED & NGO Managed Laboratories under Hooghly Division, PHE Dte Support 17/08/2023 0 84.55 84.55 22/05/2024 15 24.39
502 HOOGHLY Procurement of Chemical, Glassware and Instruments required for NABL accrediation of Hooghly District Laboratory. Support 10/02/2021 0 14.87 0.00 0 0.00
503 HOOGHLY SM/08967 Drinking water sample collection & testing through Filed Test Kits (FTKs) & uploading charges for the same related to Water Quality Monitoring & Surveillance Programme. Support 19/08/2021 0 29.51 29.51 30/12/2022 3 2.58
504 HOOGHLY SM/18131 Information Education Communication (IEC) Activities related to judicious & safe use of drinking water, water conservation, water quality issues Under Jal Jeevan Mission (JJM) Support Activities Support 10/03/2023 0 131.68 131.68 11/10/2023 1 59.07
505 HOOGHLY Capacity Building & Awareness Generation (IEC) Activities related to judicious & safe use of drinking water, water conservation, water quality issues Under Jal Jeevan Mission (JJM) Support Activities in Hooghly District under Hooghly Division Support 22/10/2024 0 132.86 0.00 0 0.00
506 HOOGHLY Survey & collection of data through mobile app regarding availability & other parameters in Primary & Upper Primary Schools, Anganwadi Centers. Support 10/02/2021 0 10.32 0.00 0 0.00
507 HOOGHLY SM/06617 Procurement of Chemicals, Glassware for routine testing chemical requirement for OMAS Testing, maintenance contract of computer and others .........and collection of special drive samples for 1 Yr. Support 05/11/2019 0 44.02 44.02 18/04/2023 10 35.46
508 HOOGHLY SM/08974 Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Hooghly District. Support 19/08/2021 0 406.09 406.09 0 0.00
509 HOOGHLY SM/18130 Supply, Delivery and Installation of Desktop Computer, UPS, Scanner, printer etc. through GeM portal for Office of the Executive Engineer , Hooghly Division, PHE Dte Support 10/03/2023 0 21.00 21.00 05/05/2023 11 19.85
510 HOOGHLY SM/11996 REQUIREMENT OF CHEMICAL AND OTHER CONSUMABLE FOR 9 WATER TESTING LABORATORIES FOR 1(ONE) YEAR AND SUPPLY OF STANDARD REFERENCE MATERIALS AND ASSOCIATED SAFETY EQUIPMENTS FOR ARRAINGING ADEQUACY AGAINST NABL-GLAP ASSESSMENT FROM NABL AUTHORITY OF SUB DISTR Support 05/07/2022 0 38.59 38.59 24/04/2023 13 18.15
Total 9,80,490 2,43,374.05 2,44,969.73 # 3,758 2,01,712.00