Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 86.68 2.54 2.93  
1 HOOGHLY Singur Hooghly Division SINHAL PATAN PIPED WATER SUPPLY SCHEME , SM/18103 New Material Requisition To Resource Division RTOR000301/2023-2024 1383/45/Hug 15/05/2023 0 Resource Division 1.42 0.00 0 0
2 HOOGHLY Singur Hooghly Division SINHAL PATAN PIPED WATER SUPPLY SCHEME , SM/18103 New Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Sinhal Pathan Piped Water Supply Scheme under Singur Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-B). Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000011/2024-2025 429/chan 09/04/2024 15 ENVIROTECH SOLUTIONS 0.84 0.84 100 100
3 HOOGHLY Singur Hooghly Division SINHAL PATAN PIPED WATER SUPPLY SCHEME , SM/18103 New Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Sinhal Pathan Piped Water Supply Scheme under Singur Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-C). Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000012/2024-2025 430/chan 09/04/2024 15 ENVIROTECH SOLUTIONS 0.78 0.78 100 100
4 HOOGHLY Singur Hooghly Division SINHAL PATAN PIPED WATER SUPPLY SCHEME , SM/18103 New Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Sinhal Pathan Piped Water Supply Scheme under Singur Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-A). Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000010/2024-2025 428/Chan 09/04/2024 15 ENVIROTECH SOLUTIONS 0.92 0.92 100 100
5 HOOGHLY Singur Electrical SINHAL PATAN PIPED WATER SUPPLY SCHEME , SM/18103 New Quotation for new service connection at Sinhal Patan water supply Scheme [SM/18103], T/W No. - I, Block - Singur, under Singur CCC, WBSEDCL, Ref. No. - 503588851, Dt. - 07-03-2024, Application No. - 5004057413 BILL/06279/2023-2024 877 13/03/2024 0 WBSEDCL 3.30 0.00 0 0
6 HOOGHLY Singur Hooghly Division SINHAL PATAN PIPED WATER SUPPLY SCHEME , SM/18103 New SINHAL Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC & construction of switch-room & boundary wall at Proposed TW site, under Chandannagar Sub-Division of Hooghly Division P.H.E Dte. Block Singur, District:- Hooghly [NEW SCHEME] Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000152/2023-2024 1566/HUG 29/05/2023 730 BIMAL KUMAR HALDER 79.42 0.00 0 90
Total 86.67 2.53 2.92