Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
15 3,606.02 136.09 3.77  
1 HOOGHLY Khanakul-I Electrical Udna Piped Water Supply Scheme, Block-Khanakul I, District- Hooghly , SM/18309 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for UDNA water supply scheme, T.W. No.- I & II, Block: Khanakul-I, District- Hooghly under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer3,Junior Engineer4 ORD/000814/2023-2024 3159/ED 27/07/2023 90 MAA KALI ENTERPRISE 20.23 14.81 73.21 100
2 HOOGHLY Khanakul-I Hooghly Division Udna Piped Water Supply Scheme, Block-Khanakul I, District- Hooghly , SM/18309 New MAHISGOT (ZONE-I), MAHISGOT (ZONE-II), POL, RADHABALLAVPUR (ZONE-I), UDAYPUR, UDNA Piped Water Supply Scheme with T.W, SWITCH ROOM, BOUNDARY WALL, RISING MAIN, LDS, FHTC & Construction of OHR with 20 mtr. staging height including Soil Investigation work at KHANAKUL-I Block under ARAMBAGH Sub-Division of Hooghly Division PHE Dte Assistant Engineer Junior Engineer (Civill) ORD/000549/2023-2024 3139/HUG 16/10/2023 898 MACKINTOSH BURN LIMITED 3,480.01 79.14 2.27 45
3 HOOGHLY Khanakul-I Hooghly Division Udna Piped Water Supply Scheme, Block-Khanakul I, District- Hooghly , SM/18309 New Material Requisition To Resource Division RTOR000479/2023-2024 3057/8/Hug 11/10/2023 0 Resource Division 11.45 0.00 0 0
4 HOOGHLY Khanakul-I Electrical Udna Piped Water Supply Scheme, Block-Khanakul I, District- Hooghly , SM/18309 New Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for Udna water supply scheme, T.W. No. III & IV, Block: Khanakul-I, District: Hooghly under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer3,Junior Engineer4 ORD/002471/2023-2024 332/ED 21/02/2024 90 MAA KALI ENTERPRISE 21.44 15.90 74.16 20
5 HOOGHLY Khanakul-I Hooghly Division Udna Piped Water Supply Scheme, Block-Khanakul I, District- Hooghly , SM/18309 New Sinking of 3 nos. tube-well (300 X 200 mm) by D.R. Rig method at HIRAPUR Z-II and UDNA Piped Water Supply Scheme under ARAMBAGH Sub-Division of Hooghly Division P.H.E. Dte. Assistant Engineer Junior Engineer (Civill) ORD/000842/2023-2024 722/HUG 05/03/2024 60 ANIRUDDHA FARUQUE 48.17 26.24 54.47 100
6 HOOGHLY Khanakul-I Hooghly Division Udna Piped Water Supply Scheme, Block-Khanakul I, District- Hooghly , SM/18309 New Designing making and erection of Display Board using logo and tag line of Jal Jeevan Mission to the placed at different work sites and HGJ villages for awareness generation among the people in the district of Hooghly under ARAMBAGH Sub-Division under Hooghly Division PHE Dte. (i) PATUL PWSS (ii) GHOSHPUR PWSS (iii) UDNA PWSS (iv) POLE PWSS (v) GOBINDAPUR PWSS (vi) THAKURANICHAK PWSS Assistant Engineer Junior Engineer (Civill) ORD/000436/2024-2025 800/Arg 23/08/2024 7 LIMRA SOCIAL WELFARE SOCIETY 0.95 0.00 0 100
7 HOOGHLY Khanakul-I Electrical Udna Piped Water Supply Scheme, Block-Khanakul I, District- Hooghly , SM/18309 New Quotation of New Service Connection for UDNA w/s Scheme, PH No-I Block-Khanakul-I Dist-Hooghly under Electrical Division,PHE Dte.(SM/18309) Application No-5004114171 Reference Id-503617472 BILL/00233/2024-2025 83 22/04/2024 0 WBSEDCL 3.38 0.00 0 0
8 HOOGHLY Khanakul-I Hooghly Division Udna Piped Water Supply Scheme, Block-Khanakul I, District- Hooghly , SM/18309 New Field level data validation of FHTC executed by various agencies on the basis of pictorial data with the objective of controlling multiple entry, improving data quality in terms of absolute house hold by verification through electric connection or any other unique documents and making error free database in different pipe water supply scheme under Khanakul I & II Block in the District of Hooghly under Arambagh Sub Division under Hooghly Division, PHE Dte. Assistant Engineer Junior Engineer (Civill) ORD/001929/2024-2025 463/HUG 20/02/2025 315 TECHVISION 14.80 0.00 0 20
9 HOOGHLY Khanakul-I Hooghly Division Udna Piped Water Supply Scheme, Block-Khanakul I, District- Hooghly , SM/18309 New Preparation of CAD-GIS Drawing and Pipe Network Design for Augmentation of Jagannathpur Eastern Flank Piped Water Supply Scheme under Arambagh Sub - Division of Hooghly Division, P.H.E. Dte. Assistant Engineer ORD/001303/2025-2026 665/Arg 31/07/2025 31 APEX TECHNOLOGIES 0.84 0.00 0 0
10 HOOGHLY Khanakul-I Hooghly Division Udna Piped Water Supply Scheme, Block-Khanakul I, District- Hooghly , SM/18309 New Preparation of DPR for Augmentation of Jagannathpur Eastern Flank Piped Water Supply Scheme under Arambagh Sub - Division of Hooghly Division, P.H.E. Dte. Assistant Engineer ORD/001319/2025-2026 666/Arg 31/07/2025 31 APEX TECHNOLOGIES 0.78 0.00 0 0
11 HOOGHLY Khanakul-I Hooghly Division Udna Piped Water Supply Scheme, Block-Khanakul I, District- Hooghly , SM/18309 New Route Survey for Augmentation of Jagannathpur Eastern Flank Piped Water Supply Scheme under Arambagh Sub - Division of Hooghly Division, P.H.E. Dte. (Part- B) Assistant Engineer ORD/001321/2025-2026 668/Arg 31/07/2025 31 APEX TECHNOLOGIES 0.80 0.00 0 0
12 HOOGHLY Khanakul-I Hooghly Division Udna Piped Water Supply Scheme, Block-Khanakul I, District- Hooghly , SM/18309 New Preparation of CAD-GIS Drawing and Pipe Network Design for Augmentation of Jagannathpur Western Flank Piped Water Supply Scheme under Arambagh Sub - Division of Hooghly Division, P.H.E. Dte. Assistant Engineer ORD/001322/2025-2026 669/Arg 31/07/2025 31 APEX TECHNOLOGIES 0.84 0.00 0 0
13 HOOGHLY Khanakul-I Hooghly Division Udna Piped Water Supply Scheme, Block-Khanakul I, District- Hooghly , SM/18309 New Route Survey for Augmentation of Jagannathpur Eastern Flank Piped Water Supply Scheme under Arambagh Sub - Division of Hooghly Division, P.H.E. Dte. (Part-A) Assistant Engineer ORD/001320/2025-2026 667/Arg 31/07/2025 31 APEX TECHNOLOGIES 0.73 0.00 0 0
14 HOOGHLY Khanakul-I Hooghly Division Udna Piped Water Supply Scheme, Block-Khanakul I, District- Hooghly , SM/18309 New Preparation of DPR for Augmentation of Jagannathpur Western Flank Piped Water Supply Scheme under Arambagh Sub - Division of Hooghly Division, P.H.E. Dte. Assistant Engineer ORD/001323/2025-2026 670/Arg 31/07/2025 31 APEX TECHNOLOGIES 0.78 0.00 0 0
15 HOOGHLY Khanakul-I Hooghly Division Udna Piped Water Supply Scheme, Block-Khanakul I, District- Hooghly , SM/18309 New Route Survey for Augmentation of Jagannathpur Western Flank Piped Water Supply Scheme under Arambagh Sub - Division of Hooghly Division, P.H.E. Dte. Assistant Engineer ORD/001324/2025-2026 671/Arg 31/07/2025 31 APEX TECHNOLOGIES 0.82 0.00 0 0
Total 3,606.02 136.09 3.77