Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 967.07 224.03 23.17  
1 HOOGHLY Haripal Hooghly Division PANRRA PIPED WATER SUPPLY SCHEME , SM/11292 New Route Survey, Design Drawing & DPR Preparation of Panrra PWSS under Chandannagar Sub - Division, PHE Dte. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000412/2022-2023 514/Chan 29/09/2022 15 ENVIROTECH SOLUTIONS 6.22 6.22 100 0
2 HOOGHLY Haripal Hooghly Division PANRRA PIPED WATER SUPPLY SCHEME , SM/11292 New Material Requisition To Resource Division RTOR000201/2022-2023 109/ 16/Hug 10/01/2023 Resource Division 80.63 0.00 0 0
3 HOOGHLY Haripal Hooghly Division PANRRA PIPED WATER SUPPLY SCHEME , SM/11292 New Material Requisition To Resource Division RTOR000208/2023-2024 1383/11/Hug 15/05/2023 Resource Division 18.47 0.00 0 0
4 HOOGHLY Haripal Electrical PANRRA PIPED WATER SUPPLY SCHEME , SM/11292 New Quotation of New Service Connection Charge for Pannra w/S Scheme,TW No-II, Block-Haripal Dist-Hooghly under ED,PHE Dte BILL/03766/2023-2024 258 05/09/2023 WBSEDCL 3.16 0.00 0 0
5 HOOGHLY Haripal Electrical PANRRA PIPED WATER SUPPLY SCHEME , SM/11292 New Adhoc Payment to WBSEDCL against service connection BILL/01117/2023-2024 null 27/06/2023 WBSEDCL 94.34 0.00 0 0
6 HOOGHLY Haripal Hooghly Division PANRRA PIPED WATER SUPPLY SCHEME , SM/11292 New Material Requisition To Resource Division RTOR000408/2023-2024 3058/35/Hug 11/10/2023 Resource Division 18.14 0.00 0 0
7 HOOGHLY Haripal Hooghly Division PANRRA PIPED WATER SUPPLY SCHEME , SM/11292 New Horizontal Auger boring with water jet system Including Approach road at Panrra W/S Scheme under Chandannagar Sub - Division of Hooghly Division, P.H.E. Dte. ORD/000759/2023-2024 451/HUG 15/02/2024 30 CONCORD ENGINEERING (ASOKE KUMAR DHAR) 20.55 0.00 0 0
8 HOOGHLY Haripal Electrical PANRRA PIPED WATER SUPPLY SCHEME , SM/11292 New Quotation for New Service Connection at Pantra W/S. Sch. TW-I BILL/04613/2023-2024 612 14/03/2024 WBSEDCL 4.96 0.00 0 0
9 HOOGHLY Haripal Electrical PANRRA PIPED WATER SUPPLY SCHEME , SM/11292 New Quotation for New Service Connection at Pantra W/S. Sch. TW-I BILL/04613/2023-2024 612 14/03/2024 WBSEDCL 4.96 0.00 0 0
10 HOOGHLY Haripal Hooghly Division PANRRA PIPED WATER SUPPLY SCHEME , SM/11292 New Sinking of 5 nos. 300 X200 mm dia Tube Well 210 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) at Harat& Panrra W/S Scheme under Chandannagar Sub-Division of Hooghly Division, P.H.E. Dte. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000200/2023-2024 1804/HUG 21/06/2023 45 OSMAN SEKH 80.84 16.06 19.87 100
11 HOOGHLY Haripal Electrical PANRRA PIPED WATER SUPPLY SCHEME , SM/11292 New Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for Panrra water supply scheme, T.W. No. I & II, Block: Haripal, District - Hooghly under Electrical Division, PHE Dte. Assistant Engineer 2 ,Assistant Engineer Howrah mechanical Sub Division Junior Engineer4 ORD/000090/2022-2023 3472/ED 30/12/2022 90 SANKAR PRASAD DUTTA & CO. 23.00 10.44 45.39 30
12 HOOGHLY Haripal Hooghly Division PANRRA PIPED WATER SUPPLY SCHEME , SM/11292 New Construction of 400 cum capacity OHR with 20 mtr. staging height including Soil Investigation work, Laying Distribution System, Rising Main & Interconnection between O.H.R, TW No-I & II, Construction of 1No 5.4 M X 3.6 M Switch Room with Sanitary and Water Supply Arrangements & Boundary Wall at Head Work Site, Construction of 1No 3.6M x 3.0M Switch Room without Sanitary & Water Supply arrangement & Boundary Wall at 2nd T/W Site including Providing FHTC in PANRRA Water Supply Scheme at HARIPAL Block under Chandannagar Sub-Division. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000001/2023-2024 988/Hug 04/04/2023 300 CONCORD ENGINEERING (ASOKE KUMAR DHAR) 611.80 191.31 31.27 70
Total 967.08 224.03 23.17