Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
25 1,107.6 400.63 36.17  
1 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Additional survey work for preparation of DPR for Augmentation of Bhadur Piped Water Supply Scheme Under Arambagh Sub-Division of Hooghly Division P.H.E Dte. [Block-Goghat-I]. (Bhadur Part-B) Assistant Engineer Junior Engineer (Civill) ORD/000240/2022-2023 335/Arg 02/05/2022 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 0.46 0.46 100 0
2 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Preparation of DPR for Augmentation of Bhadur Piped Water Supply Scheme Under Arambagh Sub-Division of Hooghly Division P.H.E Dte. [Block-Goghat-I].(Bhadur Part-A) Assistant Engineer Junior Engineer (Civill) ORD/000239/2022-2023 334/Arg 02/05/2022 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 4.68 3.60 76.92 0
3 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Laying CI/D.I pipes & specials for Rising Main pipe line in between T.W NO.-I & II to OHR and interconnection with distribution system including allied work for Augmentation of BHADUR (ZONE-II) Water Supply Scheme at Goghat-I Block under Armabag Sub- Division of Hooghly Division, PHE Dte. Assistant Engineer ORD/000386/2023-2024 2568/HUG 24/08/2023 45 PAUL CONSTRUCTION (RANJIT KUMAR PAUL) 4.91 0.00 0 0
4 HOOGHLY Central Drilling AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Providing Drilling crew and other allied works for construction of Tube well (300mm x 200mm x 235 mtrs. Depth) by utilising Departmental machineries for Bhadur W/S Scheme (Z-II, TW-I & II), Goghat-I block under hooghly District, CDD PHE Dte. ORD/000466/2022-2023 2298/CDD 30/03/2023 30 CHANDA ENTERPRISE 30.35 18.99 62.57 31
5 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Material Requisition To Resource Division RTOR000118/2022-2023 2211/3/Hug 30/09/2022 0 Resource Division 30.80 0.00 0 0
6 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Material Requisition To Resource Division RTOR000057/2022-2023 1688/4/HUG 22/08/2022 0 Resource Division 120.14 0.00 0 0
7 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Material Requisition To Resource Division RTOR000079/2022-2023 1773/13/Hug 29/08/2022 0 Resource Division 1.03 0.00 0 0
8 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Material Requisition To Resource Division RTOR000051/2022-2023 1590/3/Hug 03/08/2022 0 Resource Division 15.40 0.00 0 0
9 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Material Requisition To Resource Division RTOR000018/2023-2024 1106/5/HUG 17/04/2023 0 Resource Division 23.22 0.00 0 0
10 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Material Requisition To Resource Division RTOR000145/2023-2024 1385/15/Hug 15/05/2023 0 Resource Division 14.32 0.00 0 0
11 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Material Requisition To Resource Division RTOR000330/2023-2024 2607/3/Hug 29/08/2023 0 Resource Division 18.58 0.00 0 0
12 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Material Requisition To Resource Division RTOR000372/2023-2024 3002/3/Hug 05/10/2023 0 Resource Division 20.89 0.00 0 0
13 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Material Requisition To Resource Division RTOR000278/2022-2023 1105/5/Hug 17/04/2023 0 Resource Division 86.37 0.00 0 0
14 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Material Requisition To Resource Division RTOR000024/2023-2024 1234/5/Hug 28/04/2023 0 Resource Division 3.72 0.00 0 0
15 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation HIRE CHARGES BILL FOR THE ASSISTANT ENGINEER, ARAMBAGH SUB-DIVISION, PHE DTE. BILL/00228/2022-2023 BP-2022-23-547 21/02/2023 0 M/S PRADYUT KUMAR HAZRA 1.15 0.00 0 0
16 HOOGHLY Electrical AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Quotation of New Service Connection for Bhadur w/s Scheme,Zone-I,TW No-III Dist-Hooghly Under ED,PHE Dte BILL/02130/2023-2024 116 20/07/2023 0 WBSEDCL 6.86 0.00 0 0
17 HOOGHLY Electrical AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Quotation of New Service Connection for Bhadur w/s scheme,zone-II,TW No-II Dist-Hooghly under ED,PHE Dte BILL/02129/2023-2024 119 20/07/2023 0 WBSEDCL 2.80 0.00 0 0
18 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Providing Functional Household Tap Connection in BHADUR (Zone-II) Piped Water Supply Scheme including Construction of 2 Nos. 3.6M X 3.0M Switch Room & 2 Nos. Boundary wall at Goghat-I Block under Arambagh Sub-Division of Hooghly Division PHE Dte. SL NO - 4 Assistant Engineer Junior Engineer (Civill) ORD/000233/2022-2023 1782/HUG 30/08/2022 45 THREE MAA ENTERPRISE 78.11 53.97 69.09 75
19 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Augmentation of BHADUR (ZONE-I) Water Supply Scheme with LDS, FHTC, Rising Main & Construction of 350 cum capacity OHR with 20 mtr. staging height including Soil Investigation work at GOGHAT-I Block under Arambagh Sub-Division under Hooghly Division PHE Dte. Assistant Engineer Junior Engineer (Civill) ORD/000619/2022-2023 43/HUG 04/01/2023 300 TITAS CONSTRUCTION 411.57 185.87 45.16 55
20 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Protection works and other allied works at Head Work Site of BHADUR Water Supply Scheme under Arambagh Sub-Division of Hooghly Division P.H.E Dte ORD/000476/2024-2025 4055/HUG 19/12/2024 90 AYUSH ENTERPRISE 23.83 0.00 0 0
21 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Laying Distribution System of BHADUR (Zone-II) Piped Water Supply Scheme within Bhadur, Mandalganti & Adra Mouza including Repairing of existing Switch rooms, Boundary walls of BHADUR (Zone-I & Zone-II) Water Supply Scheme at Goghat-I Block under Arambagh Sub-Division of Hooghly Division P.H.E Dte. Assistant Engineer Junior Engineer (Civill) ORD/000464/2022-2023 2525/HUG 23/11/2022 45 M/S S & P CONSTRUCTION 85.00 68.89 81.05 95
22 HOOGHLY Electrical AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Augmentation of Bhadur water supply scheme, T.W. No.- I & II, Block: Goghat-I, District- Hooghly under Electrical Division, PHE Dte. Assistant Engineer 2 Junior Engineer4 ORD/000200/2022-2023 827/ED 14/02/2023 90 C.M.S. ENGINEERING CONCERN 21.95 21.82 99.41 20
23 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Designing making and erection of Display Board using logo and tag line of LAND DEMARCATION OF P.H.E. Dte. to the placed at different work sites and HGJ villages for awareness generation among the people in the district of Hooghly under ARAMBAGH Sub Division under Hooghly Division PHE Dte. (1) ANANDAPUR PWSS-4nos (2) BHADUR(BHAGARBAND) PWSS-6nos (3) GOGHAT PWSS-2nos (4) JOYKRISHNAPUR PWSS-2nos Assistant Engineer Junior Engineer (Civill) ORD/000417/2024-2025 816/Arg 23/08/2024 130 DHIRENDRA ENGINEERING & CONSTRUCTION 0.98 0.42 42.86 100
24 HOOGHLY Electrical AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Additional Quotation of Bhadur w/s Scheme,Zone-I,PH No-3 Block-Goghat-I Dist-Hooghly under Electrical division,PHE Dte.(SM/11463) Reference Id-860301435 BILL/00622/2024-2025 183 03/06/2024 0 WBSEDCL 1.61 0.00 0 0
25 HOOGHLY Hooghly Division AUGMENTATION OF GROUND BASED PIPED WATER SPPLY SCHEME FOR BHADUR UNDER ARAMBAGH SUB DIV PHE DTE , SM/11463 Augmentation Construction of 200 cum capacity OHR with 20 mtr. staging height including Soil Investigation work & LDS within Sekati(Part) Mouza for Augmentation of Bhadur (Zone-II) Water Supply Scheme at Goghat-I Block under Armabag Sub-Division of Hooghly Division, PHE Dte. Assistant Engineer Junior Engineer (Civill) ORD/000160/2022-2023 1422/Hug 12/07/2022 1025 PAUL CONSTRUCTION (RANJIT KUMAR PAUL) 98.87 46.61 47.14 50
Total 1,107.61 400.63 36.17