Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 110.74 0 0  
1 HOOGHLY Hooghly Division Source Augmentation of PURBA RAYPUR Piped Water Supply Scheme under Arambag Block , SM/15806 Augmentation Material Requisition To Resource Division RTOR000096/2023-2024 1263/11/Hug 03/05/2023 Resource Division 5.69 0.00 0 0
2 HOOGHLY Electrical Source Augmentation of PURBA RAYPUR Piped Water Supply Scheme under Arambag Block , SM/15806 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Augmentation of Purba Raypur water supply scheme, T.W. No. I, Block: Arambag, District- Hooghly under Electrical Division, PHE Dte. ORD/000005/2023-2024 1621/ED 11/04/2023 90 ESENCE ENGINEERING CONCERN 10.75 0.00 0 0
3 HOOGHLY Hooghly Division Source Augmentation of PURBA RAYPUR Piped Water Supply Scheme under Arambag Block , SM/15806 Augmentation Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement , Boundary Wall in Proposed T.W Site,Laying rising main pipe for inter connection between T.W & Distribution For Source Augmentation of PURBA RAYPUR Piped Water Supply Scheme under Arambagh Sub-Division of Hooghly Division P.HE Dte. within ARAMBAGH Block. Assistant Engineer Junior Engineer (Civill) ORD/000144/2023-2024 1497/HUG 22/05/2023 30 DEBANANDA CONSTRUCTION 11.81 0.00 0 0
4 HOOGHLY Hooghly Division Source Augmentation of PURBA RAYPUR Piped Water Supply Scheme under Arambag Block , SM/15806 Augmentation Sinking of One No Big Dia Tube Well (300 mm X 200 mm) with supply of uPVC pipes & Strainer having depth upto150 Mtr at PURBARAYPUR PWSS of ARAMBAGH Sub-Division under Hooghly Division, PHE Dte Assistant Engineer ORD/000762/2022-2023 746/HUG 15/03/2023 30 GARHBETA - I UNEMPLOYED YOUTH ENGINEERS CO OPERATIVE 11.32 0.00 0 0
5 HOOGHLY Electrical Source Augmentation of PURBA RAYPUR Piped Water Supply Scheme under Arambag Block , SM/15806 Augmentation Adhoc payment to WBSEDCL against Service Connection BILL/01125/2023-2024 null 28/06/2023 WBSEDCL 71.17 0.00 0 0
Total 110.74 0.00 0