Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 1,053.48 477.24 45.3  
1 HOOGHLY Hooghly Division AUGMENTATION OF PURBA RAMNAGAR PIPED WATER SUPPLY SCHEME , SM/13348 Augmentation Material Requisition To Resource Division RTOR000137/2022-2023 2686/4/Hug 01/12/2022 Resource Division 0.32 0.00 0 0
2 HOOGHLY Hooghly Division AUGMENTATION OF PURBA RAMNAGAR PIPED WATER SUPPLY SCHEME , SM/13348 Augmentation Repairing of 3.6 mtr. x 3.0 mtr. size existing pump house of Purba Ramnagar PWSS scheme under Hooghly Division, P.H.E. Dte. Assistant Engineer (Civil) ORD/000575/2021-2022 660/CHAN 27/12/2021 30 SWASTIK ENTERPRISE 2.75 2.58 93.82 0
3 HOOGHLY Hooghly Division AUGMENTATION OF PURBA RAMNAGAR PIPED WATER SUPPLY SCHEME , SM/13348 Augmentation Repairing of 5.4 mtr x 3.6 mtr size existing pump house of Purba Ramnagar PWSS scheme under Hooghly Division, P.H.E. Dte. Assistant Engineer (Civil) ORD/000574/2021-2022 534/CHAN 12/11/2021 30 SWASTIK ENTERPRISE 2.96 2.94 99.32 0
4 HOOGHLY Hooghly Division AUGMENTATION OF PURBA RAMNAGAR PIPED WATER SUPPLY SCHEME , SM/13348 Augmentation Route survey Design drawing & DPR preparation of Purba Ramnagar PWSS under Chandannagar Sub-Division, P.H.E. Dte Assistant Engineer (Civil) ORD/000178/2022-2023 272/Chan 31/05/2022 20 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 4.24 4.03 95.05 0
5 HOOGHLY Hooghly Division AUGMENTATION OF PURBA RAMNAGAR PIPED WATER SUPPLY SCHEME , SM/13348 Augmentation HIRE CHARGES BILL FOR THE ASSISTANT ENGINEER, CHANDANNAGORE SUB-DIVISION, PHE DTE. BILL/00229/2022-2023 BP-2022-23-546 21/02/2023 GOUR KUMAR DAS 0.65 0.00 0 0
6 HOOGHLY Hooghly Division AUGMENTATION OF PURBA RAMNAGAR PIPED WATER SUPPLY SCHEME , SM/13348 Augmentation Material Requisition To Resource Division RTOR000077/2023-2024 1235/14/Hug 28/04/2023 Resource Division 71.65 0.00 0 0
7 HOOGHLY Hooghly Division AUGMENTATION OF PURBA RAMNAGAR PIPED WATER SUPPLY SCHEME , SM/13348 Augmentation Material Requisition To Resource Division RTOR000298/2023-2024 1383/42/Hug 15/05/2023 Resource Division 27.81 0.00 0 0
8 HOOGHLY Electrical AUGMENTATION OF PURBA RAMNAGAR PIPED WATER SUPPLY SCHEME , SM/13348 Augmentation Purba Ramnagar w/s scheme,P H NO 4 BILL/03773/2023-2024 274 08/09/2023 WBSEDCL 5.06 0.00 0 0
9 HOOGHLY Electrical AUGMENTATION OF PURBA RAMNAGAR PIPED WATER SUPPLY SCHEME , SM/13348 Augmentation Purba Ramnagar w/s scheme,P H No 3 BILL/03772/2023-2024 275 08/09/2023 WBSEDCL 4.62 0.00 0 0
10 HOOGHLY Hooghly Division AUGMENTATION OF PURBA RAMNAGAR PIPED WATER SUPPLY SCHEME , SM/13348 Augmentation Material Requisition To Resource Division RTOR000464/2023-2024 3058/26/Hug 11/10/2023 Resource Division 28.00 0.00 0 0
11 HOOGHLY Electrical AUGMENTATION OF PURBA RAMNAGAR PIPED WATER SUPPLY SCHEME , SM/13348 Augmentation Adhoc Payment to WBSEDCL against Service Connection BILL/01124/2023-2024 null 28/06/2023 WBSEDCL 89.37 0.00 0 0
12 HOOGHLY Electrical AUGMENTATION OF PURBA RAMNAGAR PIPED WATER SUPPLY SCHEME , SM/13348 Augmentation Purba Ramnagar w/s scheme,P H No . 3 BILL/03771/2023-2024 null 05/09/2023 WBSEDCL 4.62 0.00 0 0
13 HOOGHLY Electrical AUGMENTATION OF PURBA RAMNAGAR PIPED WATER SUPPLY SCHEME , SM/13348 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for Augmentation of Purba Ramnagar water supply scheme TW No I and II Block Tarakeswar, District Hooghly under ED PHED. Assistant Engineer 2 Junior Engineer2 ORD/000222/2022-2023 853/ED 14/02/2023 90 C.M. ENTERPRISE 21.49 10.44 48.58 85
14 HOOGHLY Hooghly Division AUGMENTATION OF PURBA RAMNAGAR PIPED WATER SUPPLY SCHEME , SM/13348 Augmentation AUGMENTATION of PURBA RAMNAGAR Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Repairing of Existing Switch Rooms, Boundary Wall of existing T.W Sites, Construction of 600 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under TARAKESWAR Block, District:- Hooghly [AUGMENTATION SCHEME] [2nd Call of WBPHE/EE/33/HUG/2022-23(Sl No. 4)] Assistant Engineer (Civil) Tarakeswar Block Junior Engineer ORD/000229/2023-2024 2062/HUG 17/07/2023 270 BANSBERIA CONSTRUCTION CO. 789.94 457.25 57.88 55
Total 1,053.49 477.23 45.3