Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 620.19 177.66 28.65  
1 HOOGHLY Haripal Hooghly Division BADE DIGARIA PIPED WATER SUPPLY SCHEME , SM/13336 New Material Requisition To Resource Division RTOR000197/2022-2023 109/ 12/Hug 10/01/2023 Resource Division 3.49 0.00 0 0
2 HOOGHLY Haripal Hooghly Division BADE DIGARIA PIPED WATER SUPPLY SCHEME , SM/13336 New Material Requisition To Resource Division RTOR000276/2022-2023 902/12/Hug 27/03/2023 Resource Division 10.26 0.00 0 0
3 HOOGHLY Haripal Hooghly Division BADE DIGARIA PIPED WATER SUPPLY SCHEME , SM/13336 New Material Requisition To Resource Division RTOR000217/2023-2024 1383/19/Hug 15/05/2023 Resource Division 10.26 0.00 0 0
4 HOOGHLY Haripal Electrical BADE DIGARIA PIPED WATER SUPPLY SCHEME , SM/13336 New Adhoc payment to WBSEDCL against service connnection. BILL/01121/2023-2024 null 28/06/2023 WBSEDCL 97.65 0.00 0 0
5 HOOGHLY Haripal Electrical BADE DIGARIA PIPED WATER SUPPLY SCHEME , SM/13336 New Quotation for New Service Connection of Bade Digaria W/S scheme,TW No-I, Block-Haripal, District- Hooghly under ED ,PHE Dte BILL/01982/2023-2024 98 17/07/2023 WBSEDCL 3.05 0.00 0 0
6 HOOGHLY Haripal Electrical BADE DIGARIA PIPED WATER SUPPLY SCHEME , SM/13336 New Quotation for new Service Connection of Bade Digaria w/s Scheme, TW No-II, Block- Haripal, District- Hooghly under ED ,PHE DTE BILL/01983/2023-2024 99 17/07/2023 WBSEDCL 2.30 0.00 0 0
7 HOOGHLY Haripal Electrical BADE DIGARIA PIPED WATER SUPPLY SCHEME , SM/13336 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Bade Digaria water supply scheme, T.W. No.- I & II, Block: Haripal, District- Hooghly under Electrical Division, PHE Dte. ORD/000170/2022-2023 559/ED 02/02/2023 90 M/S A.K BANERJEE 21.37 0.00 0 0
8 HOOGHLY Haripal Hooghly Division BADE DIGARIA PIPED WATER SUPPLY SCHEME , SM/13336 New Material Requisition To Resource Division RTOR000459/2023-2024 3058/27/Hug 11/10/2023 Resource Division 10.26 0.00 0 0
9 HOOGHLY Haripal Electrical BADE DIGARIA PIPED WATER SUPPLY SCHEME , SM/13336 New Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Bade Digaria water supply scheme, T.W. No.- I & II, Block: Haripal, District- Hooghly under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer4 ORD/000171/2022-2023 764/ED 09/02/2023 90 M/S A.K BANERJEE 21.37 10.66 49.88 40
10 HOOGHLY Haripal Hooghly Division BADE DIGARIA PIPED WATER SUPPLY SCHEME , SM/13336 New Designing making and erection of Display Board using logo and tag line of Jal Jeevan Mission to the placed at different work sites and HGJ villages for awareness generation among the people in the district of Hooghly under Chandannagar Sub Division under Hooghly Division PHE Dte.(Bade Digaria PWSS, Bhagabatipur PWSS, Sirazpur PWSS, Harat PWSS, panrra PWSS, Malia PWSS) Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000978/2023-2024 306/Chan 15/03/2024 7 AMBIAN INFRASTRUCTURE 0.95 0.48 50.53 100
11 HOOGHLY Haripal Hooghly Division BADE DIGARIA PIPED WATER SUPPLY SCHEME , SM/13336 New BADE DIGARIA Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. Staging height including soil investigation & construction of switch rooms & boundary walls at different TW site under HARIPAL Block, District- Hooghly.[NEW SCHEME] Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000019/2023-2024 1062/HUG 12/04/2023 270 MIXED ENGINEER'S CO - OPERATIVE SOCIETY LTD 423.74 153.25 36.17 25
12 HOOGHLY Haripal Hooghly Division BADE DIGARIA PIPED WATER SUPPLY SCHEME , SM/13336 New Route Survey, Design Drawing & DPR preparation of Bade Digharia PWSS under Chandannagar Sub-Division P.H.E. Dte. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000634/2023-2024 521/Chan 12/10/2023 15 APEX ENGINEERING 4.19 2.09 49.88 100
13 HOOGHLY Haripal Hooghly Division BADE DIGARIA PIPED WATER SUPPLY SCHEME , SM/13336 New Horizontal Auger boring with water jet system Including Culvert, Approach Road at BADE DIGHARIA Piped Water Supply Scheme under Chandannagar Sub-Division Of Hooghly Division P.H.E Dte. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000527/2023-2024 3006/HUG 05/10/2023 60 MIXED ENGINEER'S CO - OPERATIVE SOCIETY LTD 11.30 11.18 98.94 100
Total 620.19 177.66 28.65