Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 266.89 34.9 13.08  
1 HOOGHLY Polba - Dadpur Hooghly Division BHATUA PIPED W/S SCHEME (FOR UNCOVERED AREA) UNDER POLBA DADPUR BLOCK , SM/18098 New Material Requisition To Resource Division RTOR000256/2023-2024 1386/35/Hug 15/05/2023 Resource Division 4.56 0.00 0 0
2 HOOGHLY Polba - Dadpur Electrical BHATUA PIPED W/S SCHEME (FOR UNCOVERED AREA) UNDER POLBA DADPUR BLOCK , SM/18098 New Adhoc Payment to WBSEDCL against service connection BILL/01120/2023-2024 null 27/06/2023 WBSEDCL 104.27 0.00 0 0
3 HOOGHLY Polba - Dadpur Hooghly Division BHATUA PIPED W/S SCHEME (FOR UNCOVERED AREA) UNDER POLBA DADPUR BLOCK , SM/18098 New Material Requisition To Resource Division RTOR000363/2023-2024 3004/11/Hug 05/10/2023 Resource Division 2.71 0.00 0 0
4 HOOGHLY Polba - Dadpur Hooghly Division BHATUA PIPED W/S SCHEME (FOR UNCOVERED AREA) UNDER POLBA DADPUR BLOCK , SM/18098 New Material Requisition To Resource Division RTOR000518/2023-2024 3059/40/Hug 11/10/2023 Resource Division 4.56 0.00 0 0
5 HOOGHLY Polba - Dadpur Electrical BHATUA PIPED W/S SCHEME (FOR UNCOVERED AREA) UNDER POLBA DADPUR BLOCK , SM/18098 New Quotation for new service connection charge at Bhatua PWSS, TW - I BILL/04370/2023-2024 455 01/12/2023 WBSEDCL 15.60 0.00 0 0
6 HOOGHLY Polba - Dadpur Electrical BHATUA PIPED W/S SCHEME (FOR UNCOVERED AREA) UNDER POLBA DADPUR BLOCK , SM/18098 New Quotation for new service connection charge at Bhatua PWSS, TW - I BILL/04370/2023-2024 455 01/12/2023 WBSEDCL 15.60 0.00 0 0
7 HOOGHLY Polba - Dadpur Hooghly Division BHATUA PIPED W/S SCHEME (FOR UNCOVERED AREA) UNDER POLBA DADPUR BLOCK , SM/18098 New Designing making and erection of Display Board using logo and tag line of Jal Jeevan Mission to the placed at different work sites and HGJ villages for awareness generation among the people in the district of Hooghly under Chinsurah Sub Division under Hooghly Division PHE Dte 1. Ghatampur PWSS 2. Kanajoli PWSS 3. Bhatua PWSS 4. Shrirampur PWSS Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000777/2023-2024 143/CH 20/02/2024 7 MAA BUNAMATA ENTERPRISE 0.79 0.40 50.63 30
8 HOOGHLY Polba - Dadpur Hooghly Division BHATUA PIPED W/S SCHEME (FOR UNCOVERED AREA) UNDER POLBA DADPUR BLOCK , SM/18098 New BHATUA Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC & construction of switch-room & boundary wall at Proposed TW site, under Chinsurah Sub-Division of Hooghly Division P.H.E Dte. Block Polba-Dadpur, District:- Hooghly [NEW SCHEME] Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000242/2023-2024 2097/HUG 19/07/2023 90 MECCANO UNEMPLOYED ENGINEERS CO - OPERATIVE SOCIETY LTD. 95.59 34.50 36.09 8
9 HOOGHLY Polba - Dadpur Electrical BHATUA PIPED W/S SCHEME (FOR UNCOVERED AREA) UNDER POLBA DADPUR BLOCK , SM/18098 New Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for Bhatua water supply scheme, T.W. No. I & II, Block: Polba Dadpur, District - Hooghly under Electrical Division, PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer4 ORD/000078/2023-2024 1924/ED 15/05/2023 90 UNITED ENTERPRISE 23.21 0.00 0 50
Total 266.89 34.90 13.08