Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 58.04 28.14 48.48  
1 HOOGHLY Electrical Development of Jangalpara Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC by Local Panchayat under , SM/16448 Augmentation Quotation bill for new service connection at Jangalpara W/S. Sch. PH-III BILL/00727/2023-2024 34 12/05/2023 WBSEDCL 2.96 0.00 0 0
2 HOOGHLY Hooghly Division Development of Jangalpara Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC by Local Panchayat under , SM/16448 Augmentation Material Requisition To Resource Division RTOR000324/2023-2024 1384/22/Hug 15/05/2023 Resource Division 2.77 0.00 0 0
3 HOOGHLY Electrical Development of Jangalpara Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC by Local Panchayat under , SM/16448 Augmentation New service connection charges for Jangalpara w/s scheme, PH No.-III BILL/01159/2023-2024 87 12/07/2023 WBSEDCL 0.53 0.00 0 0
4 HOOGHLY Electrical Development of Jangalpara Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC by Local Panchayat under , SM/16448 Augmentation New service connection charges for Jangalpara w/s scheme, PH No.-III BILL/01160/2023-2024 85 12/07/2023 WBSEDCL 2.95 0.00 0 0
5 HOOGHLY Electrical Development of Jangalpara Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC by Local Panchayat under , SM/16448 Augmentation New service connection charges for Jangalpara w/s scheme, PH No.-III BILL/01160/2023-2024 85 12/07/2023 WBSEDCL 2.95 0.00 0 0
6 HOOGHLY Electrical Development of Jangalpara Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC by Local Panchayat under , SM/16448 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Augmentation of Jangalpara water supply scheme, T.W. No. I, Block: Chanditala-I, District- Hooghly under Electrical Division, PHE Dte. Assistant Engineer 1,Assistant Engineer Howrah mechanical Sub Division Junior Engineer2 ORD/001149/2022-2023 1501/ED 28/03/2023 90 INDRANI ENTERPRISE 10.75 10.44 97.12 75
7 HOOGHLY Hooghly Division Development of Jangalpara Piped Water Supply Scheme by installing (01) no. Tube Well including Connection with Distribution, Switch Room and other allied work to meet up the additional water demand induced after execution of FHTC by Local Panchayat under , SM/16448 Augmentation Construction of 3.6 m X 3.0 m Switch Room with Additional Plinth Height, with Sanitary and Water Supply arrangement, Laying of C.I/D.I pipes & specials for connection of Proposed T.W. with distribution system with FHTC For Development of JANGALPARA W/S Scheme under Serampore Sub - Division P.H.E. Dte. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000110/2023-2024 1439/HUG 18/05/2023 45 CITYCON UNEMPLOYED ENGINEERS CO-OP SOCIETY LTD 35.13 17.70 50.38 20
Total 58.04 28.13 48.47