Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 326.61 231.78 70.97  
1 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAKNAN BLOCK: KHANKUL-II , SM/09688 Augmentation Preparation of DPR for Augmentation of KAKNAN Piped Water Supply Scheme Under Arambagh Sub-Division of Hooghly Division P.H.E Dte. [Block-Khanakul-II]. Assistant Engineer Junior Engineer (Civill) ORD/000381/2021-2022 612/Arg 31/12/2021 30 SRIJAN ECOLOGICAL UPLIFTMENT PVT. LTD. 3.17 3.16 99.68 100
2 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAKNAN BLOCK: KHANKUL-II , SM/09688 Augmentation Augmentation of KAKNAN (ZONE-I) Water Supply Scheme with Laying Distribution System & Functional Household Tap Connection, of Switch room, Boundary wall, existing OHR at KHANAKUL-II Block under Arambag Sub-Division, PHE Dte. Assistant Engineer Junior Engineer (Civill) ORD/000192/2022-2023 963//Hug 17/05/2022 60 UNIQUE AGENCY 166.37 165.74 99.62 100
3 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAKNAN BLOCK: KHANKUL-II , SM/09688 Augmentation Construction of Drain, Internal Road & Land Development works at Head Work site of Kaknan W/S Scheme under Arambagh Sub - Division P.H.E. Dte. Assistant Engineer Junior Engineer (Civill) ORD/000437/2022-2023 728/Arg 29/09/2022 20 UNIQUE AGENCY 3.81 0.00 0 100
4 HOOGHLY Electrical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAKNAN BLOCK: KHANKUL-II , SM/09688 Augmentation Quotation Bill for New Service Connection at Aug. of Kaknan W/S. Sch. TW-III Hooghly BILL/00938/2022-2023 null 13/03/2023 WBSEDCL 3.65 0.00 0 0
5 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAKNAN BLOCK: KHANKUL-II , SM/09688 Augmentation SUBMISSION OF QUOTATION BILL FOR THE WBSEDCL BILL RAISED BY THE EXECUTIVE ENGINEER, ELECTRICAL DIVISION, PHE DTE. BILL/00368/2022-2023 BP-2022-23-644 25/03/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 3.65 0.00 0 0
6 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAKNAN BLOCK: KHANKUL-II , SM/09688 Augmentation Sinking of One No Big Dia Tube Well (300 mm X 200 mm) with supply of uPVC pipes & Strainer having depth upto 180 Mtr at KAKNAN (ZONE-II) PWSS of Arambag Sub-Division under Hooghly Division, PHE Dte. SL NO - 10 Assistant Engineer Junior Engineer (Civill) ORD/000345/2022-2023 1958/HUG 07/09/2022 30 OSMAN SEKH 11.32 10.41 91.96 100
7 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAKNAN BLOCK: KHANKUL-II , SM/09688 Augmentation Material Requisition To Resource Division RTOR000143/2023-2024 1385/13/Hug 15/05/2023 Resource Division 1.79 0.00 0 0
8 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAKNAN BLOCK: KHANKUL-II , SM/09688 Augmentation Material Requisition To Resource Division RTOR000163/2021-2022 424/4/Hug 07/03/2022 Resource Division 36.05 0.00 0 0
9 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAKNAN BLOCK: KHANKUL-II , SM/09688 Augmentation Material Requisition To Resource Division RTOR000023/2022-2023 1124/4/HUG 06/06/2022 Resource Division 12.32 0.00 0 0
10 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAKNAN BLOCK: KHANKUL-II , SM/09688 Augmentation Material Requisition To Resource Division RTOR000106/2022-2023 1773/40/Hug 29/08/2022 Resource Division 1.38 0.00 0 0
11 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAKNAN BLOCK: KHANKUL-II , SM/09688 Augmentation Material Requisition To Resource Division RTOR000047/2022-2023 1590/2/Hug 03/08/2022 Resource Division 6.15 0.00 0 0
12 HOOGHLY Electrical AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAKNAN BLOCK: KHANKUL-II , SM/09688 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Augmentation of Kaknan water supply scheme, T.W. No.- I, Block: Khanakul-II, District- Hooghly under Electrical Division, PHE Dte. Assistant Engineer 2 Junior Engineer4 ORD/000287/2022-2023 937/ED 22/02/2023 90 OSMAN SEKH 10.75 10.38 96.56 83
13 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KAKNAN BLOCK: KHANKUL-II , SM/09688 Augmentation Augmentation of KAKNAN (ZONE-II) Water Supply Scheme with Laying Distribution System & Functional Household Tap Connection, Construction of Switch Room & Boundary Wall of 3rd T.W Site at KHANAKUL-II Block under Arambag Sub-Division, PHE Dte. Assistant Engineer Junior Engineer (Civill) ORD/000095/2022-2023 1086/Hug 02/06/2022 30 SWASTIK ENTERPRISE 66.20 42.09 63.58 50
Total 326.62 231.78 70.96