Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 296.84 137.78 46.42  
1 HOOGHLY Chinsurah - Magra Hooghly Division REFAITPUR (ZONE-II) PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK , SM/15251 New Material Requisition To Resource Division RTOR000522/2023-2024 3059/9/Hug 11/10/2023 Resource Division 9.67 0.00 0 0
2 HOOGHLY Chinsurah - Magra Hooghly Division REFAITPUR (ZONE-II) PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK , SM/15251 New Designing making and erection of Display Board using logo and tag line of Jal Jeevan Mission to the placed at different work sites and HGJ villages for awareness generation among the people in the district of Hooghly under Chinsurah Sub Division under Hooghly Division PHE Dte. 1. Dashghara PWSS 2. Patul PWSS 3. Durgapur PWSS 4. Khajurdaha PWSS 5. Refaitpur Z-II PWSS 6. Kalora PWSS Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000774/2023-2024 140/CH 20/02/2024 7 MAA BUNAMATA ENTERPRISE 0.95 0.48 50.53 30
3 HOOGHLY Chinsurah - Magra Hooghly Division REFAITPUR (ZONE-II) PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK , SM/15251 New Designing making and erection of Display Board using logo and tag line of Jal Jeevan Mission to the placed at different work sites and HGJ villages for awareness generation among the people in the district of Hooghly under Chinsurah Sub Division under Hooghly Division PHE Dte 1. Refaitpur Z-II PWSS 2. Sankhangar Chakbasberia PWSS 3. Basudebbati PWSS 4. Dantra PWSS 5. Goswami Malipara PWSS 6. Amra PWSS Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000822/2023-2024 200/CH 29/02/2024 7 LIMRA SOCIAL WELFARE SOCIETY 0.95 0.48 50.53 50
4 HOOGHLY Chinsurah - Magra Electrical REFAITPUR (ZONE-II) PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK , SM/15251 New Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for Refaitpur water supply scheme Zone I TW No I and II and Zone II TW No I and II Block Chinsurah Mogra, District Hooghly under ED PHED. Assistant Engineer 2 ,Assistant Engineer Howrah mechanical Sub Division Junior Engineer4 ORD/000232/2022-2023 863/ED 14/02/2023 90 ORIENTAL ENGINEERING CO. 40.50 0.00 0 90
5 HOOGHLY Chinsurah - Magra Hooghly Division REFAITPUR (ZONE-II) PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK , SM/15251 New REFAITPUR ZONE-II Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under CHINSURAH MAGRA Block, District:- Hooghly [NEW SCHEME] Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000810/2022-2023 975/Hug 31/03/2023 270 DAS ENTERPRISE (SAMIR DAS) 244.77 136.82 55.9 30
Total 296.86 137.78 46.41