Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 289.5 203.72 70.37  
1 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KHARSARAI. , SM/09689 Augmentation Preparation of DPR for Augmentation of Kharsarai Water Supply Scheme under Serampore Sub-Division of Hooghly Division, P.H.E. Dte. [Block-Chanditala-II] Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000394/2021-2022 287/SER 18/02/2022 20 SRIJAN ECHOLOGICAL UPLIFTMENT PVT. LTD. 2.80 2.80 100 100
2 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KHARSARAI. , SM/09689 Augmentation Repairing work of O.H.R. and allied works of Boundary Wall, Gate, Pump room etc. at KHARSARAI water supply scheme due to damages caused by Super Cyclone "AMPHAN" Under Serampore Sub-Division of Hooghly Division, P.H.E. Dte. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000233/2021-2022 1918/HUg 27/10/2021 30 R.K. TRADERS 6.22 6.20 99.68 100
3 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KHARSARAI. , SM/09689 Augmentation Repairing work of O.H.R. and allied works of Boundary Wall, Gate, Pump room etc. at KHARSARAI water supply scheme due to damages caused by Super Cyclone "AMPHAN" Under Serampore Sub-Division of Hooghly Division, P.H.E. Dte. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000228/2021-2022 1867/Hug 07/10/2021 30 R.K. TRADERS 6.22 0.00 0 100
4 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KHARSARAI. , SM/09689 Augmentation Sinking of I(One) No Big dia tube well (300 mmx200mm) with supply of PVC Pipe and strainer and having depth upto 150M of Kharsarai W/S Scheme under Serampore Sub-Division of Hooghly Division, P.H.E. Dte. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000145/2022-2023 1416/HUG 12/07/2022 30 B.R SUPPLIERS 9.80 9.47 96.63 100
5 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KHARSARAI. , SM/09689 Augmentation Material Requisition To Resource Division RTOR000308/2023-2024 1384/5/Hug 15/05/2023 Resource Division 10.71 0.00 0 0
6 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KHARSARAI. , SM/09689 Augmentation Material Requisition To Resource Division RTOR000156/2021-2022 422/1/Hug 07/03/2022 Resource Division 39.63 0.00 0 0
7 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KHARSARAI. , SM/09689 Augmentation Material Requisition To Resource Division RTOR000008/2022-2023 1122/5/HUG 06/06/2022 Resource Division 12.32 0.00 0 0
8 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KHARSARAI. , SM/09689 Augmentation Laying Distribution of left out portion of pipeline to restore the water supply at Kharsarai Functional Hosuehold Tap Connection at Kharsarai Water Supply Scheme within Chanditala-II Block under Serampore Sub-Division of Hooghly Division, P.H.E. Dte. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000025/2024-2025 2224/HUG 10/06/2024 30 ARATI ENGINEERING 14.18 13.75 96.97 100
9 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KHARSARAI. , SM/09689 Augmentation Augmentation of Kharsari Piped WS scheme with LDS Rising main Construction of switch room without w/s & toilet construction repairing of boundary wall switch room with FHTC work at Chanditala II Block of Hooghly Dist under Hooghly Divn PHE Dte. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000356/2022-2023 638/HUG 01/04/2022 180 M/S S.G. CONSTRUCTION 166.73 163.66 98.16 80
10 HOOGHLY Hooghly Division AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR KHARSARAI. , SM/09689 Augmentation Painting of OHR, Construction of Guard Wall with Boundary Wall, Pathwaty, Drain at Kharsarai Water Supply Scheme under Serampore Sub-Division of Hooghly Division, P.H.E. Dte. Assistant Engineer (Civil) Junior Engineer (Civill) ORD/000848/2023-2024 732/HUG 05/03/2024 60 M/S ATANU DAS 20.89 7.84 37.53 80
Total 289.50 203.72 70.37