Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 906.27 76.11 8.4  
1 HOOGHLY Electrical Augmentation Of Piped Water Supply Scheme For KHANAKUL , SM/18645 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical/ mechanical equipments etc. including allied works for Augmentation of Khanakul water supply scheme, T.W. No. I & II, Block: Khanakul-I, District- Hooghly under Electrical Division, PHE Dte. ORD/000929/2023-2024 3600/ED 28/08/2023 90 M/S S.R. ENTERPRISE 21.49 0.00 0 0
2 HOOGHLY Hooghly Division Augmentation Of Piped Water Supply Scheme For KHANAKUL , SM/18645 Augmentation Augmentation of KHANAKUL ZONE-I Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 350cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under KHANAKUL-I Block of Arambag Sub-Division under Hooghly Division, PHE Dte. [AUGMENTATION SCHEME] Assistant Engineer Junior Engineer (Civill) ORD/000317/2023-2024 2392/HUG 10/08/2023 270 SUBHANKAR BANERJEE 387.30 43.69 11.28 15
3 HOOGHLY Hooghly Division Augmentation Of Piped Water Supply Scheme For KHANAKUL , SM/18645 Augmentation Sinking of 3rd tube-well by D.R. Rig method , Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall, Laying rising main pipe for inter connection between Proposed T.W & Distribution of KHANAKUL (ZONE-I) Piped Water Supply Scheme under ARAMBAGH Sub-Division of Hooghly Division P.HE Dte. Assistant Engineer ORD/000812/2023-2024 592/HUG 22/02/2024 60 TOTON MONDAL 29.75 0.00 0 0
4 HOOGHLY Hooghly Division Augmentation Of Piped Water Supply Scheme For KHANAKUL , SM/18645 Augmentation Field level data validation of FHTC executed by various Agencies on the basis of pictorial data with the objective of controlling multiple entry, improving data quality in terms of absolute household by verification through electric connection or any other unique documents and making error free database in different Pipe Water Supply Scheme underKhanakul I & II &Goghat I & II Block (Part-I) in the District of Hooghly under Chinsurah Sub Division under Hooghly Division, PHE Dte. Assistant Engineer Junior Engineer (Civill) ORD/000162/2024-2025 2831/HUG 09/08/2024 15 HORIZEN 1.60 0.00 0 100
5 HOOGHLY Electrical Augmentation Of Piped Water Supply Scheme For KHANAKUL , SM/18645 Augmentation Quotation money deposition for new service connection at Khanakul W/S Zone- I ,T.W No.-I , Hooghly APP. No.- 5004036875 SM/18645 BILL/06213/2023-2024 824 01/03/2024 0 WBSEDCL 4.35 0.00 0 0
6 HOOGHLY Electrical Augmentation Of Piped Water Supply Scheme For KHANAKUL , SM/18645 Augmentation Quotation money deposition for new service connection at khanakul w/s scheme, zone-II, T.W. No.-II, Dist.-Hooghly, under Electrical Division, PHE Dte. Application No.- 5004036737/Quot/03 Reference ID- 503576720 SM Code- 18645 BILL/06214/2023-2024 823 01/03/2024 0 WBSEDCL 3.39 0.00 0 0
7 HOOGHLY Hooghly Division Augmentation Of Piped Water Supply Scheme For KHANAKUL , SM/18645 Augmentation Augmentation of KHANAKUL ZONE-II Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 350cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site under KHANAKUL-I Block of Arambag Sub-Division under Hooghly Division, PHE Dte. [AUGMENTATION SCHEME] Assistant Engineer Junior Engineer (Civill) ORD/000304/2023-2024 2368/HUG 08/08/2023 601 M/S. NANDY ENTERPRISE 382.90 19.26 5.03 20
8 HOOGHLY Hooghly Division Augmentation Of Piped Water Supply Scheme For KHANAKUL , SM/18645 Augmentation Sinking of 3rd tube-well by D.R. Rig method, Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall, Laying rising main pipe for inter connection between Proposed T.W & Distribution of KHANAKUL (ZONE-II) Piped Water Supply Scheme under ARAMBAGH Sub-Division of Hooghly Division P.HE Dte. Assistant Engineer Junior Engineer (Civill) ORD/000813/2023-2024 596/HUG 22/02/2024 540 ANIRUDDHA FARUQUE 29.60 13.16 44.46 50
9 HOOGHLY Electrical Augmentation Of Piped Water Supply Scheme For KHANAKUL , SM/18645 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for KHANAKUL PIPED W/S SCHEME, T.W. No. IV, Block: Khanakul - I, District - Hooghly under JJM Program under Electrical Division PHE Dte. Assistant Engineer Howrah mechanical Sub Division Junior Engineer3,Junior Engineer4 ORD/000158/2024-2025 1181/ED 14/06/2024 630 M/S A.K BANERJEE 10.74 0.00 0 10
10 HOOGHLY Electrical Augmentation Of Piped Water Supply Scheme For KHANAKUL , SM/18645 Augmentation Supply, delivery & installation of submersible pumping machinery and other electrical / mechanical equipments etc. including allied works for KHANAKUL PIPED W/S SCHEME, T.W. No. III, Block: Khanakul - I, District - Hooghly under JJM Program under Electrical Division PHE Dte. Assistant Engineer 2 ,Assistant Engineer Howrah mechanical Sub Division Junior Engineer4 ORD/000157/2024-2025 1180/ED 14/06/2024 382 M/S A.K BANERJEE 10.73 0.00 0 50
11 HOOGHLY Hooghly Division Augmentation Of Piped Water Supply Scheme For KHANAKUL , SM/18645 Augmentation Designing making and erection of Display Board using logo and tag line of LAND DEMARCATION OF P.H.E. Dte. to the placed at different work sites and HGJ villages for awareness generation among the people in the district of Hooghly under ARAMBAGH Sub Division under Hooghly Division PHE Dte. (1) KHANAKUL PWSS - 6 nos (2) KRISHNANAGAR PWSS - 4nos (3) PATUL PWSS - 4nos Assistant Engineer Junior Engineer (Civill) ORD/002646/2024-2025 810/Arg 23/08/2024 30 HAZRA CONSTRUCTION 0.98 0.00 0 0
12 HOOGHLY Hooghly Division Augmentation Of Piped Water Supply Scheme For KHANAKUL , SM/18645 Augmentation Construction of 2 nos new Pump House, Repairing and Renovation of Store cum Office room, Boundary wall of Khanakul PWSS under Arambagh Sub Division, PHE Dte. (2nd Call of WBPHE/EE/20/HUG/2024-25; SL-3) Assistant Engineer Junior Engineer (Civill) ORD/000273/2025-2026 1495/HUG 11/06/2025 60 M/S PRADYUT KUMAR HAZRA (PARTNERSHIP) 23.44 0.00 0 100
Total 906.27 76.10 8.4