| SL No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Scheme Name
Scheme for which Work has been started as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Sub Division | Name of AE entrusted | Name of JE entrusted | Date of Sanction
Scheme Sanctioning Date as per PHED-MIS
|
Date of Commencement
Date of Work Started as per PHED-MIS
|
Target Date of Completion
Target Date of Completion as per PHED-MIS
|
Date Of Updation
Information last updated on as per PHED-MIS
|
Work Order Issued
Total No. of Work Orders issued under this Scheme as per PHED-MIS
|
Physical Progress (in %) Achievement of Physical Progress for this Scheme as per PHED-MIS
|
Financial Progress (in %) Achievement of Financial Progress for this Scheme as per PHED-MIS
|
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 334 | 11,887 | # | 57.5 | |||||||||||
| 1 | ALIPURDUAR | Alipurduar - II | AUGMENTATION OF JASHODANGA WATER SUPPLY SCHEME, SM/10668 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 29/04/2022 | 14/03/2023 | 31/05/2025 | 11/12/2025 | 4 | 90 | 35 |
| 2 | ALIPURDUAR | Falakata | DALIMPUR WATER SUPPLY SCHEME, SM/00016 | New | 06/10/1989 | 06/07/2021 | 3 | 100 | 2 | |||||
| 3 | ALIPURDUAR | Alipurduar - II | AUGMENTATION OF PURBA CHEPANI WATER SUPPLY SCHEME, SM/10669 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 29/04/2022 | 10/08/2022 | 30/06/2025 | 11/12/2025 | 7 | 30 | 15 |
| 4 | ALIPURDUAR | Alipurduar - II | PUTIMARI WATER SUPPLY SCHEME, SM/00017 | New | 28/08/1989 | 24/05/2021 | 5 | 100 | 3 | |||||
| 5 | ALIPURDUAR | Alipurduar - II | AUGMENTATION OF SALSALABARI WATER SUPPLY SCHEME., SM/10670 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 29/04/2022 | 19/09/2022 | 31/07/2025 | 11/12/2025 | 7 | 60 | 32 |
| 6 | ALIPURDUAR | Madarihat | BARA HAUDA & DEBSIMAL AREAS OF BIRPARA TEA GARDEN, SM/00019 | New | Alipurduar Mechanical Sub Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | 02/01/1992 | 17/04/2025 | 31/07/2019 | 0 | 100 | 6 | ||
| 7 | ALIPURDUAR | Alipurduar - I | AUGMENTATION OF BIRPARA (APD) WATER SUPPLY SCHEME, SM/10671 | Augmentation | Birpara Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 29/04/2022 | 13/05/2022 | 31/05/2025 | 11/12/2025 | 6 | 88 | 15 |
| 8 | ALIPURDUAR | Falakata | JATESWAR WATER SUPPLY SCHEME, SM/00023 | New | 08/11/1966 | 06/07/2021 | 4 | 100 | 80 | |||||
| 9 | ALIPURDUAR | Madarihat | AUGMENTATION OF PASCHIM KHAIRBARI WATER SUPPLY SCHEME, SM/10672 | Augmentation | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 29/04/2022 | 10/08/2022 | 31/07/2025 | 11/12/2025 | 5 | 75 | 1 |
| 10 | ALIPURDUAR | Kalchini | KALCHINI WATER SUPPLY SCHEME, SM/00026 | New | 16/06/1970 | 27/04/2021 | 4 | 100 | 224 | |||||
| 11 | ALIPURDUAR | Alipurduar - II | AUGMENTATION OF LOKNATHPUR WATER SUPPLY SCHEME, SM/10673 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 29/04/2022 | 13/05/2022 | 30/06/2025 | 11/12/2025 | 7 | 85 | 11 |
| 12 | ALIPURDUAR | Kumargram | KAIJALI BASTY WATER SUPPLY SCHEME, SM/00032 | New | 27/02/1979 | 02/11/2020 | 5 | 100 | 0 | |||||
| 13 | ALIPURDUAR | Alipurduar - I | AUGMENTATION OF BANCHUKAMARI WATER SUPPLY SCHEME, SM/10674 | Augmentation | Birpara Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 29/04/2022 | 10/08/2022 | 31/07/2025 | 11/12/2025 | 6 | 70 | 19 |
| 14 | ALIPURDUAR | Kalchini | JAYANTI WATER SUPPLY SCHEME, SM/00034 | New | 27/02/1979 | 05/10/2020 | 5 | 100 | 0 | |||||
| 15 | ALIPURDUAR | Alipurduar - I | AUGMENTATION OF MUNSHIPARA WATER SUPPLY SCHEME, SM/10675 | Augmentation | Birpara Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 29/04/2022 | 16/03/2023 | 31/10/2025 | 11/12/2025 | 3 | 85 | 29 |
| 16 | ALIPURDUAR | Madarihat | BIRPARA WATR SUPPLY SCHEME, SM/00035 | New | 27/02/1979 | 16/09/2020 | 7 | 100 | 0 | |||||
| 17 | ALIPURDUAR | Alipurduar - I | AUGMENTATION OF TAPASHIKHATA PIPED WATER SUPPLY SCHEME, SM/10676 | Augmentation | Birpara Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 29/04/2022 | 13/05/2022 | 31/05/2025 | 11/12/2025 | 6 | 85 | 16 |
| 18 | ALIPURDUAR | Madarihat | NEPANIA WATER SCHEME (NORTH BANDAPARA TEA GARDEN), SM/00039 | New | 20/03/1982 | 0 | 100 | 0 | ||||||
| 19 | ALIPURDUAR | Alipurduar - II | AUGMENTATION OF CHANDIRJHAR WATER SUPPLY SCHEME, SM/10677 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 29/04/2022 | 13/05/2022 | 31/05/2025 | 11/12/2025 | 6 | 85 | 8 |
| 20 | ALIPURDUAR | Madarihat | DALMORE TG & RAMJHORA TG WATER SUPPLY SCHEME, SM/00043 | New | 22/02/1989 | 23/04/2020 | 01/01/1996 | 6 | 100 | 22 | ||||
| 21 | ALIPURDUAR | Falakata | AUGMENTATION OF JOGENDRAPUR WATER SUPPLY SCHEME, SM/10678 | Augmentation | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 29/04/2022 | 01/03/2023 | 31/05/2025 | 11/12/2025 | 5 | 90 | 27 |
| 22 | ALIPURDUAR | Kumargram | KUMARGRAM WATER SUPPLY SCHEME, SM/00044 | New | 22/02/1989 | 04/09/2020 | 8 | 100 | 20 | |||||
| 23 | ALIPURDUAR | Falakata | FALAKATA WATER SUPPLY SCHEME, SM/00138 | New | Alipurduar Mechanical Sub Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | 29/01/1979 | 25/03/1979 | 24/03/1982 | 11/12/2025 | 5 | 94 | ||
| 24 | ALIPURDUAR | Madarihat | UTTAR MADARIHAT WATER SUPPLY SCHEME, SM/00139 | New | Alipurduar Mechanical Sub Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | 28/01/1979 | 28/03/1979 | 02/01/1983 | 11/12/2025 | 3 | 132 | ||
| 25 | ALIPURDUAR | Kalchini | JOYGAON WATER SUPPLY SCHEME, SM/00142 | New | Alipurduar Mechanical Sub Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | 16/11/1979 | 21/02/1979 | 20/03/1983 | 11/12/2025 | 0 | 13 | ||
| 26 | ALIPURDUAR | Kalchini | HASIMARA AREAS WATER SUPPLY SCHEME, SM/00143 | New | Alipurduar Mechanical Sub Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | 10/09/1981 | 14/02/1981 | 31/03/1984 | 11/12/2025 | 2 | 10 | ||
| 27 | ALIPURDUAR | Alipurduar - I | DAKSHIN SONARPUR WATER SUPPLY SCHEME, SM/00144 | New | Northern Mechanical Division II | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | 27/12/1983 | 27/12/1983 | 31/12/2014 | 11/12/2025 | 4 | 0 | ||
| 28 | ALIPURDUAR | Alipurduar - II | BHATIBARI WATER SUPPLY SCHEME, SM/00145 | New | 13/11/1984 | 01/06/2009 | 31/12/2014 | 11/12/2025 | 5 | 0 | ||||
| 29 | ALIPURDUAR | Falakata | IMPLEMENTATION OF STANDALONE WATER SUPPLY SYSTEM IN THE VILLAGES HAVING LESS THAN 100 HOUSEHOLD UNDER ALIPURDUAR DISTRICT PIPED WATER SUPPLY SCHEME, SM/10776 | New | Birpara Sub-Division | Birpara A.E | Birpara Sub Division | 23/05/2022 | 31/05/2022 | 31/05/2025 | 11/12/2025 | 2 | 91 | 58 |
| 30 | ALIPURDUAR | Alipurduar - II | SAMUKTALA WATER SUPPLY SCHEME, SM/00146 | New | Alipurduar Mechanical Sub Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | 13/11/1984 | 12/02/1985 | 31/12/2014 | 11/12/2025 | 8 | 10 | ||
| 31 | ALIPURDUAR | Kumargram | BAROBISA AREA WATER SUPPLY SCHEME, SM/00147 | New | Alipurduar Mechanical Sub Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, PHE(Md. Mahfuz) Dte. | 13/11/1984 | 14/02/1985 | 31/03/1988 | 11/12/2025 | 4 | 12 | |
| 32 | ALIPURDUAR | Alipurduar - II | TOTPARA WATER SUPPLY SCHEME, SM/00148 | New | 29/03/1985 | 11/02/1985 | 02/03/1987 | 11/12/2025 | 8 | 0 | ||||
| 33 | ALIPURDUAR | Alipurduar - I | BHOLARDABARI WATER SUPPLY SCHEME, SM/00150 | New | 13/06/1989 | 11/06/1988 | 31/12/2014 | 11/12/2025 | 2 | 0 | ||||
| 34 | ALIPURDUAR | Alipurduar - I | AUGMENTATION OF PATLAKHAWA WATER SUPPLY SCHEME, SM/11401 | Augmentation | Birpara Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 04/07/2022 | 07/07/2022 | 31/07/2025 | 11/12/2025 | 9 | 75 | 95 |
| 35 | ALIPURDUAR | Alipurduar - I | PATLAKHAWA WATER SUPPLY SCHEME, SM/00151 | New | 14/07/1992 | 10/01/1996 | 31/12/2014 | 11/12/2025 | 2 | 0 | ||||
| 36 | ALIPURDUAR | Kalchini | AUGMENTATION OF JAYANTI PIPED WATER SUPPLY SCHEME, SM/11402 | Augmentation | Alipurduar Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 04/07/2022 | 07/07/2022 | 30/06/2025 | 11/12/2025 | 8 | 90 | 77 |
| 37 | ALIPURDUAR | Alipurduar - II | UTTAR MAJHERDABARI WATER SUPPLY SCHEME, SM/00152 | New | 14/07/1992 | 14/02/1996 | 10/01/1998 | 11/12/2025 | 2 | 12 | ||||
| 38 | ALIPURDUAR | Alipurduar - I | AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME, SM/11459 | Augmentation | Birpara Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 12/07/2022 | 15/07/2022 | 31/07/2025 | 11/12/2025 | 44 | 72 | 60 |
| 39 | ALIPURDUAR | Alipurduar - I | PURBA KANTHALBARI WATER SUPPLY SCHEME, SM/00153 | New | 14/07/1992 | 12/11/1995 | 31/12/2014 | 11/12/2025 | 3 | 0 | ||||
| 40 | ALIPURDUAR | Kumargram | KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME, SM/11482 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 14/07/2022 | 15/07/2022 | 31/05/2025 | 11/12/2025 | 18 | 90 | 56 |
| 41 | ALIPURDUAR | Kumargram | NARTHALI WATER SUPPLY SCHEME, SM/00156 | New | 26/12/1995 | 21/03/1996 | 31/03/1999 | 11/12/2025 | 4 | 8 | ||||
| 42 | ALIPURDUAR | Madarihat | Bandpani Tea Garden Areas Piped Water Supply Scheme., SM/11483 | New | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 14/07/2022 | 15/07/2022 | 30/06/2025 | 11/12/2025 | 18 | 80 | 57 |
| 43 | ALIPURDUAR | Falakata | BHUTNIRGHAT WATER SUPPLY SCHEME, SM/00157 | New | 19/01/2005 | 22/03/1996 | 31/12/2014 | 11/12/2025 | 7 | 4 | ||||
| 44 | ALIPURDUAR | Kumargram | NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME, SM/11484 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 14/07/2022 | 15/07/2022 | 31/05/2025 | 11/12/2025 | 14 | 90 | 62 |
| 45 | ALIPURDUAR | Falakata | JAGIJHORA BARABAK MOUZA WATER SUPPLY SCHEME, SM/00848 | New | Northern Mechanical Division II | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 1, Northern Mechanical Division-II,PHE Dte. | 16/11/2005 | 16/11/2005 | 30/11/2013 | 11/12/2025 | 4 | 1 | |
| 46 | ALIPURDUAR | Kumargram | SANKOSH TG AREA PIPED WATER SUPPLY SCHEME, SM/11485 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 14/07/2022 | 15/07/2022 | 31/12/2025 | 11/12/2025 | 12 | 90 | 67 |
| 47 | ALIPURDUAR | Madarihat | LANKAPARA WATER SUPPLY SCHEME, SM/00892 | New | Alipurduar Mechanical Sub Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | 19/01/2005 | 08/07/2021 | 31/03/2010 | 6 | 10 | |||
| 48 | ALIPURDUAR | Madarihat | UTTAR SISUBARI WATER SUPPLY SCHEME, SM/00895 | New | 18/02/2003 | 31/03/2007 | 25/02/2010 | 11/12/2025 | 3 | 0 | ||||
| 49 | ALIPURDUAR | Madarihat | HOASINBAD TEA GARDEN AREA PIPED WATER SUPPLY SCHEME, SM/11696 | New | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 29/07/2022 | 10/11/2022 | 31/05/2025 | 11/12/2025 | 9 | 85 | 61 |
| 50 | ALIPURDUAR | Kalchini | UTTAR LATABARI (NM) WATER SUPPLY SCHEME, SM/01021 | New | 25/03/2003 | 28/03/2003 | 05/09/2013 | 11/12/2025 | 1 | 4 | ||||
| 51 | ALIPURDUAR | Alipurduar - II | SHRINATHPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME, SM/11709 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 29/07/2022 | 10/11/2022 | 31/05/2025 | 11/12/2025 | 25 | 95 | 83 |
| 52 | ALIPURDUAR | Kumargram | UTTAR KAMAKSHYAGURI (NM) WATER SUPPLY SCHEME, SM/01022 | New | Alipurduar Mechanical Sub Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | 29/08/2003 | 23/02/2004 | 03/03/2012 | 11/12/2025 | 7 | 0 | ||
| 53 | ALIPURDUAR | Falakata | RAICHENGA PIPED WATER SUPPLY SCHEME , SM/01083 | New | 23/02/2004 | 31/07/2019 | 0 | 100 | 0 | |||||
| 54 | ALIPURDUAR | Madarihat | AUGMENTATION OF TOTOPARA AREA PIPED WATER SUPPLY SCHEME, SM/11765 | Augmentation | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block | 03/08/2022 | 04/04/2023 | 31/05/2025 | 11/12/2025 | 5 | 60 | 42 |
| 55 | ALIPURDUAR | Alipurduar - I | SALKUMARHAT RURAL WATER SUPPLY SCHEME, SM/01158 | New | 16/01/2007 | 25/03/2007 | 15/01/2011 | 11/12/2025 | 0 | 0 | ||||
| 56 | ALIPURDUAR | Madarihat | AUGMENTATION OF NEPANIA PIPED WATER SUPPLY SCHEME, SM/11766 | Augmentation | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 03/08/2022 | 13/12/2022 | 31/07/2025 | 11/12/2025 | 4 | 75 | 54 |
| 57 | ALIPURDUAR | Alipurduar - II | Parokata water supply scheme, SM/01378 | New | 06/12/2007 | 06/12/2007 | 31/10/2011 | 11/12/2025 | 1 | 0 | ||||
| 58 | ALIPURDUAR | Madarihat | AUGMENTATION OF LANKAPARA TG FOR LONKAPARA HAT AREA PIPED WATER SUPPLY SCHEME, SM/11767 | Augmentation | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, PHE(Md. Mahfuz) Dte. | 03/08/2022 | 13/12/2022 | 31/12/2025 | 11/12/2025 | 14 | 80 | 43 |
| 59 | ALIPURDUAR | Madarihat | Makrapara Water Supply Scheme, SM/01416 | New | 05/10/2007 | 22/07/2025 | 31/07/2019 | 0 | 100 | 0 | ||||
| 60 | ALIPURDUAR | Kumargram | AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME, SM/11958 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 25/08/2022 | 21/11/2022 | 30/11/2025 | 11/12/2025 | 15 | 85 | 40 |
| 61 | ALIPURDUAR | Madarihat | AUGMENTATION OF UTTAR SISUBARI WATER SUPPLY SCHEME, SM/11959 | Augmentation | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 25/08/2022 | 19/05/2023 | 30/06/2025 | 11/12/2025 | 8 | 65 | 11 |
| 62 | ALIPURDUAR | Madarihat | AUGMENTATION OF DALMORE & RAMJHORA TEA GARDEN PIPED WATER SUPPLY SCHEME, SM/11960 | Augmentation | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 25/08/2022 | 22/12/2022 | 30/06/2025 | 11/12/2025 | 8 | 72 | 28 |
| 63 | ALIPURDUAR | Alipurduar - I | AUGMENTATION OF DAKSHIN SONAPUR WATER SUPPLY SCHEME, SM/11970 | Augmentation | Alipurduar RWS Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 29/08/2022 | 05/09/2022 | 31/12/2025 | 11/12/2025 | 26 | 70 | 37 |
| 64 | ALIPURDUAR | Alipurduar - I | Water Supply Scheme for Salkumarhat Mouza, SM/01803 | New | 16/01/2007 | 25/03/2007 | 15/01/2011 | 11/12/2025 | 2 | 0 | ||||
| 65 | ALIPURDUAR | Madarihat | Makrapara W/S Scheme, SM/02173 | New | 05/10/2007 | 08/07/2021 | 31/03/2011 | 3 | 100 | 0 | ||||
| 66 | ALIPURDUAR | Kumargram | AUGMENTATION OF KUMARGRAM PIPED WATER SUPPLY SCHEME, SM/11985 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 01/09/2022 | 05/09/2022 | 30/06/2025 | 11/12/2025 | 27 | 75 | 55 |
| 67 | ALIPURDUAR | Kumargram | KARTIKA TEA GARDEN AREA PIPED WAATER SUPPLY SCHEME, SM/11991 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 01/09/2022 | 21/11/2022 | 31/05/2025 | 11/12/2025 | 12 | 90 | 77 |
| 68 | ALIPURDUAR | Kumargram | PHASKHAWA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME, SM/11992 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | Birpara Sub Division | 01/09/2022 | 21/11/2022 | 31/05/2025 | 11/12/2025 | 10 | 85 | 64 |
| 69 | ALIPURDUAR | Alipurduar - II | KOHINUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME, SM/12113 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 02/09/2022 | 21/11/2022 | 31/07/2025 | 11/12/2025 | 17 | 81 | 47 |
| 70 | ALIPURDUAR | Kumargram | RAYDAK TEA GARDEN AREA PIPED WATER SUPPLY SCHEME, SM/12114 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 02/09/2022 | 21/11/2022 | 30/04/2027 | 11/12/2025 | 21 | 90 | 61 |
| 71 | ALIPURDUAR | Madarihat | Totopara Water Supply Scheme, SM/03080 | New | 25/07/2025 | 8 | 100 | 164 | ||||||
| 72 | ALIPURDUAR | Madarihat | Rej. of Totopara Water Supply, SM/03081 | Augmentation | 01/03/2008 | 31/03/2010 | 11/12/2025 | 0 | 0 | |||||
| 73 | ALIPURDUAR | Falakata | Bhutnirghat Ghat and Adj. Mouzas Water Supply Scheme, SM/03082 | New | 28/03/2005 | 31/12/2007 | 11/12/2025 | 0 | 0 | |||||
| 74 | ALIPURDUAR | Kalchini | AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME, SM/12361 | Augmentation | Alipurduar Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 13/09/2022 | 10/01/2023 | 30/06/2025 | 11/12/2025 | 24 | 35 | 16 |
| 75 | ALIPURDUAR | Kalchini | Augmentation water supply scheme for Jayanty water supply scheme., SM/03317 | Augmentation | 23/02/2011 | 31/05/2017 | 0 | 100 | 0 | |||||
| 76 | ALIPURDUAR | Alipurduar - II | AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME, SM/12561 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 14/09/2022 | 19/09/2022 | 30/04/2026 | 11/12/2025 | 45 | 85 | 63 |
| 77 | ALIPURDUAR | Alipurduar - I | Alipurduar Municipal Water Supply Scheme, SM/03561 | New | 24/02/1981 | 07/10/2020 | 5 | 100 | INF | |||||
| 78 | ALIPURDUAR | Alipurduar - I | Water Supply Scheme for Birpara Mouzas, SM/03602 | New | 02/09/2016 | 21/12/2011 | 31/12/2014 | 11/12/2025 | 1 | 0 | ||||
| 79 | ALIPURDUAR | Alipurduar - I | Ground Water Based Water Supply Scheme for Banchukamari & Adj. Mouzas, SM/03708 | New | 25/01/2012 | 06/09/2012 | 30/09/2014 | 11/12/2025 | 3 | 5 | 0 | |||
| 80 | ALIPURDUAR | Madarihat | SISHA JUMRHA PIPED WATER SUPPLY SCHEME, SM/12753 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 20/09/2022 | 27/03/2023 | 30/06/2025 | 11/12/2025 | 9 | 88 | 61 |
| 81 | ALIPURDUAR | Alipurduar - II | Water Supply Scheme for Purba Chenpani & adj. mouzas , SM/03828 | New | Alipurduar Mechanical Sub Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | 27/04/2012 | 17/04/2012 | 31/12/2014 | 11/12/2025 | 5 | 0 | ||
| 82 | ALIPURDUAR | Alipurduar - I | NAOTHOARTARI PIPED WATER SUPPLY SCHEME, SM/12754 | New | Alipurduar RWS Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 20/09/2022 | 31/03/2023 | 30/04/2027 | 11/12/2025 | 7 | 68 | 48 |
| 83 | ALIPURDUAR | Alipurduar - I | Water Supply Scheme for Tapashikhata & adj. mouzas , SM/03829 | New | Alipurduar Mechanical Sub Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | 27/04/2012 | 17/04/2012 | 31/12/2014 | 11/12/2025 | 5 | 0 | ||
| 84 | ALIPURDUAR | Madarihat | Ground Water Based Water Supply Scheme for Paschim Khair Bari & adjoining mouzas, SM/03908 | New | 02/09/2016 | 05/02/2013 | 31/12/2017 | 11/12/2025 | 8 | 100 | 10 | |||
| 85 | ALIPURDUAR | Alipurduar - II | Ground water based water supply scheme for Bakla and adjoining mouzas, SM/04006 | New | 02/09/2016 | 21/05/2013 | 30/06/2017 | 11/12/2025 | 5 | 100 | 16 | |||
| 86 | ALIPURDUAR | Alipurduar - II | Ground water based water supply scheme for Salsalabari and adjoining mouza, SM/04011 | New | Alipurduar Mechanical Sub Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | 02/09/2016 | 15/05/2013 | 31/08/2019 | 11/12/2025 | 8 | 100 | 16 | |
| 87 | ALIPURDUAR | Falakata | Ground water based water supply scheme for Jogendrapur and adjoining mouzas, SM/04039 | New | 02/09/2016 | 08/06/2013 | 31/08/2019 | 11/12/2025 | 3 | 100 | 3 | |||
| 88 | ALIPURDUAR | Alipurduar - II | Water Supply Scheme for Chandijhar & adj. mouzas., SM/04129 | New | 28/03/2013 | 06/11/2013 | 30/04/2017 | 11/12/2025 | 6 | 100 | 1 | |||
| 89 | ALIPURDUAR | Alipurduar - II | Ground Water Based Piped Water Supply Scheme for Jashodanga mouza., SM/04157 | New | Northern Mechanical Division II | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | 16/05/2013 | 17/08/2013 | 30/04/2017 | 11/12/2025 | 4 | 100 | 1 | |
| 90 | ALIPURDUAR | Alipurduar - I | Ground Water Based Piped Water Supply Scheme for Munshipara & adj. mouza., SM/04216 | New | 02/09/2016 | 11/04/2017 | 31/08/2019 | 11/12/2025 | 2 | 100 | 3 | |||
| 91 | ALIPURDUAR | Alipurduar - II | Ground Water Based Piped Water Supply Scheme for Loknathpur & adj. mouzas., SM/04487 | New | 02/09/2016 | 07/01/2014 | 31/08/2019 | 11/12/2025 | 5 | 100 | 30 | |||
| 92 | ALIPURDUAR | Falakata | KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME, SM/13239 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick),RWS Falakata Block | 14/10/2022 | 17/01/2023 | 31/05/2025 | 11/12/2025 | 12 | 88 | 78 |
| 93 | ALIPURDUAR | Madarihat | Water Supply Scheme for Mujnai Tea Garden Mouza. , SM/04770 | New | 19/05/2014 | 19/07/2014 | 31/05/2025 | 11/12/2025 | 7 | 90 | 42 | |||
| 94 | ALIPURDUAR | Kumargram | PASCHIM CHENGMARI PIPED WATER SUPPLY SCHEME , SM/13240 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 14/10/2022 | 17/01/2023 | 30/06/2025 | 11/12/2025 | 6 | 88 | 38 |
| 95 | ALIPURDUAR | Kumargram | BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME, SM/13241 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 14/10/2022 | 17/01/2023 | 30/06/2025 | 11/12/2025 | 12 | 50 | 34 |
| 96 | ALIPURDUAR | Madarihat | Dhumchipara Tea Garden Piped Water Supply Scheme , SM/04788 | New | 02/09/2016 | 16/07/2014 | 31/08/2019 | 11/12/2025 | 11 | 100 | 59 | |||
| 97 | ALIPURDUAR | Kumargram | CHUOTA DALDALI PIPED WATER SUPPLY SCHEME., SM/13242 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 14/10/2022 | 16/03/2023 | 31/05/2025 | 11/12/2025 | 11 | 55 | 26 |
| 98 | ALIPURDUAR | Madarihat | Gargenda Tea Garden Piped Water Supply Scheme, SM/04790 | New | Northern Mechanical Division II | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | 02/09/2016 | 30/07/2014 | 31/08/2019 | 11/12/2025 | 12 | 100 | 53 | |
| 99 | ALIPURDUAR | Alipurduar - II | PURBA KHALISHAMARI PIPED WATER SUPPLY SCHEME., SM/13243 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 14/10/2022 | 27/03/2023 | 30/04/2026 | 11/12/2025 | 11 | 89 | 46 |
| 100 | ALIPURDUAR | Alipurduar - I | Paitkapara Tea Garden Piped Water Supply Scheme, SM/04810 | New | 02/09/2016 | 20/01/2016 | 31/05/2025 | 11/12/2025 | 6 | 95 | 55 | |||
| 101 | ALIPURDUAR | Kalchini | NIMTI DOMOHANI PIPED WATER SUPPLY SCHEME, SM/13244 | New | Alipurduar Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 14/10/2022 | 27/03/2023 | 31/05/2025 | 11/12/2025 | 12 | 88 | 60 |
| 102 | ALIPURDUAR | Falakata | Chhota Salkumar Piped Water Supply Scheme, SM/04848 | New | Alipurduar Mechanical Sub Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | 02/09/2016 | 17/03/2015 | 31/05/2025 | 11/12/2025 | 7 | 90 | 69 | |
| 103 | ALIPURDUAR | Kalchini | PASCHIM SATALI PIPED WATER SUPPLY SCHEME, SM/13245 | New | Alipurduar Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 14/10/2022 | 17/01/2023 | 30/06/2025 | 11/12/2025 | 9 | 85 | 66 |
| 104 | ALIPURDUAR | Construction of 43 nos. Rig Bored Tubewells fitted with India Mark-II hand pump in 5 nos. Tea Gardens, SM/04963 | New | 15/12/2014 | 30/06/2021 | 31/05/2021 | 5 | 20 | 0 | |||||
| 105 | ALIPURDUAR | Alipurduar - I | BARIGURI PIPED WATER SUPPLY SCHEME, SM/13246 | New | Alipurduar RWS Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 14/10/2022 | 16/05/2023 | 31/07/2025 | 11/12/2025 | 10 | 70 | 33 |
| 106 | ALIPURDUAR | Construction of 300 nos. Rig Bored Tubewells fitted with India Mark-II hand pump in 2014-2015, SM/04964 | New | 02/09/2016 | 30/06/2021 | 31/05/2021 | 0 | 80 | 0 | |||||
| 107 | ALIPURDUAR | Alipurduar - I | PRODHANPARA PIPED WATER SUPPLY SCHEME, SM/13247 | New | Alipurduar RWS Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 14/10/2022 | 16/03/2023 | 31/05/2025 | 11/12/2025 | 6 | 85 | 34 |
| 108 | ALIPURDUAR | Madarihat | MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME, SM/13248 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block | 14/10/2022 | 27/03/2023 | 31/05/2025 | 11/12/2025 | 11 | 82 | 61 |
| 109 | ALIPURDUAR | Madarihat | Augmentation of Makrapara Tea Garden Piped Water Supply Scheme, SM/05108 | Augmentation | 12/02/2015 | 26/02/2016 | 31/12/2023 | 11/12/2025 | 1 | 100 | 83 | |||
| 110 | ALIPURDUAR | Kalchini | BUXA FOREST (RAJA BHATKHAWA) PIPED WATER SUPPLY SCHEME, SM/13249 | New | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 14/10/2022 | 23/03/2023 | 31/10/2025 | 11/12/2025 | 19 | 20 | 33 |
| 111 | ALIPURDUAR | Alipurduar - II | KAYAKHATA PIPED WATER SUPPLY SCHEME, SM/13299 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 17/10/2022 | 16/03/2023 | 31/12/2025 | 11/12/2025 | 12 | 75 | 49 |
| 112 | ALIPURDUAR | Kumargram | Augmentation of Barovisa Water Supply Scheme, SM/05155 | Augmentation | 25/02/2015 | 09/11/2015 | 31/12/2025 | 11/12/2025 | 13 | 98 | 33 | |||
| 113 | ALIPURDUAR | Alipurduar - II | BRAJERKUTHI PIPED WATER SUPPLY SCHEME, SM/13300 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 17/10/2022 | 17/01/2023 | 31/05/2025 | 11/12/2025 | 16 | 90 | 61 |
| 114 | ALIPURDUAR | Kumargram | Jayanti Tea Garden Piped Water Supply Scheme , SM/05187 | New | 02/09/2016 | 02/07/2015 | 31/12/2023 | 11/12/2025 | 10 | 100 | 82 | |||
| 115 | ALIPURDUAR | Alipurduar - II | PURBA CHIKLIGURI PIPED WATER SUPPLY SCHEME, SM/13301 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 17/10/2022 | 17/01/2023 | 31/07/2025 | 11/12/2025 | 9 | 70 | 53 |
| 116 | ALIPURDUAR | Kalchini | Dima Tea Garden Piped Water Supply Scheme , SM/05189 | New | 02/09/2016 | 09/11/2015 | 30/09/2021 | 11/12/2025 | 5 | 100 | 93 | |||
| 117 | ALIPURDUAR | Alipurduar - I | DAKSHIN BARAJHAR FOREST PIPED WATER SUPPLY SCHEME, SM/13302 | New | Alipurduar RWS Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 17/10/2022 | 19/01/2023 | 30/11/2025 | 11/12/2025 | 5 | 85 | 57 |
| 118 | ALIPURDUAR | Alipurduar - II | Dhaolajhora Tea Garden Piped Water Supply Scheme, SM/05197 | New | 02/09/2016 | 09/11/2015 | 30/04/2026 | 11/12/2025 | 2 | 80 | 83 | |||
| 119 | ALIPURDUAR | Kumargram | TELIPARA PIPED WATER SUPPLY SCHEME., SM/13303 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 17/10/2022 | 31/03/2023 | 30/11/2025 | 11/12/2025 | 8 | 90 | 40 |
| 120 | ALIPURDUAR | Alipurduar - I | Improvement of Dakshin Sonapur Water Supply Scheme by construction of Over Head Reservoir., SM/05243 | Augmentation | 26/08/2015 | 27/04/2015 | 31/12/2017 | 11/12/2025 | 2 | 100 | 150 | |||
| 121 | ALIPURDUAR | Kumargram | MARAKHATA PIPED WATER SUPPLY SCHEME., SM/13304 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 17/10/2022 | 17/01/2023 | 31/05/2025 | 11/12/2025 | 11 | 86 | 45 |
| 122 | ALIPURDUAR | Construction of 150 nos. Rig Bored Tube Well fitted with India Mark-II hand pump in 2015-2016, SM/05248 | New | 26/10/2016 | 30/06/2021 | 31/05/2021 | 0 | 0 | ||||||
| 123 | ALIPURDUAR | Alipurduar - II | DAKSHIN MAJIDKHANA PIPED WATER SUPPLY SCHEME., SM/13305 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 17/10/2022 | 17/01/2023 | 30/04/2027 | 11/12/2025 | 9 | 85 | 62 |
| 124 | ALIPURDUAR | Alipurduar - I | KALABERIA PIPED WATER SUPPLY SCHEME, SM/13306 | New | Alipurduar RWS Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 17/10/2022 | 27/03/2023 | 30/11/2025 | 11/12/2025 | 7 | 75 | 48 |
| 125 | ALIPURDUAR | State Information Education Communication (IEC) Activity for Sustainable Community Development in the Year of 2015-2016 under NRDWP Support Fund, SM/05395 | New | 16/10/2015 | 30/04/2018 | 31/03/2018 | 0 | 100 | 0 | |||||
| 126 | ALIPURDUAR | Kumargram | JAYANTI TEA GARDEN -II AREA PIPED WATER SUPPLY SCHEME, SM/13448 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 02/11/2022 | 06/06/2023 | 30/11/2025 | 11/12/2025 | 7 | 65 | 36 |
| 127 | ALIPURDUAR | Training/Capacity Development for Engineers/VWSC Members/PRI Members/Grassroot Level Workers/Other Stakeholder for the year 2015-2016 under NRDWP Support Fund, SM/05419 | New | 02/11/2015 | 30/04/2018 | 31/03/2018 | 0 | 100 | 0 | |||||
| 128 | ALIPURDUAR | Falakata | ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13449 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 02/11/2022 | 17/01/2023 | 31/12/2025 | 11/12/2025 | 13 | 88 | 73 |
| 129 | ALIPURDUAR | Computerization and MIS Project under NRDWP Support Fund, SM/05428 | New | 16/11/2015 | 30/09/2017 | 30/06/2017 | 0 | 100 | 0 | |||||
| 130 | ALIPURDUAR | Habitation Survey of 4 Districts of West Bengal (Alipurduar, Purulia, Purba Medinipur & Paschim Medinipur) covering total 79 Blocks, SM/05539 | New | 17/02/2016 | 31/05/2021 | 0 | 0 | |||||||
| 131 | ALIPURDUAR | Kalchini | Piped Water Supply Scheme for Jaigaon Development Area (JDA) Based on Sub-Surface Water Source of River Torsa, SM/05647 | New | Alipurduar Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 19/07/2016 | 18/11/2016 | 31/07/2025 | 11/12/2025 | 117 | 86 | 89 |
| 132 | ALIPURDUAR | Temporary W/S Arrangement at Alipurduar Parade Ground, Mallangi Tourist Lodge & Subhasini Tea Garden during the visit of Hon'ble Chief Minister, Govt. of West Bengal from 24-06-2016 to 29-06-2016, SM/05658 | New | 02/09/2016 | 30/06/2021 | 31/05/2021 | 0 | 0 | ||||||
| 133 | ALIPURDUAR | Sinking of 25 Nos. Indian Mark-II tubewell at Sourceless Schools under Alipurduar District, SM/05670 | New | 09/09/2016 | 30/06/2021 | 31/05/2021 | 0 | 30 | 0 | |||||
| 134 | ALIPURDUAR | Training / Capacity Development for Engineers / VWSC Members / PRI Members / Grassroots Level Workers / Other Stakeholder for the year 2016-17 under NRDWP - Support Fund, SM/05684 | New | 27/09/2016 | 30/06/2021 | 31/05/2021 | 0 | 0 | ||||||
| 135 | ALIPURDUAR | Study of Sanitation, Health and Social Impacts in parts of Western Bengal basin with special reference to the Nirmal Bangla Mission [Submitted by : Indian Institute of Technology (IIT), Kharagpur], SM/05685 | New | 27/09/2016 | 30/06/2021 | 31/05/2021 | 0 | 0 | ||||||
| 136 | ALIPURDUAR | Temporary w/s and sanitary arrangement for CAPF & Other Police Personnel during the W.B. Legislative Assembly Election, 2016 within Jalpaiguri & Alipurduar District under Jalpaiguri Divn., PHE Dte., SM/05693 | New | 27/09/2016 | 30/06/2017 | 31/05/2017 | 0 | 100 | 0 | |||||
| 137 | ALIPURDUAR | Kalchini | ATIABARI TEA GARDEN PIPED WATER SUPPLY SCHEME., SM/14092 | New | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 12/12/2022 | 01/03/2023 | 31/05/2025 | 11/12/2025 | 12 | 88 | 70 |
| 138 | ALIPURDUAR | State Information Education Communication (IEC) Activity for Sustainable Community Development for the year 2016-17 under NRDWP - Support Fund, SM/05704 | New | 03/10/2016 | 30/06/2021 | 31/05/2021 | 0 | 0 | ||||||
| 139 | ALIPURDUAR | Kalchini | RAJABHAT TEA GARDEN PIPED WATER SUPPLY SCHEME., SM/14093 | New | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 12/12/2022 | 01/03/2023 | 31/05/2025 | 11/12/2025 | 7 | 90 | 43 |
| 140 | ALIPURDUAR | Honorarium & Maintenance charges of PHED & NGO managed Laboratories under NRDWP Water Quality Monitoring & Surveillance for the year 2016-17, SM/05708 | New | 26/10/2016 | 30/06/2021 | 31/05/2021 | 0 | 1 | ||||||
| 141 | ALIPURDUAR | Alipurduar - II | AUGMENTATION OF BHATIBARI PIPED WATER SUPPLY SCHEME, SM/14096 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 15/12/2022 | 21/12/2022 | 30/04/2026 | 11/12/2025 | 56 | 86 | 51 |
| 142 | ALIPURDUAR | Procurement of Chemicals & Reagents, Annual Service Contract, maintenance of NABL Accreditation status under Water Quality Monitoring & Surveillance for the year 2016-17, SM/05711 | New | 28/10/2016 | 30/06/2021 | 31/05/2021 | 0 | 0 | ||||||
| 143 | ALIPURDUAR | Alipurduar - I | PARARPAR PIPED WATER SUPPLY SCHEME, SM/14209 | New | Alipurduar RWS Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 10/01/2023 | 16/03/2023 | 31/05/2025 | 11/12/2025 | 13 | 70 | 46 |
| 144 | ALIPURDUAR | Establishment and Research & Development for the year 2016-17, SM/05718 | New | 02/11/2016 | 30/06/2021 | 31/05/2021 | 0 | 0 | ||||||
| 145 | ALIPURDUAR | Alipurduar - I | FOSKADANGA PIPED WATER SUPPLY SCHEME, SM/14210 | New | Alipurduar RWS Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 10/01/2023 | 27/03/2023 | 31/07/2025 | 11/12/2025 | 8 | 65 | 53 |
| 146 | ALIPURDUAR | Supply, delivery of Truck Mounted Mobile Water Tanker Unit with GPS Tracking and Smart Filling Station in the different District of West Bengal, SM/05761 | New | Northern Mechanical Division II | Assistant Engineer,Cooch-Behar Mechanical Sub-Division, PHE Dte. | Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2016 | 30/06/2021 | 31/05/2021 | 1 | 0 | |||
| 147 | ALIPURDUAR | Kalchini | BHATKHAWA TEA GARDEN PIPED WATER SUPPLY SCHEME, SM/14211 | New | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 10/01/2023 | 01/03/2023 | 30/06/2025 | 11/12/2025 | 11 | 78 | 35 |
| 148 | ALIPURDUAR | Vertical extension of WTP by incorporating UV Station at proposed Additional MTU, SM/05775 | Augmentation | 17/01/2017 | 30/06/2021 | 31/05/2021 | 0 | 15 | 0 | |||||
| 149 | ALIPURDUAR | Kalchini | BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME, SM/14212 | New | Alipurduar RWS Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 10/01/2023 | 31/01/2023 | 31/05/2025 | 11/12/2025 | 10 | 90 | 69 |
| 150 | ALIPURDUAR | Kalchini | RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME, SM/14213 | New | Alipurduar Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 10/01/2023 | 03/08/2023 | 30/06/2025 | 11/12/2025 | 11 | 50 | 22 |
| 151 | ALIPURDUAR | Kalchini | BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME, SM/14214 | New | Alipurduar Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 10/01/2023 | 16/03/2023 | 31/05/2025 | 11/12/2025 | 9 | 90 | 84 |
| 152 | ALIPURDUAR | Construction of 33 Nos. RBTW fitted with India Mark-II hand pump in 2016-17 under JE / AES, SM/05815 | New | 08/03/2017 | 30/06/2021 | 31/05/2021 | 0 | 3 | ||||||
| 153 | ALIPURDUAR | Kalchini | NIMTIJHORA TEA GARDEN PIPED WATER SUPPLY SCHEME, SM/14215 | New | Alipurduar Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 10/01/2023 | 31/03/2023 | 30/04/2027 | 11/12/2025 | 5 | 90 | 64 |
| 154 | ALIPURDUAR | Madarihat | Hantupara Tea Garden Area Piped Water Supply Scheme, SM/05896 | New | 11/07/2017 | 25/01/2021 | 31/12/2020 | 30/11/2020 | 10 | 100 | 105 | |||
| 155 | ALIPURDUAR | Madarihat | GAROCHIRA BANDAPANI PIPED WATER SUPPLY SCHEME, SM/14216 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 10/01/2023 | 19/01/2023 | 31/05/2025 | 11/12/2025 | 4 | 93 | 67 |
| 156 | ALIPURDUAR | Kalchini | Madhu Tea Garden Area Piped Water Supply Scheme, SM/05897 | New | 11/07/2017 | 24/06/2017 | 31/07/2021 | 11/12/2025 | 7 | 100 | 158 | |||
| 157 | ALIPURDUAR | Madarihat | DAKSHIN RANGALIBAZNA PIPED WATER SUPPLY SCHEME, SM/14217 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 10/01/2023 | 16/03/2023 | 31/05/2025 | 11/12/2025 | 9 | 60 | 47 |
| 158 | ALIPURDUAR | Kumargram | Rahimabad Tea Garden Area Piped Water Supply Scheme, SM/05898 | New | 11/07/2017 | 10/01/2018 | 30/11/2025 | 11/12/2025 | 12 | 90 | 152 | |||
| 159 | ALIPURDUAR | Alipurduar - II | NURPUR PIPED WATER SUPPLY SCHEME., SM/14218 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 10/01/2023 | 01/03/2023 | 31/05/2025 | 11/12/2025 | 11 | 93 | 46 |
| 160 | ALIPURDUAR | Madarihat | Augmentation of Dalmore Tea Garden Piped Water Supply, SM/05899 | Augmentation | 11/07/2017 | 20/08/2017 | 31/03/2024 | 11/12/2025 | 12 | 10 | 87 | |||
| 161 | ALIPURDUAR | Alipurduar - II | TURTURI PIPED WATER SUPPLY SCHEME., SM/14219 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 10/01/2023 | 27/03/2023 | 31/07/2025 | 11/12/2025 | 15 | 75 | 46 |
| 162 | ALIPURDUAR | Madarihat | Dekhlapara Tea Garden Area Piped Water Supply Scheme, SM/05912 | New | Northern Mechanical Division II | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | 31/08/2017 | 28/04/2021 | 30/09/2020 | 31/10/2020 | 7 | 100 | 169 | |
| 163 | ALIPURDUAR | Alipurduar - I | TORSHA FOREST PIPED WATER SUPPLY SCHEME, SM/14220 | New | Alipurduar RWS Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 10/01/2023 | 19/01/2023 | 31/05/2025 | 11/12/2025 | 5 | 90 | 68 |
| 164 | ALIPURDUAR | Construction of RBTW with India Mark-II hand pump under NRDWP 2016-17 [141 Nos.], SM/05988 | New | 08/11/2017 | 31/05/2021 | 4 | 145 | |||||||
| 165 | ALIPURDUAR | Madarihat | BALLALGURI PIPED WATER SUPPLY SCHEME, SM/14221 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block | 10/01/2023 | 01/03/2023 | 31/07/2025 | 11/12/2025 | 7 | 85 | 49 |
| 166 | ALIPURDUAR | State Information Education Communication (IEC) Activity for Sustainable Community Development for the year 2017-18., SM/06018 | New | 01/12/2017 | 31/08/2019 | 0 | 100 | 0 | ||||||
| 167 | ALIPURDUAR | Madarihat | UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME, SM/14222 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 10/01/2023 | 27/03/2023 | 31/07/2025 | 11/12/2025 | 6 | 70 | 54 |
| 168 | ALIPURDUAR | Training / Capacity Development for Engineers / VWSC Members / PRI Members / Plumber / Machanic / Grassroot Level Workers / Other Stakeholder for the year 2017-18., SM/06019 | New | 01/12/2017 | 31/03/2018 | 0 | 100 | 0 | ||||||
| 169 | ALIPURDUAR | Kumargram | PAKRIGURI PIPED WAYER SUPPLY SCHEME., SM/14223 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 10/01/2023 | 31/03/2023 | 31/10/2025 | 11/12/2025 | 14 | 55 | 33 |
| 170 | ALIPURDUAR | Establishment & Research & Development for the year 2017-18, SM/06114 | New | 09/02/2018 | 30/04/2021 | 0 | 0 | |||||||
| 171 | ALIPURDUAR | Madarihat | AUGMENTATION OF BIRPARA WATER SUPPLY SCHEME, SM/14233 | Augmentation | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 11/01/2023 | 17/01/2023 | 30/06/2025 | 11/12/2025 | 45 | 65 | 43 |
| 172 | ALIPURDUAR | Water Quality Monitoring, Programme Management & its Implementation in the State under Water Quality Monitoring & Surveillance for the year 2017-18, SM/06150 | New | 27/03/2018 | 30/04/2021 | 0 | 0 | |||||||
| 173 | ALIPURDUAR | Construction of Office Building for Northern Mechanical Division-II, PHE Dte. at Alipurduar, SM/06172 | New | 30/05/2018 | 11/06/2025 | 31/05/2021 | 13 | 121 | ||||||
| 174 | ALIPURDUAR | Falakata | MAIRADANGA PIPED WATER SUPPLY SCHEME, SM/15206 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 07/02/2023 | 16/05/2023 | 31/05/2025 | 11/12/2025 | 8 | 70 | 49 |
| 175 | ALIPURDUAR | Sanitary and water supply arrangement to the temporary establishment for CAPF/SF & DCRC Centre in connection with General Panchayet Election, 2018, SM/06199 | New | 05/09/2018 | 31/05/2021 | 0 | 122 | |||||||
| 176 | ALIPURDUAR | Falakata | PASCHIM DEOGAON PIPED WATER SUPPLY SCHEME, SM/15207 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 07/02/2023 | 20/07/2023 | 31/12/2025 | 11/12/2025 | 10 | 65 | 38 |
| 177 | ALIPURDUAR | West Bengal Public Health Engineering Department Project Progress Monitoring System (WBPHED-PPMS), SM/06251 | New | 27/11/2018 | 30/04/2021 | 0 | 0 | |||||||
| 178 | ALIPURDUAR | Falakata | DHANIRAMPUR PIPED WATER SUPPLY SCHEME, SM/15208 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 07/02/2023 | 31/03/2023 | 30/06/2025 | 11/12/2025 | 8 | 78 | 76 |
| 179 | ALIPURDUAR | Falakata | Augmentation of existing Ground Water Based Piped Water Supply Scheme for Falakata, SM/06268 | Augmentation | 10/12/2018 | 14/02/2020 | 31/12/2021 | 30/11/2021 | 22 | 100 | 131 | |||
| 180 | ALIPURDUAR | Madarihat | AUGMENTATION OF HANTUPARA TG PIPED WATER SUPPLY SCHEME., SM/15209 | Augmentation | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 07/02/2023 | 13/03/2023 | 30/06/2025 | 11/12/2025 | 5 | 80 | 38 |
| 181 | ALIPURDUAR | Procurement of Chemicals & Reagents & Annual Maintenance Contract of Laboratory instruments under Water Quality Monitoring & Surveillance Programme for 2018-19, SM/06366 | New | 10/01/2019 | 30/04/2021 | 0 | 0 | |||||||
| 182 | ALIPURDUAR | Madarihat | AUGMENTATION OF DHUMCHIPARA TG PIPED WATER SUPPLY SCHEME., SM/15210 | Augmentation | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 07/02/2023 | 13/03/2023 | 31/07/2025 | 11/12/2025 | 7 | 60 | 36 |
| 183 | ALIPURDUAR | Mobile Laboratory Van (MLV) under Water Quality Monitoring & Surveillance Programme, SM/06374 | New | 11/01/2019 | 30/10/2024 | 31/05/2021 | 2 | 104 | ||||||
| 184 | ALIPURDUAR | Kalchini | KALCHINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME, SM/15482 | New | Alipurduar Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 13/02/2023 | 01/03/2023 | 31/07/2025 | 11/12/2025 | 21 | 50 | 31 |
| 185 | ALIPURDUAR | Training/Capacity Building Programme for Engineers/VWSC Members/PRI Members/Plumbers/Mechanics/Grass Root level Workers like SHG Members, ASHA Workers etc. and other Stakeholder for the year 2018-19, SM/06381 | New | 16/01/2019 | 30/04/2021 | 0 | 0 | |||||||
| 186 | ALIPURDUAR | Kumargram | MADHYA KAMAKHYAGURI PIPED WATER SUPPLY SCHEME, SM/15517 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/02/2023 | 01/03/2023 | 31/05/2025 | 11/12/2025 | 14 | 83 | 56 |
| 187 | ALIPURDUAR | Operational charges of PHED & NGO Managed Laboratories & Capacity Building Laboratory Personnel under State Budget, SM/06388 | New | 29/01/2019 | 30/04/2021 | 0 | 0 | |||||||
| 188 | ALIPURDUAR | Alipurduar - II | CHALNIPAK PIPED WATER SUPPLY SCHEME., SM/15534 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block | 16/02/2023 | 01/03/2023 | 30/11/2025 | 11/12/2025 | 14 | 80 | 46 |
| 189 | ALIPURDUAR | Kalchini | Radharani Tea Garden Area Piped Water Supply Scheme, SM/06459 | New | 08/03/2019 | 20/09/2021 | 31/10/2021 | 30/11/2021 | 14 | 100 | 132 | |||
| 190 | ALIPURDUAR | Falakata | NARASINGPUR PIPED WATER SUPPLY SCHEME, SM/15758 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 20/02/2023 | 20/07/2023 | 31/07/2025 | 11/12/2025 | 9 | 70 | 81 |
| 191 | ALIPURDUAR | Support, Customization & Upkeepment of Hardware and Software Based Solutions and ITES Projects etc. under MIS & Computerization, SM/06473 | New | 25/06/2019 | 30/04/2021 | 4 | 0 | |||||||
| 192 | ALIPURDUAR | Kalchini | UTTAR BARAJHAR FOREST PIPE WATER SUPPLY SCHEME, SM/15914 | New | Alipurduar Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 22/02/2023 | 24/04/2023 | 31/12/2025 | 11/12/2025 | 6 | 6 | 13 |
| 193 | ALIPURDUAR | Madarihat | Dimdima Tea Garden Area Piped Water Supply Scheme., SM/06549 | New | 17/10/2019 | 24/06/2021 | 31/05/2021 | 31/05/2021 | 12 | 100 | 150 | |||
| 194 | ALIPURDUAR | Falakata | UMACHARANPUR PIPED WATER SUPPLY SCHEME, SM/16114 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/02/2023 | 02/08/2023 | 02/08/2025 | 11/12/2025 | 10 | 50 | 41 |
| 195 | ALIPURDUAR | Arrangement of drinking water & sanitation facilities for CPMF & SPF accommodation in connection with General Parliamentary Election 2019 under Alipurduar Division., SM/06574 | New | 26/11/2019 | 31/05/2021 | 8 | 175 | |||||||
| 196 | ALIPURDUAR | Alipurduar - I | REJUVENATION OF SIDHABARI PIPED WATER SUPPLY SCHEME, SM/16115 | Augmentation | Birpara Sub-Division | Alipurduar RWS | Birpara Sub Division | 22/02/2023 | 31/01/2023 | 30/06/2025 | 11/12/2025 | 1 | 50 | 26 |
| 197 | ALIPURDUAR | Kalchini | 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME, SM/16506 | New | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 03/03/2023 | 23/03/2023 | 31/12/2025 | 11/12/2025 | 23 | 3 | 19 |
| 198 | ALIPURDUAR | Alipurduar - I | Shifting of pipe line along the flank of Tapshikatha-Shalbari Road with ancillary works infringed due to widening & strengthening of PWD Road for Tapshikatha Water Supply Scheme, SM/06652 | Augmentation | 24/02/2020 | 30/06/2022 | 0 | 0 | ||||||
| 199 | ALIPURDUAR | Kalchini | BUXA PIPE WATER SUPPLY SCHEME, SM/16507 | New | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 03/03/2023 | 23/03/2023 | 31/12/2025 | 11/12/2025 | 7 | 2 | 7 |
| 200 | ALIPURDUAR | Falakata | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jateswar Water Supply Scheme (Phase-1), SM/07057 | Retrofitting | Birpara Sub-Division | Birpara A.E | RWS Falakata Block | 25/11/2020 | 01/12/2020 | 31/05/2025 | 11/12/2025 | 6 | 90 | 141 |
| 201 | ALIPURDUAR | Kumargram | PURBBA NARATHALI PIPED WATER SUPPLY SCHEME., SM/16537 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 10/03/2023 | 27/03/2023 | 31/07/2025 | 11/12/2025 | 15 | 75 | 47 |
| 202 | ALIPURDUAR | Alipurduar - II | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Bakla Piped Water Supply Scheme (Phase-2), SM/07058 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | RWS Alipurduar - II Block | 25/11/2020 | 01/12/2020 | 31/05/2025 | 11/12/2025 | 6 | 90 | 93 |
| 203 | ALIPURDUAR | Alipurduar - II | UTTAR MAJID KHANA PIPED WATER SUPPLY SCHEME, SM/16538 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 10/03/2023 | 17/03/2023 | 31/07/2025 | 11/12/2025 | 10 | 70 | 41 |
| 204 | ALIPURDUAR | Falakata | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Chotosalkumar Piped Water Supply Scheme (Phase-1), SM/07059 | Retrofitting | Birpara Sub-Division | Birpara A.E | RWS Falakata Block | 25/11/2020 | 17/03/2015 | 31/05/2025 | 11/12/2025 | 2 | 90 | 149 |
| 205 | ALIPURDUAR | Kalchini | UTTAR MANDABARI PIPED WATER SUPPLY SCHEME, SM/16539 | New | Alipurduar Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 10/03/2023 | 28/07/2023 | 31/07/2025 | 11/12/2025 | 13 | 75 | 60 |
| 206 | ALIPURDUAR | Alipurduar - I | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Patlakhawa Piped Water Supply Scheme (Phase-1), SM/07060 | Retrofitting | Birpara Sub-Division | Alipurduar RWS | Birpara Sub Division | 25/11/2020 | 01/12/2020 | 31/07/2025 | 11/12/2025 | 3 | 90 | 198 |
| 207 | ALIPURDUAR | Falakata | UTTAR DEOGAON PIPED WATER SUPPLY SCHEME, SM/16817 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 13/03/2023 | 20/07/2023 | 31/07/2026 | 11/12/2025 | 10 | 65 | 59 |
| 208 | ALIPURDUAR | Alipurduar - I | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Patlakhawa Piped Water Supply Scheme (Phase-2), SM/07061 | Retrofitting | Birpara Sub-Division | Alipurduar RWS | Birpara Sub Division | 25/11/2020 | 01/12/2020 | 31/07/2025 | 11/12/2025 | 3 | 55 | 127 |
| 209 | ALIPURDUAR | Falakata | MALSAGAON PIPED WATER SUPPLY SCHEME, SM/16818 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 13/03/2023 | 02/08/2023 | 02/08/2025 | 11/12/2025 | 7 | 70 | 76 |
| 210 | ALIPURDUAR | Kumargram | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Uttar Kamakshyaguri Piped Water Supply Scheme (Phase-1), SM/07062 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | Alipurduar Sub Division | 25/11/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 6 | 95 | 108 |
| 211 | ALIPURDUAR | Falakata | LACHHIMANDABRI PIPED WATER SUPPLY SCHEME, SM/16819 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 13/03/2023 | 03/08/2023 | 31/05/2025 | 11/12/2025 | 8 | 60 | 54 |
| 212 | ALIPURDUAR | Alipurduar - II | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Salsalabari Piped Water Supply Scheme (Phase-2), SM/07063 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | RWS Alipurduar - II Block | 25/11/2020 | 01/12/2020 | 31/05/2025 | 11/12/2025 | 5 | 95 | 111 |
| 213 | ALIPURDUAR | Falakata | BENGKANDI PIPED WATER SUPPLY SCHEME, SM/16820 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 13/03/2023 | 28/07/2023 | 31/05/2025 | 11/12/2025 | 9 | 60 | 58 |
| 214 | ALIPURDUAR | Madarihat | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Hantupara Tea Garden Piped Water Supply Scheme, SM/07064 | Retrofitting | Birpara Sub-Division | Birpara A.E | Birpara Sub Division | 25/11/2020 | 11/07/2017 | 31/05/2025 | 11/12/2025 | 6 | 90 | 180 |
| 215 | ALIPURDUAR | Falakata | DALMONI TEA GARDEN PIPED WATER SUPPLY SCHEME, SM/16821 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 13/03/2023 | 31/03/2023 | 31/07/2025 | 11/12/2025 | 7 | 25 | 9 |
| 216 | ALIPURDUAR | Kumargram | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Kaijali Basty Piped Water Supply Scheme (Phase-2), SM/07065 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | RWS Alipurduar - II Block | 25/11/2020 | 01/12/2020 | 31/05/2025 | 11/12/2025 | 7 | 90 | 46 |
| 217 | ALIPURDUAR | Falakata | TASTI TEA GARDEN PIPED WATER SUPPLY SCHEME., SM/16822 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 13/03/2023 | 12/07/2023 | 31/07/2025 | 11/12/2025 | 10 | 60 | 28 |
| 218 | ALIPURDUAR | Madarihat | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Water Supply Scheme (Phase-2), SM/07066 | Retrofitting | Birpara Sub-Division | Birpara A.E | Birpara Sub Division | 25/11/2020 | 01/12/2020 | 31/05/2025 | 11/12/2025 | 6 | 90 | 97 |
| 219 | ALIPURDUAR | Falakata | DALGAON TEA GARDEN PIPED WATER SUPPLY SCHEME., SM/16823 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 13/03/2023 | 31/03/2023 | 31/12/2025 | 11/12/2025 | 10 | 75 | 38 |
| 220 | ALIPURDUAR | Kalchini | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Radharani T.G Water Supply Scheme (Phase-1), SM/07067 | Retrofitting | Alipurduar Division | HQ-A.E | RWS Kalchini Block | 25/11/2020 | 05/01/2021 | 31/05/2025 | 11/12/2025 | 5 | 95 | 100 |
| 221 | ALIPURDUAR | Madarihat | AUGMENTATION OF GARGENDA TG PIPED WATER SUPPLY SCHEME., SM/16824 | Augmentation | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 13/03/2023 | 22/03/2023 | 30/06/2025 | 11/12/2025 | 13 | 72 | 42 |
| 222 | ALIPURDUAR | Madarihat | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dimdima T.G Water Supply Scheme (Phase-1), SM/07068 | Retrofitting | Alipurduar Sadar Sub-Division | Birpara A.E | Alipurduar Sub Division | 25/11/2020 | 05/01/2021 | 31/05/2025 | 11/12/2025 | 5 | 90 | 91 |
| 223 | ALIPURDUAR | Madarihat | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dimdima T.G Water Supply Scheme (Phase-2), SM/07069 | Retrofitting | Alipurduar Sadar Sub-Division | Birpara A.E | Alipurduar Sub Division | 25/11/2020 | 05/01/2021 | 31/05/2025 | 11/12/2025 | 2 | 90 | 100 |
| 224 | ALIPURDUAR | Alipurduar - I | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Birpara (APD) Piped Water Supply Scheme (Phase-2), SM/07121 | Retrofitting | Birpara Sub-Division | Alipurduar RWS | Birpara Sub Division | 26/11/2020 | 07/12/2020 | 31/05/2025 | 11/12/2025 | 4 | 90 | 96 |
| 225 | ALIPURDUAR | Kumargram | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-III, Phase-2), SM/07122 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | Alipurduar Sub Division | 26/11/2020 | 01/12/2020 | 31/05/2025 | 11/12/2025 | 0 | 95 | 100 |
| 226 | ALIPURDUAR | Kumargram | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-III, Phase-1), SM/07123 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | Alipurduar Sub Division | 26/11/2020 | 01/12/2020 | 31/05/2025 | 11/12/2025 | 5 | 95 | 114 |
| 227 | ALIPURDUAR | Alipurduar - II | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Purba Chenpani Piped Water Supply Scheme (Phase-2), SM/07124 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | Alipurduar Sub Division | 26/11/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 2 | 95 | 86 |
| 228 | ALIPURDUAR | Kumargram | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-II, Phase-2), SM/07125 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | Alipurduar Sub Division | 26/11/2020 | 01/12/2020 | 31/05/2025 | 11/12/2025 | 2 | 95 | 100 |
| 229 | ALIPURDUAR | Kumargram | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-II, Phase-1), SM/07126 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | Alipurduar Sub Division | 26/11/2020 | 01/12/2020 | 31/05/2025 | 11/12/2025 | 3 | 95 | 185 |
| 230 | ALIPURDUAR | Kumargram | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-I, Phase-2), SM/07127 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | Alipurduar Sub Division | 26/11/2020 | 01/12/2020 | 31/05/2025 | 11/12/2025 | 2 | 95 | 108 |
| 231 | ALIPURDUAR | Alipurduar - I | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Tapshikatha Piped Water Supply Scheme (Phase-2), SM/07128 | Retrofitting | Birpara Sub-Division | Alipurduar RWS | Birpara Sub Division | 26/11/2020 | 25/12/2020 | 31/07/2025 | 11/12/2025 | 2 | 61 | 100 |
| 232 | ALIPURDUAR | Falakata | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jagijhora Barabak Piped Water Supply Scheme , SM/07129 | Retrofitting | Birpara Sub-Division | Birpara A.E | RWS Falakata Block | 26/11/2020 | 01/12/2020 | 31/05/2025 | 11/12/2025 | 2 | 90 | 161 |
| 233 | ALIPURDUAR | Madarihat | FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DHUMCHIPARA T.G. Piped Water Supply Scheme, SM/07130 | Retrofitting | Birpara Sub-Division | Birpara A.E | Birpara Sub Division | 26/11/2020 | 01/12/2020 | 30/06/2025 | 11/12/2025 | 6 | 60 | 102 |
| 234 | ALIPURDUAR | Madarihat | FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DHEKLAPARA T.G. Piped Water Supply Scheme, SM/07131 | Retrofitting | Birpara Sub-Division | Birpara A.E | Birpara Sub Division | 26/11/2020 | 13/07/2017 | 30/09/2022 | 11/12/2025 | 1 | 10 | 147 |
| 235 | ALIPURDUAR | Madarihat | FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DALMORE RAMJHORA T.G. Piped Water Supply Scheme (Phase-2), SM/07132 | Retrofitting | Birpara Sub-Division | Birpara A.E | Birpara Sub Division | 26/11/2020 | 01/12/2020 | 30/09/2025 | 11/12/2025 | 6 | 50 | 21 |
| 236 | ALIPURDUAR | Madarihat | FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DALMORE RAMJHORA T.G. Piped Water Supply Scheme (Phase-1), SM/07133 | Retrofitting | Birpara Sub-Division | Birpara A.E | Birpara Sub Division | 26/11/2020 | 01/12/2020 | 31/05/2025 | 11/12/2025 | 6 | 88 | 155 |
| 237 | ALIPURDUAR | Kalchini | Malangi Tea Garden Area Piped Water Supply Scheme, SM/18150 | New | Alipurduar Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 29/03/2023 | 04/05/2023 | 30/06/2026 | 11/12/2025 | 11 | 50 | 18 |
| 238 | ALIPURDUAR | Alipurduar - II | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Purba Chenpani Piped Water Supply Scheme (Phase-1), SM/07134 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | Alipurduar Sub Division | 26/11/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 3 | 95 | 113 |
| 239 | ALIPURDUAR | Falakata | Khagenhat Piped Water Supply Scheme, SM/18151 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 29/03/2023 | 04/05/2023 | 31/05/2025 | 11/12/2025 | 11 | 60 | 36 |
| 240 | ALIPURDUAR | Madarihat | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paschim Khairbari Piped Water Supply Scheme (Phase-1) , SM/07135 | Retrofitting | Birpara Sub-Division | Birpara A.E | Birpara Sub Division | 26/11/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 3 | 95 | 126 |
| 241 | ALIPURDUAR | Kumargram | Chengmari Piped Water Supply Scheme, SM/18152 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 29/03/2023 | 04/05/2023 | 31/07/2025 | 11/12/2025 | 10 | 65 | 54 |
| 242 | ALIPURDUAR | Madarihat | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paschim Khairbari Piped Water Supply Scheme (Phase-2) , SM/07136 | Retrofitting | Birpara Sub-Division | Birpara A.E | Birpara Sub Division | 26/11/2020 | 25/12/2020 | 30/06/2025 | 11/12/2025 | 3 | 80 | 84 |
| 243 | ALIPURDUAR | Kumargram | Dhantali Piped Water Supply Scheme, SM/18153 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 29/03/2023 | 04/05/2023 | 31/07/2025 | 11/12/2025 | 6 | 70 | 51 |
| 244 | ALIPURDUAR | Falakata | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dalimpur Piped Water Supply Scheme (Phase-1) , SM/07137 | Retrofitting | Birpara Sub-Division | Birpara A.E | RWS Falakata Block | 26/11/2020 | 01/12/2020 | 31/07/2025 | 11/12/2025 | 10 | 90 | 158 |
| 245 | ALIPURDUAR | Alipurduar - II | Uttar Dhalkar Piped Water Supply Scheme, SM/18154 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 29/03/2023 | 04/05/2023 | 30/06/2025 | 11/12/2025 | 6 | 70 | 46 |
| 246 | ALIPURDUAR | Madarihat | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Piped Water Supply Scheme (Phase-1) , SM/07138 | Retrofitting | Birpara Sub-Division | Birpara A.E | Birpara Sub Division | 26/11/2020 | 01/12/2020 | 31/05/2025 | 11/12/2025 | 3 | 90 | 160 |
| 247 | ALIPURDUAR | Kalchini | Bhutri Forest Piped Water Supply Scheme, SM/18156 | New | Alipurduar Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 29/03/2023 | 18/04/2023 | 31/05/2025 | 11/12/2025 | 4 | 95 | 34 |
| 248 | ALIPURDUAR | Alipurduar - II | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Bakla Piped Water Supply Scheme (Phase-1), SM/07174 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | RWS Alipurduar - II Block | 04/12/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 3 | 90 | 142 |
| 249 | ALIPURDUAR | Alipurduar - II | Purbba Majherdabri Tea Garden Area Piped Water Supply Scheme, SM/18157 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 29/03/2023 | 22/05/2023 | 31/12/2025 | 11/12/2025 | 5 | 70 | 50 |
| 250 | ALIPURDUAR | Alipurduar - I | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Birpara (APD) Piped Water Supply Scheme (Phase-1), SM/07175 | Retrofitting | Birpara Sub-Division | Alipurduar RWS | Birpara Sub Division | 04/12/2020 | 07/12/2020 | 31/05/2025 | 11/12/2025 | 6 | 90 | 103 |
| 251 | ALIPURDUAR | Alipurduar - I | Parpatla Khawa Piped Water Supply Scheme, SM/18158 | New | Alipurduar RWS Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 29/03/2023 | 04/05/2023 | 31/07/2025 | 11/12/2025 | 6 | 68 | 48 |
| 252 | ALIPURDUAR | Falakata | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Chotosalkumar Piped Water Supply Scheme (Phase-2), SM/07176 | Retrofitting | Birpara Sub-Division | Birpara A.E | RWS Falakata Block | 04/12/2020 | 17/03/2015 | 31/05/2025 | 11/12/2025 | 4 | 90 | 81 |
| 253 | ALIPURDUAR | Falakata | AUGMENTATION OF DALIMPUR PWSS, SM/18254 | Augmentation | 21/06/2023 | 12/07/2023 | 31/10/2025 | 11/12/2025 | 20 | 70 | 55 | |||
| 254 | ALIPURDUAR | Alipurduar - II | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Salsalabari Piped Water Supply Scheme (Phase-1), SM/07177 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | RWS Alipurduar - II Block | 04/12/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 5 | 95 | 192 |
| 255 | ALIPURDUAR | Alipurduar - I | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Munshipara Piped Water Supply Scheme (Phase-1), SM/07178 | Retrofitting | Birpara Sub-Division | Alipurduar RWS | Birpara Sub Division | 04/12/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 2 | 95 | 141 |
| 256 | ALIPURDUAR | Alipurduar - I | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Munshipara Piped Water Supply Scheme (Phase-2), SM/07179 | Retrofitting | Birpara Sub-Division | Alipurduar RWS | Birpara Sub Division | 04/12/2020 | 25/12/2020 | 30/06/2025 | 11/12/2025 | 4 | 95 | 62 |
| 257 | ALIPURDUAR | Madarihat | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Totopara Piped Water Supply Scheme, SM/07180 | Retrofitting | Birpara Sub-Division | Birpara A.E | RWS Madarihat - Birpara Block | 04/12/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 6 | 42 | 26 |
| 258 | ALIPURDUAR | Kumargram | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Kaijali Basty Piped Water Supply Scheme (Phase-1), SM/07181 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | Alipurduar Sub Division | 04/12/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 2 | 90 | 102 |
| 259 | ALIPURDUAR | Alipurduar - II | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Loknathpur and Amp Adj. Mouza Piped Water Supply Scheme (Phase-1), SM/07182 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | RWS Alipurduar - II Block | 04/12/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 2 | 90 | 162 |
| 260 | ALIPURDUAR | Alipurduar - II | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Loknathpur and Amp Adj. Mouza Piped Water Supply Scheme (Phase-2), SM/07183 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | RWS Alipurduar - II Block | 04/12/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 1 | 90 | 95 |
| 261 | ALIPURDUAR | Alipurduar - II | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jashodanga Piped Water Supply Scheme, SM/07184 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | RWS Alipurduar - II Block | 04/12/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 5 | 95 | 130 |
| 262 | ALIPURDUAR | Kumargram | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-1,Phase-1), SM/07185 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | Alipurduar Sub Division | 04/12/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 5 | 95 | 176 |
| 263 | ALIPURDUAR | Kalchini | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Radharani T.G Piped Water Supply Scheme (Phase-2), SM/07186 | Retrofitting | Alipurduar Division | HQ-A.E | RWS Kalchini Block | 04/12/2020 | 05/01/2021 | 31/05/2025 | 11/12/2025 | 8 | 95 | 82 |
| 264 | ALIPURDUAR | Alipurduar - I | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Banchukamari Piped Water Supply Scheme (Phase-1), SM/07187 | Retrofitting | Birpara Sub-Division | Alipurduar RWS | Birpara Sub Division | 04/12/2020 | 25/12/2020 | 31/07/2025 | 11/12/2025 | 5 | 72 | 186 |
| 265 | ALIPURDUAR | Alipurduar - I | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Banchukamari Piped Water Supply Scheme (Phase-2), SM/07188 | Retrofitting | Birpara Sub-Division | Alipurduar RWS | Birpara Sub Division | 04/12/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 4 | 78 | 73 |
| 266 | ALIPURDUAR | Alipurduar - I | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Tapshikhata Piped Water Supply Scheme (Phase-1), SM/07189 | Retrofitting | Birpara Sub-Division | Alipurduar RWS | Birpara Sub Division | 04/12/2020 | 25/12/2020 | 30/06/2025 | 11/12/2025 | 7 | 81 | 158 |
| 267 | ALIPURDUAR | Alipurduar - I | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paitkapara T.G Piped Water Supply Scheme, SM/07190 | Retrofitting | Birpara Sub-Division | Alipurduar RWS | Birpara Sub Division | 04/12/2020 | 20/01/2016 | 31/05/2025 | 11/12/2025 | 4 | 95 | 162 |
| 268 | ALIPURDUAR | Alipurduar - II | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dhaolajhora T.G Piped Water Supply Scheme, SM/07191 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | RWS Alipurduar - II Block | 04/12/2020 | 09/11/2015 | 30/04/2026 | 11/12/2025 | 3 | 80 | 102 |
| 269 | ALIPURDUAR | Kalchini | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Madhu T.G Piped Water Supply Scheme, SM/07192 | Retrofitting | Birpara Sub-Division | HQ-A.E | Birpara Sub Division | 04/12/2020 | 24/06/2017 | 31/07/2021 | 11/12/2025 | 4 | 100 | 200 |
| 270 | ALIPURDUAR | Kalchini | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jayanti Piped Water Supply Scheme, SM/07193 | Retrofitting | Birpara Sub-Division | HQ-A.E | Birpara Sub Division | 04/12/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 4 | 95 | 117 |
| 271 | ALIPURDUAR | Kalchini | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dima T.G Piped Water Supply Scheme, SM/07194 | Retrofitting | Birpara Sub-Division | HQ-A.E | Birpara Sub Division | 04/12/2020 | 09/11/2015 | 30/09/2021 | 11/12/2025 | 3 | 100 | 197 |
| 272 | ALIPURDUAR | Kumargram | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jayanti T.G Piped Water Supply Scheme, SM/07195 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | Alipurduar Sub Division | 04/12/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 3 | 90 | 157 |
| 273 | ALIPURDUAR | Kumargram | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Rahimabad T.G Piped Water Supply Scheme, SM/07196 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | Alipurduar Sub Division | 04/12/2020 | 10/01/2018 | 30/11/2025 | 11/12/2025 | 3 | 90 | 150 |
| 274 | ALIPURDUAR | Madarihat | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Gargenda T.G Piped Water Supply Scheme, SM/07197 | Retrofitting | Birpara Sub-Division | Birpara A.E | Birpara Sub Division | 04/12/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 7 | 80 | 89 |
| 275 | ALIPURDUAR | Madarihat | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Mujnai T.G Piped Water Supply Scheme, SM/07198 | Retrofitting | Birpara Sub-Division | Birpara A.E | Birpara Sub Division | 04/12/2020 | 19/07/2014 | 31/05/2025 | 11/12/2025 | 5 | 90 | 102 |
| 276 | ALIPURDUAR | Madarihat | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Makrapara T.G Piped Water Supply Scheme, SM/07199 | Retrofitting | Birpara Sub-Division | Birpara A.E | Birpara Sub Division | 04/12/2020 | 25/12/2020 | 31/05/2025 | 11/12/2025 | 6 | 90 | 98 |
| 277 | ALIPURDUAR | Kalchini | FHTC under Jaldhara/Jal Sapna including retrofitting of existing distribution system under the command area of Jaigaon & Falakata water supply scheme. , SM/08080 | Retrofitting | Alipurduar Division | HQ-A.E | RWS Kalchini Block | 04/02/2021 | 18/11/2016 | 31/07/2025 | 11/12/2025 | 58 | 86 | 95 |
| 278 | ALIPURDUAR | Madarihat | Supply of potable drinking water to Mujnai Tea Garden in relation with Chaa Sundari Project. , SM/08580 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 10/02/2021 | 25/02/2021 | 31/08/2025 | 11/12/2025 | 11 | 90 | 71 |
| 279 | ALIPURDUAR | Madarihat | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of UTTAR MADARIHAT Water Supply Scheme, SM/08880 | Retrofitting | Alipurduar Sadar Sub-Division | Birpara A.E | Alipurduar Sub Division | 27/09/2021 | 04/10/2021 | 31/05/2025 | 11/12/2025 | 6 | 90 | 100 |
| 280 | ALIPURDUAR | Madarihat | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of UTTAR SISHUBARI Water Supply Scheme, SM/08881 | Retrofitting | Birpara Sub-Division | Birpara A.E | Birpara Sub Division | 27/09/2021 | 04/10/2021 | 30/06/2025 | 11/12/2025 | 7 | 90 | 71 |
| 281 | ALIPURDUAR | Alipurduar - II | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of CHANDIRJHAR Water Supply Scheme, SM/08882 | Retrofitting | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division | Alipurduar Sub Division | 27/09/2021 | 04/10/2021 | 31/05/2025 | 11/12/2025 | 4 | 90 | 99 |
| 282 | ALIPURDUAR | Alipurduar - I | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of SALKUMARHAT Water Supply Scheme, SM/08883 | Retrofitting | Birpara Sub-Division | Alipurduar RWS | Birpara Sub Division | 27/09/2021 | 04/10/2021 | 31/05/2025 | 11/12/2025 | 2 | 90 | 94 |
| 283 | ALIPURDUAR | Kalchini | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of HASIMARA Water Supply Scheme, SM/08884 | Retrofitting | Alipurduar Division | HQ-A.E | RWS Kalchini Block | 27/09/2021 | 04/10/2021 | 30/06/2025 | 11/12/2025 | 14 | 81 | 97 |
| 284 | ALIPURDUAR | Arrangement for supply of safe drinking water after commission of piped water supply schemes, SM/09333 | New | Hooghly Division | Assistant Engineer,Assistant Engineer 1,Assistant Engineer 2,Assistant Engineer Howrah mechanical Sub Division,Assistant Engineer(HQ),Assistant Engineer-I,Assistant Engineer-II,DIC(D)_MMSD(D) | JE (M),Junior Engineer,Junior Engineer-I,Junior Engineer-II,Junior Engineer-III,Junior Engineer-IV | 16/11/2021 | 01/06/2023 | 31/03/2025 | 09/12/2024 | 9,282 | 80 | 75 | |
| 285 | ALIPURDUAR | Alipurduar - I | AUGMENTATION OF BHOLARDABRI PIPE WATER SUPPLY SCHEME, SM/09883 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 11/01/2022 | 31/07/2025 | 11/12/2025 | 27 | 78 | 67 |
| 286 | ALIPURDUAR | Alipurduar - II | AUGMENTATION OF PUTIMARI PIPED WATER SUPPLY SCHEME, SM/09884 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 11/01/2022 | 30/06/2025 | 11/12/2025 | 23 | 85 | 96 |
| 287 | ALIPURDUAR | Falakata | AUGMENTATION OF BHUTNIRGHAT PIPED WATER SUPPLY SCHEME, SM/09885 | Augmentation | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 08/12/2021 | 11/01/2022 | 30/06/2025 | 11/12/2025 | 12 | 90 | 99 |
| 288 | ALIPURDUAR | Alipurduar - II | REJUVENATION OF MADHYA PAROKATA PIPED WATER SUPPLY SCHEME, SM/09886 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 08/12/2021 | 11/01/2022 | 31/05/2025 | 11/12/2025 | 7 | 95 | 95 |
| 289 | ALIPURDUAR | Kalchini | REJUVENATION OF HASIMARA WATER SUPPLY SCHEME, SM/09887 | Augmentation | Alipurduar Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 08/12/2021 | 13/05/2022 | 30/04/2027 | 11/12/2025 | 16 | 98 | 57 |
| 290 | ALIPURDUAR | Alipurduar - II | REJUVINATION OF 'DHAOLAJHORA .T.G WATER SUPPLY SCHEME', SM/09888 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 14/01/2022 | 31/05/2025 | 11/12/2025 | 3 | 95 | 66 |
| 291 | ALIPURDUAR | Alipurduar - II | REJUVENATION OF 'BAKLA WATER SUPPLY SCHEME', SM/09890 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 08/12/2021 | 11/01/2022 | 30/06/2025 | 11/12/2025 | 2 | 98 | 46 |
| 292 | ALIPURDUAR | Alipurduar - I | REJUVENATION OF BANCHUKAMARI WATER SUPPLY SCHEME, SM/09891 | Augmentation | Birpara Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 11/01/2022 | 31/05/2025 | 11/12/2025 | 4 | 82 | 46 |
| 293 | ALIPURDUAR | Alipurduar - II | REJUVINATION OF CHANDIRJHAR WATER SUPPLY SCHEME, SM/09892 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 08/12/2021 | 11/01/2022 | 31/05/2025 | 11/12/2025 | 7 | 98 | 69 |
| 294 | ALIPURDUAR | Alipurduar - II | REJUVENATION OF 'PURBA CHEPANI WATER SUPPLY SCHEME', SM/09893 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 08/12/2021 | 23/03/2023 | 30/06/2025 | 11/12/2025 | 2 | 90 | 67 |
| 295 | ALIPURDUAR | Alipurduar - I | REJUVENATION OF MUNSHIPARA WATER SUPPLY SCHEME, SM/09894 | Augmentation | Birpara Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 14/01/2022 | 30/06/2025 | 11/12/2025 | 5 | 85 | 62 |
| 296 | ALIPURDUAR | Madarihat | Rejuvenation of Makrapara TG WSS., SM/09895 | Augmentation | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 31/01/2022 | 31/05/2025 | 11/12/2025 | 4 | 90 | 95 |
| 297 | ALIPURDUAR | Madarihat | REJUVENATION OF DHUMCHIPARA. T.G. WATER SUPPLY SCHEME, SM/09896 | Augmentation | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 31/01/2022 | 30/06/2025 | 11/12/2025 | 6 | 93 | 66 |
| 298 | ALIPURDUAR | Alipurduar - I | REJUVENATION OF BIRPARA(APD) WATER SUPPLY SCHEME, SM/09897 | Augmentation | Birpara Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 11/01/2022 | 31/05/2025 | 11/12/2025 | 4 | 98 | 83 |
| 299 | ALIPURDUAR | Kalchini | REJUVENATION OF JAYANTI WATER SUPPLY SCHEME, SM/09898 | Augmentation | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 31/01/2022 | 31/05/2025 | 11/12/2025 | 7 | 95 | 82 |
| 300 | ALIPURDUAR | Alipurduar - II | REJUVINATION OF JASHODANGA WATER SUPPLY SCHEME, SM/09899 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Cooch-Behar Mechanical Sub-Division, PHE Dte. | Alipurduar Sub Division,Junior Engineer 1, Northern Mechanical Division-II,PHE Dte. | 08/12/2021 | 31/01/2022 | 31/05/2025 | 11/12/2025 | 6 | 97 | 76 |
| 301 | ALIPURDUAR | Madarihat | REJUVENATION OF 'PASCHIM KHAIRBARI WATER SUPPLY SCHEME', SM/09900 | Augmentation | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 27/12/2021 | 31/07/2025 | 11/12/2025 | 1 | 50 | 6 |
| 302 | ALIPURDUAR | Augmentation Of Lankapara Chasundari Piped Water Supply Scheme, SM/19376 | Augmentation | 08/10/2025 | 08/10/2025 | 08/10/2025 | 3 | 0 | ||||||
| 303 | ALIPURDUAR | Madarihat | REJUVENATION OF HANTUPARA TG WATER SUPPLY SCHEME', SM/09901 | Augmentation | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 23/02/2022 | 30/06/2025 | 11/12/2025 | 6 | 90 | 71 |
| 304 | ALIPURDUAR | Madarihat | REJUVINATION OF ' UTTAR MADARIHAT WATER SUPPLY SCHEME', SM/09902 | Augmentation | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 11/01/2022 | 30/06/2025 | 11/12/2025 | 5 | 86 | 79 |
| 305 | ALIPURDUAR | Falakata | REJUVENATION OF CHOTO SALKUMAR WATER SUPPLY SCHEME, SM/09903 | Augmentation | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 08/12/2021 | 14/01/2022 | 31/05/2025 | 11/12/2025 | 7 | 93 | 66 |
| 306 | ALIPURDUAR | Kalchini | Rejuvenation Of Dima T.G. W.S.S, SM/09904 | Augmentation | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 27/12/2021 | 31/05/2025 | 11/12/2025 | 6 | 70 | 30 |
| 307 | ALIPURDUAR | Alipurduar - II | REJUVENATION OF 'LOKNATHPUR WATER SUPPLY SCHEME', SM/09905 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 08/12/2021 | 11/01/2022 | 30/06/2025 | 11/12/2025 | 9 | 97 | 24 |
| 308 | ALIPURDUAR | Madarihat | Rejuvenation of Gargenda Tea Garden Water Supply Scheme, SM/09906 | Augmentation | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 31/01/2022 | 30/06/2025 | 11/12/2025 | 2 | 94 | 33 |
| 309 | ALIPURDUAR | Alipurduar - II | REJUVENATION OF SALSALABARI WATER SUPPLY SCHEME, SM/09907 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 08/12/2021 | 25/02/2022 | 31/05/2025 | 11/12/2025 | 2 | 98 | 5 |
| 310 | ALIPURDUAR | Alipurduar - I | REJUVENATION OF 'TAPSHIKHATA WATER SUPPLY SCHEME', SM/09908 | Augmentation | Birpara Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 11/01/2022 | 31/05/2025 | 11/12/2025 | 3 | 85 | 70 |
| 311 | ALIPURDUAR | Kalchini | REJUVENATION OF MADHU TG WATER SUPPLY SCHEME, SM/09909 | Augmentation | Alipurduar Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 11/01/2022 | 31/07/2025 | 11/12/2025 | 5 | 72 | 78 |
| 312 | ALIPURDUAR | Alipurduar - I | REJUVENATION OF PAITKAPARA WATER SUPPLY SCHEME, SM/09910 | Augmentation | Birpara Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/12/2021 | 27/12/2021 | 31/05/2025 | 11/12/2025 | 5 | 95 | 49 |
| 313 | ALIPURDUAR | Opening Stock, SM/10027 | New | 0 | 100 | NAN | ||||||||
| 314 | ALIPURDUAR | Madarihat | Dheklapara Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project., SM/10038 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division | 19/01/2022 | 21/02/2022 | 30/06/2025 | 11/12/2025 | 4 | 90 | 31 |
| 315 | ALIPURDUAR | Kalchini | Torsha Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project., SM/10039 | New | Alipurduar Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 19/01/2022 | 26/04/2022 | 30/06/2025 | 11/12/2025 | 10 | 90 | 94 |
| 316 | ALIPURDUAR | Madarihat | Supply of Potable Drinking Water to Lankapara Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project., SM/10054 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Birpara Sub Division | 25/01/2022 | 11/08/2023 | 30/06/2025 | 11/12/2025 | 11 | 75 | 45 |
| 317 | ALIPURDUAR | Kumargram | AUGMENTATION OF NARATHALI PIPED WATER SUPPLY SCHEME, SM/10154 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 11/02/2022 | 01/02/2022 | 30/06/2025 | 11/12/2025 | 22 | 90 | 91 |
| 318 | ALIPURDUAR | Alipurduar - II | REJUVENATION OF TATPARA PIPED WATER SUPPLY SCHEME, SM/10155 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 11/02/2022 | 24/02/2022 | 30/06/2025 | 11/12/2025 | 7 | 90 | 97 |
| 319 | ALIPURDUAR | Falakata | AUGMENTATION OF JATESWAR PIPED WATER SUPPLY SCHEME, SM/10156 | Augmentation | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 11/02/2022 | 01/02/2022 | 30/06/2025 | 11/12/2025 | 22 | 68 | 71 |
| 320 | ALIPURDUAR | Falakata | AUGMENTATION OF JAGIJHORA BARABAK PIPED WATER SUPPLY SCHEME, SM/10169 | Augmentation | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/02/2022 | 17/02/2022 | 31/05/2025 | 11/12/2025 | 13 | 90 | 39 |
| 321 | ALIPURDUAR | Kumargram | REJUVENATION OF UTTAR KAMAKHYAGURI PIPED WATER SUPPLY SCHEME, SM/10170 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/02/2022 | 01/02/2022 | 31/05/2025 | 11/12/2025 | 17 | 92 | 61 |
| 322 | ALIPURDUAR | Alipurduar - II | AUGMENTATION OF UTTAR MAJHER DABRI PIPED WATER SUPPLY SCHEME, SM/10171 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/02/2022 | 01/02/2022 | 31/05/2025 | 11/12/2025 | 21 | 92 | 82 |
| 323 | ALIPURDUAR | Alipurduar - I | MATHURA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME, SM/10172 | New | Birpara Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/02/2022 | 17/02/2022 | 31/05/2025 | 11/12/2025 | 13 | 90 | 75 |
| 324 | ALIPURDUAR | Madarihat | MADARIHAT TEA GARDEN AREA PIPED WATER SUPPLY SCHEME, SM/10173 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/02/2022 | 17/02/2022 | 31/12/2025 | 11/12/2025 | 19 | 88 | 95 |
| 325 | ALIPURDUAR | Alipurduar - I | DAKSHIN PAITKAPARA PIPED WATER SUPPLY SCHEME, SM/10174 | New | Birpara Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/02/2022 | 17/02/2022 | 30/06/2025 | 11/12/2025 | 12 | 90 | 89 |
| 326 | ALIPURDUAR | Alipurduar - I | SIDHABARI PIED WATER SUPPLY SCHEME, SM/10175 | New | Birpara Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/02/2022 | 17/02/2022 | 31/07/2025 | 11/12/2025 | 12 | 65 | 86 |
| 327 | ALIPURDUAR | Kalchini | MECHPARA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME, SM/10176 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/02/2022 | 17/02/2022 | 31/07/2025 | 11/12/2025 | 11 | 75 | 73 |
| 328 | ALIPURDUAR | Madarihat | JAYBIRPARA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME, SM/10177 | New | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/02/2022 | 17/02/2022 | 31/05/2025 | 11/12/2025 | 7 | 70 | 71 |
| 329 | ALIPURDUAR | Madarihat | GOPALPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME, SM/10178 | New | Alipurduar Sadar Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,Birpara A.E | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/02/2022 | 17/02/2022 | 30/06/2025 | 11/12/2025 | 17 | 85 | 92 |
| 330 | ALIPURDUAR | Kumargram | CHUNIA JHORA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME, SM/10179 | New | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/02/2022 | 17/02/2022 | 31/12/2025 | 11/12/2025 | 7 | 90 | 94 |
| 331 | ALIPURDUAR | Kalchini | GANGUTIA TEA GARDEN AREA PIPED WATER SUPPLY SHEME, SM/10180 | New | Birpara Sub-Division | Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte.,HQ-A.E | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/02/2022 | 17/02/2022 | 31/05/2025 | 11/12/2025 | 7 | 86 | 94 |
| 332 | ALIPURDUAR | Alipurduar - I | AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME, SM/10316 | Augmentation | Birpara Sub-Division | Alipurduar RWS,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 04/03/2022 | 02/05/2022 | 30/06/2025 | 11/12/2025 | 17 | 85 | 26 |
| 333 | ALIPURDUAR | Kalchini | Providing FHTC of existing LDS under command area UTTARLATABARI WSS at Kalchini Block., SM/10637 | Augmentation | Birpara Sub-Division | HQ-A.E | Birpara Sub Division | 21/04/2022 | 11/05/2022 | 30/06/2025 | 11/12/2025 | 13 | 85 | 49 |
| 334 | ALIPURDUAR | Alipurduar - II | AUGMENTATION OF BAKLA WATER SUPPLY SCHEME, SM/10667 | Augmentation | Alipurduar Sadar Sub-Division | Alipurduar Sadar Sub Division,Assistant Engineer,Alipurduar Mechanical Sub-Division,PHE Dte. | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 29/04/2022 | 21/11/2022 | 31/07/2025 | 11/12/2025 | 8 | 61 | 32 |
| Total | 11,887 | # | 57.5 | |||||||||||