Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
11 500.68 272.93 54.51  
1 ALIPURDUAR Kumargram Northern Mechanical Division II MARAKHATA PIPED WATER SUPPLY SCHEME. , SM/13304 New QUOTATION FOR NEW SERVICE CONNECTION AT MARAKHATA PWSS PH NO-I BILL/00037/2023-2024 BP-2023-24-15 27/04/2023 WBSEDCL 1.21 0.00 0 0
2 ALIPURDUAR Kumargram Northern Mechanical Division II MARAKHATA PIPED WATER SUPPLY SCHEME. , SM/13304 New QUOTATION FOR NEW SERVICE CONNECTION AT MARAKHATA PWSS PH NO-II BILL/00038/2023-2024 BP-2023-24-26 27/04/2023 WBSEDCL 1.21 0.00 0 0
3 ALIPURDUAR Kumargram Alipurduar Division MARAKHATA PIPED WATER SUPPLY SCHEME. , SM/13304 New Material Requisition To Resource Division RTOR000037/2023-2024 1475/ALD 16/08/2023 Resource Division 29.72 0.00 0 0
4 ALIPURDUAR Kumargram Alipurduar Division MARAKHATA PIPED WATER SUPPLY SCHEME. , SM/13304 New Providing balance FHTC for MARAKHATA PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000215/2023-2024 1569/ALD 23/08/2023 30 HARI CONSTRUCTION 4.69 0.00 0 0
5 ALIPURDUAR Kumargram Alipurduar Division MARAKHATA PIPED WATER SUPPLY SCHEME. , SM/13304 New Supply of CIDF & CISS Pipes and specials for Marakhata WSS Under Alipurduar Division P.H.E Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000225/2023-2024 1598/ALD 25/08/2023 30 HARI CONSTRUCTION 6.76 6.76 100 100
6 ALIPURDUAR Kumargram Alipurduar Division MARAKHATA PIPED WATER SUPPLY SCHEME. , SM/13304 New Material Requisition To Resource Division RTOR000107/2023-2024 131/ALD 10/01/2024 Resource Division 8.44 0.00 0 0
7 ALIPURDUAR Kumargram Alipurduar Division MARAKHATA PIPED WATER SUPPLY SCHEME. , SM/13304 New Constructions of P/H and T/W Boring by ODEX-165 Method of drilling at HW and 2nd site , LDS with UPVC P/L inclu. rising main and delivery connection, Cons. of 200 Cum OHR as per Departmental Design & drawing alongwith soil investigation, providing FHTC and others allied works for MARAKHATA PWSS Under Alipurduar Division PHE DTE. Alipurduar Sadar Sub Division Alipurduar RWS,Birpara Sub Division ORD/000436/2022-2023 2863/ALD 17/01/2023 720 HARIDAS GHOSH 355.80 236.35 66.43 27
8 ALIPURDUAR Kumargram Northern Mechanical Division II MARAKHATA PIPED WATER SUPPLY SCHEME. , SM/13304 New ADDITIONAL QUOTATION FOR MARAKHATA PWSS PH NO-2 BILL/00044/2024-2025 BP-01/24-25 08/04/2024 WBSEDCL 4.30 0.00 0 null
9 ALIPURDUAR Kumargram Northern Mechanical Division II MARAKHATA PIPED WATER SUPPLY SCHEME. , SM/13304 New ADDITIONAL QUOTATION FOR MARAKHATA PWSS PH NO-2 BILL/00044/2024-2025 BP-01/24-25 08/04/2024 WBSEDCL 4.30 0.00 0 null
10 ALIPURDUAR Kumargram Alipurduar Division MARAKHATA PIPED WATER SUPPLY SCHEME. , SM/13304 New Laying of rising main line with HDPE PN10, horizontal boring by HDD method , bridge and culvert crossing, Supply of DI pipe and specials, construction of pathway, surface drain and chatal, installation of paver block, land development along with the other allied works at MARAKHATA HW site PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division,Birpara Sub Division ORD/000369/2023-2024 85/ALD 10/01/2024 270 HARIDAS GHOSH 65.13 21.09 32.38 35
11 ALIPURDUAR Kumargram Northern Mechanical Division II MARAKHATA PIPED WATER SUPPLY SCHEME. , SM/13304 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for MARAKHATA water supply scheme, TW no I and II under Northern Mechanical Division-II, PHE Dte.Alipurduar. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000696/2023-2024 2160/NMD-II 27/07/2023 30 S.S ENTERPRISES 19.12 8.73 45.66 100
Total 500.66 272.93 54.51