Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 1,573.42 619.74 39.39  
1 ALIPURDUAR Falakata Alipurduar Division NARASINGPUR PIPED WATER SUPPLY SCHEME , SM/15758 New Material Requisition To Resource Division RTOR000041/2023-2024 1480/ALD 16/08/2023 0 Resource Division 21.43 0.00 0 0
2 ALIPURDUAR Falakata Alipurduar Division NARASINGPUR PIPED WATER SUPPLY SCHEME , SM/15758 New Material Requisition To Resource Division RTOR000064/2023-2024 2774 18/12/2023 0 Resource Division 15.16 0.00 0 0
3 ALIPURDUAR Falakata Alipurduar Division NARASINGPUR PIPED WATER SUPPLY SCHEME , SM/15758 New Material Requisition To Resource Division RTOR000067/2023-2024 2774/ALD 18/12/2023 0 Resource Division 15.16 0.00 0 0
4 ALIPURDUAR Falakata Northern Mechanical Division II NARASINGPUR PIPED WATER SUPPLY SCHEME , SM/15758 New Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Narsingpur Water Supply Scheme TW No.-I and II under NMD-II,PHE.Dte,Apd. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Northern Mechanical Division-II,PHE ORD/000898/2023-2024 2474/NMD-II 11/08/2023 541 SUMON ELECTRICAL 21.78 9.02 41.41 90
5 ALIPURDUAR Falakata Alipurduar Division NARASINGPUR PIPED WATER SUPPLY SCHEME , SM/15758 New Rising Main, Laying of DI (K7), gap filling of HDPE pipe, construction of sluice valve chamber for washout purpose in the command area of NARASINGPUR PWSS under Alipurduar Division, PHE Dte. Birpara A.E RWS Falakata Block ORD/000322/2023-2024 2417/ALD 09/11/2023 60 DILIP MAHATO 36.67 35.44 96.65 80
6 ALIPURDUAR Falakata Alipurduar Division NARASINGPUR PIPED WATER SUPPLY SCHEME , SM/15758 New Laying of Rising main, delivery main, bypass arrangement, laying of HDPE pipeline for left out household connecting to Narasingpur PWSS (both H/W and 2nd site) (SM/15758) of Birpara Sub-Division under Alipurduar Division, PHE Dte. Birpara A.E RWS Falakata Block ORD/000492/2023-2024 748/ALD 12/03/2024 120 DILIP MAHATO 91.41 79.14 86.58 85
7 ALIPURDUAR Falakata Northern Mechanical Division II NARASINGPUR PIPED WATER SUPPLY SCHEME , SM/15758 New NEW SERVICE CONNECTION CHARGE FOR NARSINGHPUR PH NO-I BILL/03017/2023-2024 BP-2023-24-694 14/03/2024 0 WBSEDCL 7.52 0.00 0 0
8 ALIPURDUAR Falakata Northern Mechanical Division II NARASINGPUR PIPED WATER SUPPLY SCHEME , SM/15758 New NEW SERVICE CONNECTION CHARGES FOR NARASINGPUR PWSS TW NO-II BILL/03012/2023-2024 BP-2023-24-689 14/03/2024 0 WBSEDCL 7.52 0.00 0 0
9 ALIPURDUAR Falakata Alipurduar Division NARASINGPUR PIPED WATER SUPPLY SCHEME , SM/15758 New Construction of tube wells (2 nos.) by Reverse rotary method of drilling at HW site and 2nd TW site , Soil investigation at OHR site, constructions of 400 Cum OHR at HW , construction of pump house and boundary wall at H/W and 2nd site, laying of rising main, distribution line and providing FHTC as per Departmental Design & drawing for Narasingpur PWSS Under Birpara Subdivision, Alipurduar Division PHE DTE. Birpara A.E RWS Falakata Block ORD/000174/2023-2024 1048/ALD 20/07/2023 672 DILIP MAHATO 567.48 496.14 87.43 90
10 ALIPURDUAR Falakata Northern Mechanical Division II NARASINGPUR PIPED WATER SUPPLY SCHEME , SM/15758 New Yard lighting arrangement at Head Work Site for Different PWSS (PASCHIM DEOGAON and others) under JJM in the BLOCK: Falakata, DISTRICT: ALIPURDUAR under NMD-II,PHE Dte. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Northern Mechanical Division-II,PHE ORD/000169/2025-2026 1385/NMD-II 26/06/2025 30 M/S SAJAHAN CHOWDHURY 20.56 0.00 0 0
11 ALIPURDUAR Falakata Northern Mechanical Division II NARASINGPUR PIPED WATER SUPPLY SCHEME , SM/15758 New Solarization of grid connected pumping installation at Different PWSS at Falakata Block in the dist.of Alipurduar under JJM programme under Northern Mechanical Division-II, PHE Dte Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Northern Mechanical Division-II,PHE ORD/000134/2025-2026 1344/NMD-II 19/06/2025 90 M/S SAJAHAN CHOWDHURY 42.58 0.00 0 0
12 ALIPURDUAR Falakata Northern Mechanical Division II NARASINGPUR PIPED WATER SUPPLY SCHEME , SM/15758 New Implementation of Affordable IoT-Enabled Water Service Delivery Measurement and Monitoring Sensing System for Rural Deployment in the Proposed Villages Under Different Water Supply Schemes at Diferrent Block of Alipurduar District in West Bengal Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division,,Junior Engineer 1, Northern Mechanical Division-II,PHE ,Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000062/2025-2026 1155/NMD-II 19/05/2025 180 WEBEL TECHNOLOGY LIMITED 726.15 0.00 0 0
Total 1,573.42 619.74 39.39