1 |
ALIPURDUAR |
Madarihat |
Alipurduar Division |
UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14222 |
New |
Providing FHTC from existing distribution system as per specification for Uttar Rangalibazna PWSS under Alipurduar Division, PHE Dte. |
Birpara A.E |
Birpara Sub Division |
ORD/000304/2023-2024 |
2135/ALD |
03/10/2023 |
30 |
MANI PRADHAN |
1.08 |
0.00 |
0 |
0 |
2 |
ALIPURDUAR |
Madarihat |
Northern Mechanical Division II |
UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14222 |
New |
NEW CONNECTION SERVICE FOR UTTAR RANGALIBAZNA PWSS P/H NO II |
|
|
BILL/01796/2023-2024 |
BP-2023-24-363 |
27/09/2023 |
|
WBSEDCL |
5.74 |
0.00 |
0 |
0 |
3 |
ALIPURDUAR |
Madarihat |
Northern Mechanical Division II |
UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14222 |
New |
NEW CONNECTION SETRVICE FOR UTTAR RANGALIBAZNA PWSS P/H NO I
APPLICATION NO 4003065172 |
|
|
BILL/01793/2023-2024 |
BP-2023-24-362 |
27/09/2023 |
|
WBSEDCL |
7.70 |
0.00 |
0 |
0 |
4 |
ALIPURDUAR |
Madarihat |
Alipurduar Division |
UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14222 |
New |
Material Requisition To Resource Division |
|
|
RTOR000055/2023-2024 |
2701/ALD |
12/12/2023 |
|
Resource Division |
84.45 |
0.00 |
0 |
0 |
5 |
ALIPURDUAR |
Madarihat |
Alipurduar Division |
UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14222 |
New |
Material Requisition To Resource Division |
|
|
RTOR000090/2023-2024 |
114/ALD |
10/01/2024 |
|
Resource Division |
4.49 |
0.00 |
0 |
0 |
6 |
ALIPURDUAR |
Madarihat |
Alipurduar Division |
UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14222 |
New |
Cons. of Rig bored TW(2nos) by ODEX-165 method of drilling at HW and 2nd site, cons of 100 cum OHR at HW including soil testing, cons. of P/H and B/W at HW,2nd site, Laying of rising main, distribution line and providing FHTC as per Departmental Design & drawing , providing FHTC and others allied works for Uttar Rangalibazna PWSS under Birpara Sub-Division, Alipurduar Division, PHE DTE. |
Birpara A.E |
Birpara Sub Division |
ORD/000546/2022-2023 |
3570/ALD |
27/03/2023 |
918 |
SAMIRON PODDER |
271.90 |
0.00 |
0 |
11 |
7 |
ALIPURDUAR |
Madarihat |
Northern Mechanical Division II |
UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME , SM/14222 |
New |
Supply, delivery, installation, commissioning and trial run of electro-mechanical components along with Cu wound line voltage corrector for UTTAR RANGALIBAZNA water supply scheme, TW no I and II under Jal Jeevan Mission under NMD-II, PHE Dte. Alipurduar. |
Assistant Engineer,Alipurduar Mechanical Sub-Division,P |
Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, |
ORD/000685/2023-2024 |
2139/NMD-II |
27/07/2023 |
615 |
DILIP MAHATO |
18.33 |
0.00 |
0 |
85 |