Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
40 1,685.06 858.14 50.93  
1 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Schedule for: Supply, delivery and installation of 30 KVA servo motor operated Copper wound line voltage corrector at Purba Kathalbari Water Supply Scheme TW No.-II under NMD-II,PHE.Dte,Alipurduar. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000651/2021-2022 1097/NMD-II 20/09/2021 30 NIRMAN 3.94 3.94 100 0
2 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Laying of different dia. Pipeline and providing FHTC for Purba Kathalbari Zone(IV) PWSS area and surrounding, Alipurduar-I Block under Alipurduar Division, PHE Dte.(Part-A) Alipurduar RWS Birpara Sub Division ORD/000165/2022-2023 995/ALD 15/07/2022 60 DAS ENTERPRISE 99.06 67.23 67.87 27
3 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Soil investigation work at 4 different places of Purba Kanthalbari within Alipurduar District under Alipurduar Division PHE Dte. Alipurduar RWS ORD/000157/2022-2023 1006/ALD 15/07/2022 30 MABCO CONSULTANT, 4.87 4.87 100 27
4 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Providing Functional Tap Connection (FHTC) in connection with Jaldhara/JalSwapna (Schools, AWC and others) for PurbaKathalbari PWSS under Alipurduar Division, PHE Dte. Part-4 Alipurduar RWS Birpara Sub Division ORD/000145/2022-2023 982/ALD 15/07/2022 45 DAS CONSTRUCTION 24.14 0.00 0 27
5 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Laying Distribution of pipeline with DI and UPVC pipeline along with FHTC Connection at Jogendranagar area, Purba Kathalbari WSS under Alipurduar Division, PHE Dte. Alipurduar RWS Birpara Sub Division ORD/000159/2022-2023 989/ALD 15/07/2022 60 UTTAM KUMAR DUTTA 98.45 87.43 88.81 27
6 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Providing Functional Tap Connection (FHTC) in connection with Jaldhara/JalSwapna (Schools, AWC and others) for Purba Kathalbari PWSS under Alipurduar Division, PHE Dte. Part-3 Alipurduar RWS Birpara Sub Division ORD/000144/2022-2023 981/ALD 15/07/2022 45 MAHENDRA CHHETRI 24.20 7.33 30.29 26
7 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation NEW SERVICE CONNECTION CHARGE FOR PURBA KATHALBARI zONE-IV P/H NO.I BILL/00676/2023-2024 BP-2023-24-198 22/06/2023 WBSEDCL 1.71 0.00 0 0
8 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation NEW SERVICE CONNECTION CHARGE FOR PURBA KATHALBARI zONE-III P/H NO.II BILL/00678/2023-2024 BP-2023-24-196 22/06/2023 WBSEDCL 1.71 0.00 0 0
9 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation NEW SERVICE CONNECTION CHARGE FOR PURBA KATHALBARI zONE-I P/H NO.II BILL/00679/2023-2024 BP-2023-24-195 22/06/2023 WBSEDCL 1.71 0.00 0 0
10 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation NEW SERVICE CONNECTION CHARGE FOR PURBA KATHALBARI zONE-III P/H NO.I BILL/00677/2023-2024 BP-2023-24-197 22/06/2023 WBSEDCL 1.71 0.00 0 0
11 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Construction of Pump House, Boundary Wall, Tube well Boring by Reverse Rotary Method of drilling including Rising Main at H/W site and 2nd site along with repairing of 1 no. pump house for Purba Kathalbari Zone-I PWSS Under Alipurduar Division PHE DTE. Alipurduar RWS Birpara Sub Division ORD/000169/2022-2023 1007/ALD 15/07/2022 90 SAMIRON PODDER 43.06 40.49 94.03 0
12 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Laying of different dia. Pipeline and providing FHTC for Southern side of Purba Kathalbari Zone (II) PWSS and surrounding areas at Alipurduar-I Block under Alipurduar Division, PHE Dte. Alipurduar RWS Birpara Sub Division ORD/000167/2022-2023 997/ALD 15/07/2022 60 M/S JHA CONSTRUCTION 99.69 76.99 77.23 27
13 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Purba Kanthalbari water supply scheme, TW no I and II of Zone-II under Northern Mechanical Division-II, PHE Dte.Alipurduar Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000794/2023-2024 2366/NMD-II 08/08/2023 30 SUMON ELECTRICAL 22.50 0.00 0 0
14 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation QUOTATION FOR NEW SERVICE CONNECTION AT PURBA KATHALBARI PWSS PALASHBARI, FLOOD SHELTER, ZONE-I,P/H NO-I BILL/01448/2023-2024 BP-2023-24-293 21/08/2023 WBSEDCL 6.38 0.00 0 0
15 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Providing FHTC from existing distribution system as per specification for PURBA KATHALBARI PWSS under Alipurduar Division, PHE Dte. Alipurduar RWS Birpara Sub Division ORD/000288/2023-2024 1996/ALD 15/09/2023 60 M/S SIBU DEY AND CO 24.20 0.00 0 0
16 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Development of TW, Yield testing with BHT Pump and water sample collection and chemical test at different tubewell of Purba Kathal Bari PWSS at Alipurduar-I Block, Alipurduar Division PHED. Alipurduar RWS ORD/000351/2022-2023 2495/ALD 13/12/2022 60 SAMIRON PODDER 5.68 0.00 0 0
17 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Construction of Pump House, Boundary Wall, Tube well Boring by Reverse Rotary Method of drilling including Rising Main at H/W site and 2nd site for Purba Kathalbari Zone-III PWSS Under Alipurduar Division PHE DTE. Alipurduar RWS Birpara Sub Division ORD/000168/2022-2023 1008/ALD 15/07/2022 90 MADHAB SAHA 45.90 39.60 86.27 86
18 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Laying of different dia. Pipeline and providing FHTC for Purba Kathalbari Zone(IV) PWSS area and surrounding area of NH-31D at Alipurduar-I Block under Alipurduar Division, PHE Dte.(Part-B) Alipurduar RWS Birpara Sub Division ORD/000166/2022-2023 996/ALD 15/07/2022 60 NARAYAN CHANDRA SAHA 99.18 75.08 75.7 76
19 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Construction of Pump House, Boundary Wall, Tube well Boring by Reverse Rotary Method of drilling including Rising Main at H/W site and 2nd site for Purba Kathalbari Zone-IV PWSS Under Alipurduar Division PHE DTE. Alipurduar RWS Birpara Sub Division ORD/000143/2022-2023 980/ALD 15/07/2022 180 MAHENDRA CHHETRI 46.09 27.06 58.71 60
20 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Construction of OHR 200cum for PURBA KATHALBARI ZONE-II Water Supply Scheme under Alipurduar Division, PHE Dte. Alipurduar RWS Birpara Sub Division ORD/000161/2022-2023 991/ALD 15/07/2022 180 MS DEYS CONSTRUCTION 55.50 25.00 45.05 55
21 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Material Requisition To Resource Division RTOR000025/2022-2023 1590/ALD 14/09/2022 Resource Division 130.15 0.00 0 0
22 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Laying Distribution of pipeline with DI and UPVC pipeline along with FHTC Connection for Purba Kathalbari area, Purba Kathalbari WSS under Alipurduar Division, PHE Dte. Alipurduar RWS Birpara Sub Division ORD/000158/2022-2023 988/ALD 15/07/2022 60 NEOGI ENTERPRISE 98.79 80.10 81.08 30
23 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Purba Kanthalbari water supply scheme, TW no I and II of Zone-I under Northern Mechanical Division-II, PHE Dte.Alipurduar. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000801/2022-2023 368/NMD-II 22/02/2023 30 ALPHA ENTERPRISE 22.84 9.79 42.86 60
24 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Purba Kanthalbari water supply scheme, TW no I and II of Zone-IV under Northern Mechanical Division-II, PHE Dte.Alipurduar. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000050/2023-2024 1107/NMD-II 05/06/2023 30 SUMON ELECTRICAL 22.86 10.10 44.18 70
25 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Construction of 250cum OHR for PURBA KATHALBARI ZONE-I Water Supply Scheme under Alipurduar Division, PHE Dte. Alipurduar RWS Alipurduar RWS ORD/000155/2022-2023 987/ALD 15/07/2022 180 NEOGI ENTERPRISE 57.61 19.01 33 35
26 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Construction of OHR 200cum for PURBA KATHALBARI ZONE-III Water Supply Scheme under Alipurduar Division, PHE Dte. Alipurduar RWS Birpara Sub Division ORD/000152/2022-2023 986/ALD 15/07/2022 180 MADHAB SAHA 55.36 34.75 62.77 51
27 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation NEW SERVICE CONNECTION CHARGES FOR PURBA KATHALBARI PWSS ZONE-II P/H NO-II BILL/02806/2023-2024 BP-2023-24-646 29/02/2024 WBSEDCL 9.80 0.00 0 null
28 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Laying of DI and HDPE pipeline, Trenchless Pipe laying by HDD Process & other works for PURBA KATHALBARI ZONE-I 3rd pump house area for Purba Kathalbari PWSS of Alipurduar RWS Sub-Division under Alipurduar Division, PHE Dte. (SM/11459) Alipurduar RWS Birpara Sub Division ORD/000503/2023-2024 821/ALD 14/03/2024 120 KAJAL KUMAR DE 39.26 0.00 0 0
29 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Laying of different dia., CIDF, DI, UPVC, HDPE Pipeline, Trenchless Pipe laying by HDD Process, HDPE pipe line for left out household connection, Trial and run the entire PURBA KATHALBARI ZONE-4 PWSS Scheme with maintaining for 3 months after successfully running water, cons. of surface drain, pathway at H/W site and other works for Purba Kathalbari PWSS of Alipurduar RWS Sub-Division under Alipurduar Division, PHE Dte. (SM/11459) Alipurduar RWS Birpara Sub Division ORD/000530/2023-2024 849/ALD 14/03/2024 120 NARENDRA BHADANI. 57.56 9.40 16.33 0
30 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Construction of 150cum. OHR for PURBA KATHALBARI ZONE-IV Water Supply Scheme under Alipurduar Division, PHE Dte. Alipurduar RWS Birpara Sub Division ORD/000149/2022-2023 984/ALD 15/07/2022 720 MAHENDRA CHHETRI 50.44 29.62 58.72 52
31 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Laying of different dia., CIDF, DI, UPVC, HDPE Pipeline, Trenchless Pipe laying by HDD Process, HDPE pipe line for left out household connection,Trial and run the entire PURBA KATHALBARI ZONE-3 PWSS Scheme with maintaining for 3 months after successfully running water, cons. of surface drain, pathway at H/W site and other works works for Purba Kathalbari PWSS of Alipurduar RWS Sub-Division under Alipurduar Division, PHE Dte. (SM/11459) Alipurduar RWS ORD/000534/2023-2024 892/ALD 15/03/2024 120 MADHAB SAHA 49.29 0.00 0 0
32 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Purba Kanthalbari water supply scheme, TW no I and II of Zone-III under Northern Mechanical Division-II, PHE Dte,Apd. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000048/2023-2024 1085/NMD-II 01/06/2023 30 M/S P.P ELECTRICALS 22.85 10.73 46.96 100
33 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Hiring of Diesel Vehicle Maxi Cab(At least 7 seater ) for Assistant Engineer, Alipurduar RWS Sub-Division, P.H.E. Dte.(from 01.01.2023 to 31.12.2023) Alipurduar RWS JUNIOR ENGINEER ORD/000416/2022-2023 2731/ALD 30/12/2022 365 KAMALESH ROY 4.80 0.00 0 100
34 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Construction of Pump House, Boundary Wall, Tube well Boring by Reverse Rotary Method of drilling including Rising Main at H/W site and 2nd site for Purba Kathalbari Zone-II PWSS Under Alipurduar Division PHE DTE. Alipurduar RWS Birpara Sub Division ORD/000142/2022-2023 979/ALD 15/07/2022 720 JYOTI CHHETRI 45.88 19.14 41.72 20
35 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Laying of different dia. Pipeline and providing FHTC for Northern side of Purba Kathalbari Zone (II) PWSS and surrounding areas at Alipurduar-I Block under Alipurduar Division, PHE Dte. Alipurduar RWS Birpara Sub Division ORD/000141/2022-2023 978/ALD 15/07/2022 60 DILIP MAHATO 99.77 76.96 77.14 15
36 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation QUOTATION CHARGES FOR PURBAKATHALBARI PWSS, ZONE-II PH NO-II BILL/00276/2024-2025 BP-80/24-25 16/05/2024 WBSEDCL 11.03 0.00 0 null
37 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Laying Distribution pipe with DI and UPVC pipe along with FHTC Connection surrounding Palashbari area, Purba Kathalbari WSS under Alipurduar Division, PHE Dte. Alipurduar RWS Birpara Sub Division ORD/000164/2022-2023 994/ALD 15/07/2022 180 BENGAL YOUTH UN EMPLOYED ENGINEERS CO OPERATIVE SOCIETY LIMITED 87.56 44.57 50.9 28
38 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Laying Distribution pipe with DI and UPVC pipe along with FHTC Connection surrounding Sirubari area, Purba Kathalbari WSS under Alipurduar Division, PHE Dte. Alipurduar RWS Birpara Sub Division ORD/000163/2022-2023 993/ALD 15/07/2022 60 MS DEYS CONSTRUCTION 99.93 58.95 58.99 85
39 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Hiring of Diesel Vehicle Maxi Cab (At least 7 seater ) for Deputy Superintending Engineer, North Bengal Circle-I , P.H.E. Dte.(from 01.03.2023 to 29.02.2024) HQ-A.E Birpara Sub Division ORD/000473/2022-2023 3232/ALD 27/02/2023 365 MAHENDRA CHHETRI 4.80 0.00 0 0
40 ALIPURDUAR Alipurduar Division AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME , SM/11459 Augmentation Hiring of Diesel Vehicle Maxi Cab(At least 7 seater ) for Assistant Engineer, Alipurduar RWS Sub-Division, P.H.E. Dte.(from 01.01.2024 to 31.12.2024) Alipurduar RWS JUNIOR ENGINEER ORD/000499/2023-2024 488/ALD 15/02/2024 365 SASANKA ROY 4.80 0.00 0 0
Total 1,685.05 858.12 50.93